Welcome to T$R’s New Website

Thank you for exploring T$R’s new website! There’s more to come! Doubleview Gold’s profile will be added soon! Stay tuned!

AI-generated depiction of ESGold's  Montauban's mill and tailings · Not an actual photograph

AI-generated depiction of ESGold’s mill and tailings ·
Not an actual photograph

Last Updated — 2026-11-17

ESGold

CSE: ESAUOTCQB: ESAUFFSE: Z7D

Montauban Gold-Silver Project Montauban Township, Québec, Canada
Approx. 80 km from Québec City & 60 km from Trois-Rivières

Project Stage:
  • Permitted pre-production; installation, commissioning & drilling underway.
  • ESGold reports funding through first doré; production and revenue pending.
ESGold Company Disclosure Pathways · F42 | T$R
New to T$R Company Disclosure Pathways? Start hereSelect + to open the reader guide before exploring the pathways.

About this page

Individual disclosures show pieces of the story. This original T$R initiative connects ESGold’s dated public disclosures into an evolving record organized by pathway, stage and step. It shows what ESGold has reported, how developments fit together, and what remains outstanding—helping shareholders see the bigger picture while the story is still unfolding.

How to read the pathways

T$R groups ESGold’s public disclosures by subject.

Disclosed by ESGold

“Disclosed by ESGold” identifies what the linked company document reports. The status applies only to the event, plan, study assumption or condition named in the note.

Likely stepUnconfirmed by ESGold

“Likely step · Unconfirmed by ESGold” describes a practice an operator in comparable circumstances would ordinarily use and explains why. ESGold has not specifically disclosed that step. Its inclusion gives no forecast of ESGold’s actions or timing. A related disclosure beneath a Likely step supplies context.

Select a stage to view its sub-steps. Sub-step details are shown in full. The full view includes both kinds of entry. “ESGold disclosures only” shows sourced sub-steps. Stage numbers provide a reading order. Counts refer to sub-steps. Use search, the status filter, glossary links and the dated source register to locate information.

Progress shown for a disclosed activity

Completed

Named event reported complete.

Underway

Work reported in progress on the displayed date.

Planned

Stated company objective.

Pending

Expressly reported pending.

Conditions apply

Disclosed term or prerequisite.

Reported

Documented fact at the stated date.

Dates, sources and navigation

Disclosures reviewed through November 10, 2026. The release date and the date of a measurement can differ. Open a company-source link to read the original document. Glossary links open a definition, and Close or Escape returns to the same place.

Suggested reading route

  1. Go to the project overview
  2. Find an answer in the FAQs
  3. Go to the Production Development pathway
  4. Go to the District-Scale Exploration pathway
  5. Go to Disclosure history
  6. Go to the company source register

Choose “Full pathway view” to see both company-disclosed activities and explicitly labelled Likely steps. Choose “ESGold disclosures only” to see entries supported by company sources.

ESGOLD CORP. · MONTAUBAN

T$R Company Disclosure Pathways

An original T$R initiative, available exclusively on The Shareholder Report.

Grounded in ESGold’s public disclosures. The details, the connections and the bigger picture.

Follow ESGold’s reported progress, see how its disclosures connect, and find what remains unconfirmed.

Disclosures reviewed through November 10, 2026

Updated labels identify content revised for the latest reviewed disclosure. They indicate a page-content change, not completion of an activity. See what changed.

01 / COMPANY-DISCLOSED ACTIVITY

Montauban at a glance

At Montauban in Québec, ESGold describes two programs advancing in parallel: completing the tailings-processing facility to recover gold and silver and exploring the bedrock beneath and beyond the historic mine. Each snapshot summarizes the disclosures for one pathway. The dated title links to its latest relevant update.

Production Development at a glanceUpdated · Nov 10

PurposeRecover gold and silver from historic tailings, with permitted plant capacity of up to 1,000 tonnes per day.[3] A definitive Ocean Partners agreement covers future doré.[4]

Latest disclosed positionUpdated · Nov 10Pre-production; mill-completion work and processing commencement remain objectives. The November 3 release described ESGold as pre-production and Montauban as under construction.[10] Commissioning was reported underway in September.[3] The October shareholder letter reported 19 equipment containers onsite, six additional flat-rack containers at sea and three preparing to leave China.[9]

Latest developmentUpdated · Nov 10The Form 5A dated November 9 and posted November 10 targets remaining mill completion within the next six months, including installation, testing and commissioning, at an estimated C$2.5 million. It separately targets historic-tailings processing within the same stated six-month period, after mill completion and commissioning, with estimated start-up costs of C$750,000. Preliminary construction-material evaluation is targeted within the next twelve months at an estimated C$200,000; it remains exploratory and at the MOU stage.[11]

Still unconfirmedUpdated · Nov 10Receipt of all remaining equipment, completed plant integration and commissioning, actual processing and first doré remain unconfirmed in the selected disclosures reviewed through November 10, 2026. Aggregate supply remains subject to testing, applicable approvals and definitive agreements; the two MOUs’ combined indicative maximum of 500,000 tonnes annually is not guaranteed demand.[1][10]

Latest production planning disclosure · ; report dated November 9

ESGold Form 5A Annual Listing Summary

Go to Production Development pathway

District-Scale Exploration at a glanceUpdated · Nov 10

PurposeTest whether mineralization continues between historical drill holes and extends beyond the former mine workings.

Latest disclosed field positionApproximately 4,074 m of the planned 5,000 m drilled, as reported October 20; final drilled metres remained subject to reconciliation.[2]

Latest planning disclosureUpdated · Nov 10The Form 5A dated November 9 and posted November 10 estimates C$3.1 million for continued drilling and evaluation of recent drilling and other exploration work within the next twelve months. The objective is to assess additional mineralization potential and determine whether further exploration is warranted.[11]

Exploration contextDrilling had extended south and deeper than the historic mine.[2] New core observations were being incorporated into the integrated 3D model, which draws on the expanded survey covering approximately 70 km².[2][7]

Still unconfirmedUpdated · Nov 10The Form 5A supplies no new assay results, final drilling total, current bedrock resource estimate or final next-phase hole list. October 20 remains the latest exploration field update tracked here; the November filing is a planning update.

Latest exploration planning disclosure · ; report dated November 9

ESGold Form 5A Annual Listing Summary

Go to District-Scale Exploration pathway

“Still unconfirmed” refers to outcomes not established in the disclosures reviewed through November 10, 2026. It does not mean the work is late.

Sources for these snapshots

Production Development

District-Scale Exploration

Additional snapshot sources

The letter repeats the October 20 drilling figures and refers to upcoming assays; it provides no new assay results or final program total.[9]

Additional company source

Plant and production

Planned primary product
Gold and silver doréView the company objective
Permitted plant capacity
Up to 1,000 tonnes per daySeptember 10, 2026 disclosureView plant authorization details
The November 3 release states that Montauban is permitted to process up to 300,000 tonnes of historic tailings annually; an increase requires the requisite permits.
Source (1)
Technical study
2025 PEA Effective July 21, 2025View technical study summary

Property and exploration

Location
Notre-Dame-de-Montauban, Québec2025 technical study · Property access mapView project location map (opens in a new tab)
Reported land positionUpdated · Nov 10
June 30, 2026 · Annual MD&A265 claims / approximately 13,116 haOctober 2026 · Company presentation485 claims / approximately 24,414 haUpdated · Nov 10November 9, 2026 · Form 5A Section 5(a)485 claims / 24,414 ha

The filing repeats the larger reported land position; it does not reconcile the different June 30 figure.

View land details
Source (1)
Planned drilling program
5,000 m / 29 proposed holes September 3, 2026 programView drilling plan

3 connection diagrams · 4 consolidated tables

How the disclosures fit together

See the relationships ESGold describes and compare key facts in one place. Each view links to the company disclosures and the detailed pathway entries. Review cutoff: November 10, 2026; individual facts retain their own dates.

Reading the diagrams: arrows show a company-described relationship or designed process. They do not mark completed work or promise an outcome. Dashed borders identify objectives or pending results.

Connections explained

Diagram 01How the two pathways connectUpdated · Nov 10ESGold’s stated production-to-exploration funding objective.
ESGold’s stated funding objective
Production DevelopmentRecover gold and silver

Planned processing of historic tailings.

Intended to generate
Company objectivePotential operating cash flow

The presentation describes a future source of funding.

Intended to support
District-Scale ExplorationSupport exploration

Company objective: reduce reliance on dilution.

This is a company objective, not a reported cash-flow result. The November 3 release describes ESGold as pre-production and Montauban as under construction.[4] Exploration drilling had already begun on September 3; it does not depend on waiting for first production.[3]

Updated · Nov 10The November 9 Form 5A adds estimated costs and next-six-/twelve-month objectives for mill completion, processing start-up and exploration. It does not establish operating cash flow or identify how much exploration will be financed from future production. Exploration remains a parallel program rather than an activity proven to be funded by operating cash flow. [6]

Sources (6)
Diagram 02How the processing circuit connectsThe designed route from tailings processing to doré.
Simplified designed flowsheet · September 10 disclosure
Feed preparationScreen, separate and grind

Screening and separation → grinding.

Leaching and solution preparationLeach, clarify and deoxygenate

Cyanide leaching → clarification and deoxygenation.

Metal recoveryPrecipitate and produce doré

Merrill–Crowe precipitation → gold and silver doré.

Falcon concentrator Gravity recovery within the broader circuit.

Industrial thickeners Solid–liquid separation and process-water recovery.

The arrows summarize the designed processing sequence. ESGold reported commissioning underway on September 10; this diagram does not show that every system was installed, tested or operating.

Source (1)
Diagram 03How exploration evidence connectsHistorical records, ANT, drilling, the model and pending assays.
How ESGold connects geological evidence and exploration decisions
Existing evidenceHistorical drilling and records

Historical drill information, geology and mine records.

Modern surveysANT and geochemistry

Geophysical interpretation, structural geology and multi-element data.

Integrated into
Interpretation3D geological model

Combines evidence to interpret the geology and prioritize targets.

Targets tested by drilling
Reported October 20Drill-core observations

New observations are being incorporated into the model and follow-up targeting.

Pending October 20Laboratory assays

Required to establish metal grades. Publication follows receipt, review and validation.

The model is an interpretive tool, not a mineral resource estimate. Geophysical targets and visible sulphides do not establish grade, tonnage or mineralization continuity. The arrows show connections described by ESGold, not a guarantee of discovery.

Sources (3)

Key facts compared

Table 01Permits and conditions in one tablePlant capacity, feed sources, drilling, crown pillar and aggregate reuse.
Permits and conditions · scope matters
ActivityWhat ESGold disclosedDate, limits and source
Tailings processing plantPermitted capacity of up to 1,000 tonnes per day.
The November 3 release states that Montauban is permitted to process up to 300,000 tonnes of historic tailings annually; an increase requires the requisite permits.[1]
Source (1)
September 10, 2026.[2] Capacity is distinct from achieved throughput.
Source (1)
Tailings feed sourcesThe PEA identified Anacon Lead 1 as authorized.At the July 21, 2025 study date, other tailings sites required ministerial authorization.
Source (1)
Exploration drillingQuébec’s Authorization of Impact-Causing Exploration Work (ATI) received.Announced July 28, 2026 for the planned drilling program.[4]
Source (1)
Potential crown-pillar extractionRemains subject to further evaluation and any required approvals.ESGold identified additional drilling, technical evaluation, engineering review and economic analysis as conditions. The drilling ATI does not establish extraction approval.
Source (1)
Potential aggregate supplyESGold announced a second non-binding MOU with Gestion D.S. 50 Inc. for up to 200,000 metric tonnes annually.[6] Together with Culture H. Dolbec Inc.’s October 29 MOU for up to 300,000, the proposed combined supply is up to 500,000 metric tonnes annually.[6]Future supply requires material characterization, environmental testing, applicable regulatory approvals and definitive agreements.[6] These volumes are indicative maximums, not guaranteed deliveries, purchases or minimum commitments.[6] Pricing and other commercial terms remain unset.[6]
Source (1)

The proposed aggregate volume, permitted tailings-processing limits, PEA processing schedule and actual operating throughput describe different things. They are not interchangeable.

Table 02Equipment progress in one tableUpdated · Nov 10Component deliveries, shipment status and plant commissioning.
Equipment and plant progress · disclosed milestones
Equipment or systemReported milestoneDate, scope and source
Doré furnaceArrived at Montauban.June 11, 2026 delivery announcement.[1]
Source (1)
Mobile water-treatment equipmentDelivered to site.Reported July 21, 2026.
Source (1)
China-manufactured equipmentInspections and shipment approval announced July 21.[2] The October shareholder letter reports 19 equipment containers onsite, six additional flat-rack containers at sea and three preparing to leave China.[3]The two dated container reports are not reconciled in the reviewed disclosures. Do not infer a revised total order or an explanation for the different counts.
Source (1)
Falcon concentratorArrived at Montauban.September 10, 2026.[4] Installation, integration and commissioning were to follow arrival.
Source (1)
Industrial thickenersArrived at Montauban.September 10, 2026.[5] Included in the ongoing plant integration program.
Source (1)
Plant-wide commissioningCommissioning activities had commenced.Reported September 10, 2026, continuing as systems were installed, integrated and tested.[6] This was not a statement that commissioning was complete.
Source (1)
The letter reports advancing installation and commissioning preparations, and identifies circuit integration among the next activities.[7] Receipt of all remaining equipment, completed plant integration and commissioning, and first production remain unconfirmed in the disclosures reviewed through November 10, 2026.
Source (1)
Source (1)

Updated · Nov 10Latest planning update — Form 5A dated November 9, posted November 10, 2026: ESGold targets the remaining mill-completion work, including outstanding equipment installation, testing and commissioning, within the next six months at an estimated C$2.5 million. This is one combined milestone estimate, not a separate budget for each component above. The filing does not confirm all deliveries or completed commissioning. [8]

Table 03Resources and estimates in one tableTailings, mica, historical bedrock, the model and reserves.
Resources, historical estimates and exploration interpretations
Material or categoryDisclosed estimate or positionBasis and source
Tailings · Indicated603,700 tonnes
Gold: 0.40 g/t · Silver: 31.45 g/t
Recoverable gold: 6,950 oz
Recoverable silver: 470,050 oz
March 2, 2023 estimate reproduced in the 2025 PEA, Table 14-7.[1]
Source (1)
Tailings · Inferred319,300 tonnes
Gold: 0.41 g/t · Silver: 36.93 g/t
Recoverable gold: 3,800 oz
Recoverable silver: 291,200 oz
Same Table 14-7 basis.[2] The source discrepancy is explained below.
Source (1)
Mica · Inferred estimate57,200 tonnes of mica concentrate.A separate concentrate estimate; not a confirmed sale.
Source (1)
Read mica test work and sales context
Historical bedrock estimatesNot treated as current resources or reserves.September 3, 2026: insufficient Qualified Person work to classify them as current.[4] Further work will assess whether a current estimate is warranted.
Source (1)
ANT / integrated modelGeological interpretation and exploration targeting.September 15, 2026: the model is not a mineral resource estimate and does not establish grade, tonnage or continuity.[5]
Source (1)
Mineral reservesNo current mineral reserves reported in the PEA.Section 15 of the report effective July 21, 2025.[6]
Source (1)

The gold and silver ounce figures above are recoverable, applying 89.3% gold and 77.0% silver recoveries. Table 14-7 gives 291,200 oz inferred recoverable silver; Table 25-1 gives 291,900 oz.[7][8] This summary retains Table 14-7, matching the detailed pathway. These categories and materials are kept separate; no combined resource total is calculated.

Sources (2)
Table 04Financial information in one tableUpdated · Nov 10Reported finances, financing disclosures and study projections.
Financial information · reporting bases kept separate
Measure or funding sourceDisclosed amountReporting basis and qualification
Company financial position · June 30, 2026 · audited consolidated figures
Cash and cash equivalentsC$16,212,859Balance at June 30, 2026; not a current-day cash balance.[1]
Current assetsC$16,920,518At June 30, 2026.
Current liabilitiesC$2,870,765At June 30, 2026.
Working capitalC$14,049,753At June 30, 2026.[1] Current assets less current liabilities.
Total liabilitiesC$3,320,557At June 30, 2026.
Cash used in operating activitiesC$2,411,230For the year ended June 30, 2026.[1] A full-year flow, not a balance at that date.
Sources and qualificationStatements authorized October 22, 2026.The audited statements identify a material going-concern uncertainty.[1]
Sources (3)
Financing disclosures · proceeds and conditional access are different measures
Flow-through financingC$4.505 million gross proceeds.December 2025 closing.[4] Qualifying exploration expenditure obligations apply; this is not a statement of cash still available.
Source (1)
LIFE equity financingC$7,264,440 gross proceeds.March 10, 2026 closing.[5] Gross proceeds are distinct from net proceeds and remaining cash.
Source (1)
Ocean Partners facilityUp to C$9 million, in C$3 million and C$6 million tranches.Optional and conditional. Zero drawn at June 30, 2026. The facility limit is not added to reported cash.
Sources (2)
Project study economics · 2025 PEA projections, not operating results
NPV at a 5% discount rateC$44.53M before tax
C$24.27M after tax.
Updated study case.[10] The PEA is preliminary and includes inferred resources.
Internal rate of return (IRR)105.1% before tax
60.3% after tax.
Modeled project returns; not realized shareholder or operating returns.
Capital and working capitalC$18.813M capital summary.
C$2.128M additional working capital.
Table 1-3 study estimates, not a current remaining-construction-cost statement.
Operating costC$35.29 per tonneTable 1-4 · Q1 2023 constant dollars. Not a reported actual operating cost.
Sources and assumptionsGold US$2,900/oz; silver US$31.72/oz; mica US$300/t; US$1 = C$1.45.Report effective July 21, 2025; signed August 29. This uses the updated Section 22 case. The detailed panel retains the report’s differing Section 25.6 figures and their 2023 context.
Sources (3)
Forward milestone estimates · Form 5A dated November 9, posted November 10, 2026
Updated · Nov 10Mill completionC$2,500,000Within the next six months; includes remaining installation, testing and commissioning. [11]
Updated · Nov 10Historic-tailings processing start-upC$750,000Within the next six months, following mill completion and commissioning. [11]
Updated · Nov 10ExplorationC$3,100,000Continued drilling and evaluation within the next twelve months. [11]
Updated · Nov 10Construction-material evaluationC$200,000Preliminary testing/evaluation within the next twelve months; exploratory and at the MOU stage. [11]

No amounts from the three groups are added together. The earlier March 31 financial comparison remains in the detailed pathway; its nine-month cash-flow period differs from the annual period shown here.

Updated · Nov 10T$R calculation: the four estimates total C$6,550,000; the mill and processing estimates total C$3,250,000. These are sums of the listed estimates, not an issuer-reconciled full budget or financing shortfall. Do not add them to cash, the facility limit, financing proceeds or the PEA capital estimate. No current cash-to-cost reconciliation is supplied by Section 5(c), which refers to the attached annual statements and MD&A. [11]

Source (1)

Open questions across both pathways

“Outstanding” means the reviewed disclosures haven’t confirmed an outcome. Work may have taken place without a public update, and an open question does not mean the work is late.

Based on disclosures reviewed through November 10, 2026. Each question shows the latest relevant evidence and the information that would answer it.

Production Development · 6 open questionsUpdated · Nov 10

Remaining equipment delivery

Latest disclosed position · The October shareholder letter reports 19 equipment containers onsite, six additional flat-rack containers at sea and three preparing to leave China.

Confirmation needed · A dated company update confirming receipt of the remaining equipment.

First production or onsite doré pourUpdated · Nov 10

Latest disclosed position · The November 9 Form 5A targets historic-tailings processing within the next six months, after mill completion and commissioning, with estimated start-up costs of C$750,000. It does not confirm first processing or an onsite doré pour and does not give a separate firm first-pour date. The October 29 disclosure described Montauban as under construction and ESGold as pre-production. [source]

Confirmation needed · A company announcement identifying first production or an onsite pour and its date.

Source (1)

Residue suitability for construction useUpdated · Nov 10

Latest disclosed position · The November 9 Form 5A targets preliminary construction-material testing and evaluation within the next twelve months at an estimated C$200,000. The initiative remains exploratory and at the MOU stage; the filing provides no suitability test results. Future supply remains subject to material characterization, environmental testing, applicable regulatory approvals and definitive agreements. [source]

Confirmation needed · Reported test results establishing suitability for the proposed use.

Source (1)

Definitive aggregate terms and deliveries

Latest disclosed position · ESGold announced a second non-binding MOU with Gestion D.S. 50 Inc. for up to 200,000 metric tonnes annually. Together with Culture H. Dolbec Inc.’s October 29 MOU for up to 300,000, the proposed combined supply is up to 500,000 metric tonnes annually. These volumes are indicative maximums, not guaranteed deliveries, purchases or minimum commitments. Pricing and other commercial terms remain unset.

Confirmation needed · Separate confirmation of applicable approvals, definitive agreements or actual deliveries.

Facility borrowing after June 30

Latest disclosed position · Annual statements authorized October 22 report zero drawn at June 30; the facility is optional and conditional.

Confirmation needed · A later disclosure stating an amount drawn and its date.

Mica buyer or purchase agreement

Latest disclosed position · The 2025 PEA said ESGold had no mica client at that time and intended to approach prospective buyers.

Confirmation needed · A dated company disclosure identifying a buyer or commercial agreement.

District-Scale Exploration · 5 open questionsUpdated · Nov 10

Pending drill assays

Latest disclosed position · On October 20, ESGold said laboratory assays were pending; results require review and validation before publication.

Confirmation needed · A company release reporting reviewed assay results for the relevant holes or samples.

Final drilling total and program status

Latest disclosed position · The October 20 update reported approximately 4,074 m against the 5,000 m plan, with the final total subject to reconciliation.

Confirmation needed · A company update confirming final metres and the program’s status.

Final transfer of the 44 claims

Latest disclosed position · The October annual filings confirm C$70,000 and 600,000 shares delivered; the July agreements included transfers and CSE approval as conditions.

Confirmation needed · Company confirmation of the relevant transfers, approvals or closing, with its scope.

Targets selected for the 2027 frameworkUpdated · Nov 10

Latest disclosed position · The November 9 Form 5A adds a broad twelve-month objective and C$3.1 million estimate for continued drilling and evaluation. It does not specify the final next-phase targets, metreage, hole count or detailed schedule. The September 15 framework described database validation and target ranking before selecting drilling opportunities. [source]

Confirmation needed · A company update naming the selected targets and planned drilling scope.

Source (1)

Decision on a current bedrock resource estimate

Latest disclosed position · The September disclosures describe further work to assess historical estimates and whether a current estimate may be warranted.

Confirmation needed · A company decision to undertake estimation work or publication of a current estimate for the specified area.

Company-stated plans, conditions and sequencesUpdated · Nov 10

A dated summary of plans and requirements ESGold has described in its disclosures, including the order of related work. A listed condition does not by itself confirm that it has been met.

ActivityCompany disclosure
Equipment shipmentsThe October shareholder letter reports 19 equipment containers onsite, six additional flat-rack containers at sea and three preparing to leave China.[1] The letter reports advancing installation and commissioning preparations, and identifies circuit integration among the next activities.[1]
Source (1)
Commissioning

On September 10, ESGold reported progressive installation, integration and testing.[2]

Source (1)
The letter reports advancing installation and commissioning preparations, and identifies circuit integration among the next activities.
Source (1)
Aggregate reuseESGold announced a second non-binding MOU with Gestion D.S. 50 Inc. for up to 200,000 metric tonnes annually.[4] Together with Culture H. Dolbec Inc.’s October 29 MOU for up to 300,000, the proposed combined supply is up to 500,000 metric tonnes annually.[4] Future supply requires material characterization, environmental testing, applicable regulatory approvals and definitive agreements.[4] These volumes are indicative maximums, not guaranteed deliveries, purchases or minimum commitments.[4] Pricing and other commercial terms remain unset.[4]
Source (1)
Working capital

Access to each Ocean Partners tranche is subject to the agreement’s conditions.[5]

Source (1)
Land agreements

The July agreements specify claim transfers and CSE approval as closing conditions.[6] The annual financial statements record delivery of C$70,000 and 600,000 shares.[7]

Sources (2)
Drilling and assay publication

ESGold reported approximately 4,074 m of its planned 5,000 m.[8] Logging, sampling and model integration continued. ESGold plans to publish assays after receipt, review and validation.[9] On October 20, model integration using other data was already underway.[8]

Sources (2)
Source (1)
New Form 5A objectives · report dated November 9, posted November 10, 2026
Updated · Nov 10Mill completionRemaining installation, testing and commissioning; next six months; C$2.5 million estimated for the combined work. [11]
Updated · Nov 10Processing commencementNext six months, following mill completion and commissioning; C$750,000 estimated start-up cost. No separate deadline for first doré, revenue or commercial production is stated. [11]
Updated · Nov 10ExplorationContinued drilling and evaluation of recent work; next twelve months; C$3.1 million estimate. This is not an assay-publication deadline or a commitment to a current mineral resource. [11]
Updated · Nov 10Construction-material evaluationPreliminary testing/evaluation of processed tailings for aggregate use; next twelve months; C$200,000 estimate. MOU-stage, exploratory work; approvals, definitive agreements and sales remain separate outcomes. [11]
Source (1)

02 / QUESTIONS & ANSWERS

ESGold questions answered

Find answers drawn from ESGold’s public disclosures, with dated sources and links to the relevant pathway entries. Where the reviewed disclosures do not provide an answer, that is stated clearly.

110 questions · 12 topics · Company disclosures reviewed through November 10, 2026.

Company plans, targets and study estimates are identified as such. An outcome not confirmed in the reviewed disclosures may still have occurred without a public update. For the focused list of unresolved pathway outcomes, see Open questions across both pathways.

Company and project overviewUpdated · Nov 108 questions
What does ESGold do, and what is its main business focus?

ESGold describes Montauban in Québec as its principal restoration and recovery project.[1] It is developing a plant to recover gold and silver from historic tailings while exploring the surrounding hard-rock mineral system. The November 3 release describes ESGold as pre-production and Montauban as under construction.[3]

Sources (3)
Where is Montauban, and what ownership interest does ESGold hold?

Montauban is in the municipality of Notre-Dame-de-Montauban, Québec, approximately 80 kilometres west of Québec City. The PEA states that ESGold holds 100% of the claims comprising the property at the report date.[1] Later agreements concern additional claims; the July 2026 agreements also specify a 100% interest, subject to their closing conditions.[3]

Sources (3)
What was historically mined at Montauban, and why do its tailings still contain valuable metals?

ESGold’s presentation records past lead, zinc, gold and silver production.[1] Tailings are material left after earlier processing. The current tailings resource estimate and metallurgical work identify gold and silver remaining in that material that the proposed plant is designed to recover.[2] Historical mine production is separate from ESGold’s future production objectives.

Sources (2)
How does reprocessing historic tailings differ from developing a new hard-rock mine?

At Montauban, the production plan in the PEA concerns previously mined tailings.[1] The exploration program tests bedrock around and beyond the historic mine. ESGold says potential crown-pillar extraction requires further technical evaluation, permitting and engineering review; the exploration model is not a current mineral resource or reserve.[2]

Sources (2)
Why are Production Development and District-Scale Exploration shown as separate pathways?

ESGold’s July 28 update distinguishes its tailings-processing project from its complementary exploration program. The pathways follow that distinction: one tracks plant development and related commercial activities; the other tracks land, modeling, drilling and evaluation. They can advance in parallel, and a disclosure can affect one or both.

Source (1)
Which products does ESGold intend to produce, and which commercial arrangements has it confirmed?Updated · Nov 10

The primary planned product is gold and silver doré, covered by a definitive purchase agreement with Ocean Partners.[1] The PEA also evaluates mica without identifying a current customer at the report date.[2] The two non-binding aggregate MOUs indicate potential supply of up to 300,000 tonnes annually to Culture H. Dolbec Inc. and up to 200,000 to Gestion D.S. 50 Inc.; the combined maximum is indicative, with no guaranteed deliveries, purchases or minimum commitments, and pricing remains unsettled.[3][4] The November 9 Form 5A additionally describes preliminary evaluation of polymer-bound construction products, including bricks, cinder blocks, paving stones, patio tiles, parking columns and highway Jersey barriers. [5] These are potential applications under review, not additional qualified products or confirmed sales streams.

Sources (5)
How does ESGold intend to use potential production cash flow to support exploration?

The October presentation describes a strategy of establishing tailings-production cash flow to support district-scale exploration and reduce reliance on dilution.[1] This is a company objective. The annual MD&A reports no operating revenue as of June 30, 2026.[2] The November 3 release describes ESGold as pre-production and Montauban as under construction.[4]

Sources (5)
What did the latest company disclosure change, and which pathway did it affect?Updated · Nov 10

The latest tracked disclosure is the Form 5A posted by the CSE on November 10, 2026 and dated November 9. It affects both pathways: ESGold estimates C$2.5 million for remaining mill completion and C$750,000 for historic-tailings processing start-up within the next six months, plus C$3.1 million for continued drilling/evaluation and C$200,000 for preliminary construction-material evaluation within the next twelve months. Processing follows mill completion and commissioning; construction-material work remains exploratory and at the MOU stage. These are targets and estimates, not completed milestones. The November 3 second-MOU release remains a separate historical disclosure, and October 20 remains the latest field-results update tracked here. [4]

Sources (4)
Construction, commissioning and production readinessUpdated · Nov 1011 questions
Is ESGold producing gold and silver, or does it remain in pre-production?Updated · Nov 10

The November 3 release describes ESGold as pre-production and Montauban as under construction.[3] The November 9 Form 5A subsequently presents remaining mill completion and commencement of historic-tailings processing as objectives for the next six months, with processing following completion and commissioning. [4] First processing or an onsite doré pour is not confirmed in the selected disclosures reviewed through November 10, 2026. Equipment arrival, commissioning activity and a target period do not establish achieved production.

Sources (4)
What production timeline has ESGold announced, and has it committed to a specific first-pour date?Updated · Nov 10

Earlier 2026 disclosures and the October presentation described production in 2026 as an objective or expectation.[1][2] The later Form 5A dated November 9 targets mill completion and commencement of historic-tailings processing within the next six months, with processing following mill completion and commissioning. It estimates C$2.5 million for remaining mill work and C$750,000 for processing start-up. [5] This is the latest planning window tracked here; the filing does not set a separate specific first-pour date or confirm an achieved pour. The earlier 2026 target remains historical context; the Form 5A provides the later planning window.

Sources (5)
Which buildings and site infrastructure has ESGold reported as completed?Updated · Nov 10

On November 10, 2025, ESGold reported completion of the mill structure, concrete floor, interior divisions, gold room and onsite laboratory.[1] Its May 2026 presentation identifies a 20,000-square-foot processing facility and laboratory, all-weather road access and a 1.3-kilometre hydro service line.[2] The November 9 Form 5A describes expansion of the steel mill building from 16,000 to 20,000 square feet and reports mill engineering completed by Alphard Engineering in Montréal. [4] Building and engineering completion do not establish that the connected plant is fully operational. The shareholder letter separately describes a modular building under construction for equipment unloading and sheltered winter workspace.[3]

Sources (4)
Which major processing equipment has arrived, and which equipment was still being shipped in the latest update?

ESGold reported the doré furnace onsite in June, mobile water-treatment equipment in July, and the Falcon concentrator and industrial thickeners in September.[1][2][3] The October shareholder letter reports 19 equipment containers onsite, six additional flat-rack containers at sea and three preparing to leave China.[5] Receipt of all remaining equipment, completed plant integration and commissioning, and first production remain unconfirmed in the disclosures reviewed through November 10, 2026.

Sources (5)
Has ESGold confirmed arrival of all remaining equipment?

The October shareholder letter reports 19 equipment containers onsite, six additional flat-rack containers at sea and three preparing to leave China.[2] The two dated container reports are not reconciled in the reviewed disclosures. Do not infer a revised total order or an explanation for the different counts. Receipt of all remaining equipment, completed plant integration and commissioning, and first production remain unconfirmed in the disclosures reviewed through November 10, 2026.

Sources (2)
Has ESGold confirmed completion of equipment installation, electrical connections and plant integration?Updated · Nov 10

Plant-wide completion is not confirmed in the selected disclosures reviewed through November 10, 2026. The September 10 release described mechanical installation, electrical integration and system testing as ongoing, progressive work.[1] The shareholder letter reports advancing installation and commissioning preparations and identifies circuit integration among the next activities.[3] The November 9 Form 5A includes outstanding installation, testing and commissioning in a mill-completion objective for the next six months, with a combined estimate of C$2.5 million. [4] That estimate is not a separate allowance for each activity, nor confirmation of completed installation.

Sources (4)
What does ESGold mean when it says commissioning has begun?Updated · Nov 10

In its September 10 update, ESGold described progressive commissioning while equipment was installed, mechanically and electrically integrated, and tested.[1] The shareholder letter later reported advancing installation and commissioning preparations.[2] The November 9 Form 5A includes remaining testing and commissioning in a mill-completion objective for the next six months, with a C$2.5 million estimate covering the combined remaining mill work. [3] None of these statements establishes completed full-plant commissioning or commercial production.

Sources (3)
What work has ESGold identified as necessary before its first gold and silver pour?Updated · Nov 10

ESGold’s updates identify remaining equipment delivery, installation and integration, system testing and operational preparation.[1][2][4] The furnace is intended for future onsite doré pouring.[3] The November 9 Form 5A expressly places commencement of historic-tailings processing after completion and commissioning of the mill. It targets both mill completion and processing commencement within the next six months, with estimated costs of C$2.5 million and C$750,000 respectively. [5] This sequence is not a final signed-off readiness checklist or evidence of a first pour.

Sources (5)
Has ESGold explained how it will distinguish a first pour from established commercial production?

The reviewed disclosures describe a first-production objective and progressive commissioning, but do not set out a specific commercial-production declaration test, such as a stated throughput maintained for a defined period. No such criterion is assumed here. A first-pour announcement would confirm that event, not automatically a sustained operating level.

Sources (3)
Has ESGold reported actual processing throughput, metal recoveries or operating costs?

Actual Montauban production throughput, recovery performance and operating cost results are not confirmed in the disclosures reviewed through November 10, 2026. The PEA contains modeled assumptions, the plant has a disclosed permitted capacity, and the latest release describes pre-production status.[1][2][4] Those figures should not be presented as measured operating results.

Sources (4)
How has ESGold’s production timetable changed across its disclosures, and what explanations has it provided?Updated · Nov 10

The September 2025 construction update set a building-completion target; completion was reported in November.[1][2] June 2026 updates retained a 2026 production objective, September described progressive commissioning, and October 20 described shipments still in transit.[3][4][5] The later Form 5A dated November 9 targets remaining mill completion and processing commencement within the next six months, with processing following completion and commissioning. [6] These are different milestones and dated planning statements. The filing supplies a newer planning window but does not reconcile every earlier target or explain every timing change; no cause for a delay should be inferred.

Sources (6)
Processing, tailings and mineral resources9 questions
How is the proposed processing circuit intended to recover gold and silver, and why was Merrill–Crowe selected?

ESGold’s October 28, 2025 release selected Merrill–Crowe after testing found that gravity concentrate from railbed material was unsuitable for direct pouring.[1] Its later flowsheet description combines gravity recovery, screening and separation, grinding, cyanide leaching, clarification and deoxygenation, precipitation and doré production.[2] These are the company’s process descriptions, not reported plant recovery results.

Sources (2)
How much tailings material is included in the current resource estimate, and what gold and silver grades are reported?

The 2025 report presents 603,700 tonnes of Indicated tailings at 0.40 g/t gold and 31.45 g/t silver, plus 319,300 tonnes of Inferred tailings at 0.41 g/t gold and 36.93 g/t silver. Together these categories contain 923,000 tonnes, but they retain different confidence classifications and are not mineral reserves.

Source (1)
How much of the tailings resource is classified as Indicated versus Inferred, and what does that distinction mean?

The report classifies 603,700 tonnes as Indicated and 319,300 tonnes as Inferred. It uses closer drill spacing for the Indicated classification. Inferred tonnage and grade carry greater geological uncertainty; the report cautions that there is no certainty they will be upgraded or converted to reserves. The two classifications should remain visible when figures are presented.

Source (1)
What is the difference between contained metal and estimated recoverable metal in ESGold’s figures?

Contained metal is the estimated metal in the resource before processing losses. Table 14-8 reports approximately 7,800 gold ounces and 610,350 silver ounces Indicated, and 4,200 gold ounces and 379,100 silver ounces Inferred. Table 14-7 applies recovery assumptions to report lower recoverable quantities. Neither set represents metal already produced; the source table and basis must accompany the figure.

Source (1)
Which recovery assumptions apply to the different resource and economic figures reported by ESGold?

Table 14-7 applies 89.3% gold recovery and 77% silver recovery to the resource figures.[1] The September 4 PEA release separately cites 92% gold recovery.[2] These should retain their stated source and context rather than being treated as one interchangeable assumption. The report also gives differing Inferred recoverable-silver totals in Tables 14-7 and 25-1; the pathway table explicitly uses Table 14-7.[1]

Sources (2)
What current mineral resources and mineral reserves does ESGold report?

The 2025 technical report presents the tailings resources in the Indicated and Inferred categories and states in Section 15 that there are no current mineral reserves.[1] Historical bedrock estimates are separate and are not treated as current resources. The annual MD&A contains a reference to identified reserves but supplies no new reserve estimate; that wording does not replace the technical report’s classification.[2]

Sources (2)
Which tailings areas are included in the proposed processing schedule?

The PEA schedules Anacon Lead 1 with Notre-Dame-de-Montauban in Year 1, Tétreault 2 in Year 2, Anacon Lead 2 in Year 3 and Tétreault 1 in Year 4. Anacon Lead 1 remains part of the feed in each year. This is a modeled feed sequence, and the report distinguishes existing authorization from approvals needed for other tailings sites.

Source (1)
What does the permitted capacity of 1,000 tonnes per day mean, and how does it relate to planned annual processing?

ESGold describes the plant as permitted for up to 1,000 tonnes per day.[1] The PEA models 270 operating days a year: 270,000 tonnes in each of Years 1–3 and 113,000 tonnes in Year 4.[2] The November 3 release states that Montauban is permitted to process up to 300,000 tonnes of historic tailings annually; an increase requires the requisite permits.[3] The proposed aggregate volume, permitted tailings-processing limits, PEA processing schedule and actual operating throughput describe different things. They are not interchangeable. A permitted daily limit and a modeled annual schedule do not establish the throughput actually achieved by the plant.

Sources (3)
How was the PEA’s four-year processing schedule determined, and has ESGold established a longer operating life?

The PEA distributes its 923,000-tonne tailings inventory over four modeled operating years.[1] That schedule does not include a demonstrated additional bedrock mine life. ESGold is evaluating broader exploration potential and potential crown-pillar material, but further technical work and approvals are required before those possibilities can establish additional feed or operating years.[2][3]

Sources (3)
PEA economics, costs and limitationsUpdated · Nov 1011 questions
Which PEA and economic figures are current, and which earlier figures have been superseded?

ESGold’s September 4, 2025 release says the updated PEA replaces the 2023 assessment.[2] The current report is effective July 21, 2025 and signed August 29. Its Section 22 and the release give the updated economics.[1][2] Section 25.6 repeats lower values also found in the 2023 PEA; the pathways identify that difference rather than presenting the two cases as interchangeable.[1]

Sources (2)
What does a Preliminary Economic Assessment establish, and what remains uncertain?

The PEA evaluates potential project economics using specified technical, cost and price assumptions.[2] ESGold cautions that it is preliminary, includes Inferred resources and does not establish that the modeled results will be achieved.[1][2] Resources that are not reserves do not have demonstrated economic viability. Actual operations, costs and recoveries remain to be reported.

Sources (2)
What pre-tax and after-tax NPV, IRR and payback figures does the current PEA report?

The updated PEA reports approximately C$44.53 million pre-tax NPV at a 5% discount rate and 105.1% pre-tax IRR; after tax, approximately C$24.27 million NPV and 60.3% IRR.[1][2] The September 4 release reports payback of less than two years.[1] These are modeled project results under the study assumptions, not achieved earnings or company market values.

Sources (2)
Does the project’s modeled IRR represent a return that shareholders can expect on their shares?

No. The IRR reported in the PEA relates to the modeled project cash flows.[1] The study does not establish an investor’s share-price return, dividend or investment holding-period return. Its economic results remain subject to the report’s assumptions and preliminary-study qualifications.

Sources (2)
What gold price, silver price and exchange-rate assumptions underpin the PEA?

Section 22 uses gold at US$2,900 per ounce, silver at US$31.72 per ounce and an exchange rate of US$1 to C$1.45. The model also assumes mica at US$300 per tonne. These are the study’s inputs; they are not a live commodity-price update or a forecast that ESGold will receive those prices.

Source (1)
What production, revenue and cash-flow profile does the PEA model?

The PEA models 270,000 tonnes annually in Years 1–3 and 113,000 tonnes in Year 4. Its project summary reports approximately C$103.73 million in revenue, C$32.57 million in operating costs and C$24.27 million in after-tax NPV at 5%. Table 22-3 provides the annual cash-flow schedule. Revenue is not net cash flow, and NPV is a discounted project value rather than cash already earned.

Source (1)
What capital expenditure and working capital does the PEA require, and what is included in those amounts?Updated · Nov 10

The report’s capital summary totals approximately C$18.813 million, with C$2.128 million of working capital shown separately. Section 21 provides the equipment, construction and other cost components. These are PEA study estimates. The November 9 Form 5A separately estimates C$2.5 million for remaining mill completion and C$750,000 for processing start-up, each under its next-six-month objectives. [2] Those milestone estimates do not replace the PEA capital table and are not amounts to add mechanically to it. A reconciliation of project spending, unpaid commitments and the different cost scopes would be needed to compare them directly.

Sources (2)
What operating costs does the PEA assume, and when were those cost estimates prepared?

The PEA reports a modeled operating cost of C$35.29 per tonne, including C$23.64 per tonne for processing. The report states a Q1 2023 constant-dollar cost basis. These are study assumptions, not measured costs from a producing Montauban operation or an inflation-adjusted current cost estimate.

Source (1)
How sensitive are the modeled economics to metal prices, exchange rates, recoveries and costs?

Section 22 presents sensitivity cases around the base assumptions, including changes of up to 30%. Commodity prices and exchange rates materially affect the reported results. Recovery and cost inputs also underpin the model, but a sensitivity case is not an operating forecast. No new spot-price valuation or combined stress scenario is calculated here.

Source (1)
Which potential revenue sources are included in the PEA, and does it include the subsequently announced aggregate opportunity?Updated · Nov 10

The 2025 PEA’s revenue model includes gold, silver and mica.[1] It predates both aggregate MOUs. The proposed aggregate volumes are indicative maximums without guaranteed deliveries, purchases or minimum commitments, and pricing remains unset.[3] The November 9 Form 5A adds a C$200,000 estimate for preliminary construction-material testing/evaluation, not a revenue forecast or an amended PEA. [4] Potential aggregate supply should not be added to PEA revenue as if it were contracted or included in the study.

Sources (4)
What risks has ESGold disclosed about proceeding without a feasibility study demonstrating the economic and technical viability of mineral reserves?

The November 10, 2025 release states that construction and procurement decisions were not based on a feasibility study of mineral reserves demonstrating economic and technical viability.[1] ESGold identifies greater uncertainty and a higher risk of economic or technical failure on that basis. The PEA’s preliminary nature and use of Inferred resources remain relevant qualifications.[2]

Sources (2)
Permits, water treatment and remediation7 questions
Which activities are covered by Montauban’s existing permits, and what does ESGold mean by “fully permitted”?

ESGold describes its tailings-processing operation as permitted for up to 1,000 tonnes per day.[1] The November 3 release states that Montauban is permitted to process up to 300,000 tonnes of historic tailings annually; an increase requires the requisite permits.[5] The PEA identifies authorizations for the tailings-treatment and wastewater plants, with Anacon Lead 1 as the authorized feed site at the study date.[2] The July 2026 drilling authorization is separate. Aggregate reuse and potential crown-pillar extraction retain their own disclosed conditions.

Sources (5)
Do the existing authorizations cover every tailings area included in the proposed processing plan?

At the PEA’s effective date, the report identifies Anacon Lead 1 as authorized and says ministerial authorization is required to reprocess material from other tailings sites.[1] Later descriptions of a permitted plant do not identify a separate authorization for each additional feed site. Completion of all such approvals is not confirmed in the reviewed disclosures.

Sources (2)
Does the exploration authorization permit drilling only, or does it also authorize extraction of crown-pillar material?

The July 28 announcement concerns an Authorization of Impact-Causing Exploration Work for the exploration program.[1] It is not presented as approval to mine the crown pillar. ESGold’s May 26 disclosure says potential crown-pillar extraction remains subject to technical evaluation, permitting, engineering review and, where applicable, further drilling and economic assessment.[2]

Sources (2)
What has ESGold disclosed about water treatment, cyanide management and the handling of processed residue?

The PEA describes the process-water, wastewater and residue-management arrangements, including treatment associated with the proposed cyanide-leach circuit.[1] ESGold reported mobile water-treatment equipment delivered in July and described the thickeners’ intended water-recovery role in September.[2][3] The October 29 release describes planned neutralization and stabilization of residue.[4] These descriptions do not establish measured operating discharge or treatment performance.

Sources (5)
Which environmental improvements are planned, and which treatment or remediation outcomes have been demonstrated?

ESGold plans to recover metals, treat and stabilize the remaining residue, and restore historic tailings areas.[1][3][4] The aggregate MOUs add evaluation of possible beneficial reuse.[1][4] Equipment deliveries and the signing of those MOUs are disclosed events. Completed site restoration, operating treatment results and suitability of the residue for construction are not confirmed in the material reviewed through November 10, 2026.

Sources (4)
What closure, reclamation and financial-security obligations has ESGold disclosed?

The PEA describes closure planning and financial-security requirements and estimates approximately C$1.332 million in closure costs in Table 20-2.[1] The annual financial statements separately record an asset-retirement obligation of C$449,792 at June 30, 2026.[2] The amounts have different stated scopes and measurement bases; neither should be substituted for the other or treated as proof that all security has been posted.

Sources (2)
What has ESGold disclosed about municipal arrangements, community involvement and anticipated local employment?

The PEA describes a municipal land-use agreement, commitments concerning local hiring and purchasing, and a 1% net smelter return royalty to Notre-Dame-de-Montauban.[1] It records a March 2023 municipal resolution supporting the tailings-decontamination plan.[1] The October presentation identifies approximately 30 jobs as part of the project vision; that is not a confirmed current headcount.[2]

Sources (2)
Ocean Partners and future gold and silver sales8 questions
What has ESGold agreed with Ocean Partners, and is the agreement definitive?

On May 26, 2026, ESGold announced a definitive, binding gold and silver doré purchase agreement with Ocean Partners UK Ltd. It covers 100% of doré production from Montauban tailings and potential crown-pillar material. The agreement also provides an optional, conditional working capital facility. Signing secured a purchaser for future output; it did not announce an actual shipment or sale.

Source (1)
Does the agreement cover only tailings production, or also potential crown-pillar production?

The May 26 release expressly includes tailings and potential crown-pillar material. It also states that potential crown-pillar extraction requires technical evaluation, permitting, engineering review and, where applicable, further drilling and economic assessment. Contract coverage does not establish that crown-pillar material is already approved or available as plant feed.

Source (1)
What minimum metal-delivery commitments are disclosed, and how do they relate to the current tailings resource and potential additional feed?

The release states minimum deliveries of 50,000 gold ounces and 1,000,000 silver ounces over the agreement’s term, based on projected production scenarios and development plans.[1] The agreement includes potential crown-pillar material.[1] These contractual quantities are not a new mineral resource estimate, and the release does not reconcile them to a proven feed schedule from the existing tailings inventory alone.

Sources (2)
How will gold and silver prices, payable percentages and refining deductions be determined?

The disclosed terms use prevailing LBMA or COMEX market prices. Ocean Partners pays for 99.8% of contained gold and 99% of contained silver, subject to refining charges of US$0.80 per payable gold ounce and US$0.50 per payable silver ounce. The release describes market-linked pricing rather than announcing a fixed gold or silver sale price.

Source (1)
Who is responsible for collecting and transporting the doré?

ESGold says delivery is EXW at the Montauban mine site, with Ocean Partners responsible for collection and related logistics. This is the disclosed collection arrangement for future shipments. The reviewed release does not report that the first collection has taken place.

Source (1)
When would ESGold receive provisional payment, and how would final settlement be calculated?

The agreement provides provisional payment of up to 90% of a shipment’s estimated value within one business day after the required documents are accepted. Final settlement follows confirmation of final weights and assays. The timing therefore depends on shipment documentation and final measurement; the announcement is not evidence that ESGold has received a production payment.

Source (1)
How does the doré purchase agreement differ from the optional working capital facility?

The purchase agreement sets terms for future doré sales.[1] The facility permits ESGold to elect to borrow up to C$9 million in two conditional tranches, with interest, fees and repayment obligations.[1] Access to a facility is different from cash already drawn. The annual statements report no facility draw at June 30, 2026.[2]

Sources (2)
What has ESGold disclosed about the agreement’s duration and the consequences of delayed or insufficient deliveries?

The May 26 release describes minimum deliveries over the agreement’s term but does not give a calendar expiry date or a complete schedule of remedies for delivery shortfalls. It separately specifies higher interest on overdue facility amounts. Those borrowing terms should not be assumed to describe every consequence of delayed doré delivery. A fuller contract disclosure would be needed for those details.

Source (1)
Cash, financing and financial obligationsUpdated · Nov 1012 questions
How much cash and working capital did ESGold report at its latest financial reporting date?Updated · Nov 10

At June 30, 2026, ESGold reported C$16,212,859 in cash and cash equivalents and C$14,049,753 in working capital.[1][2] The annual statements were authorized October 22.[1] The November 9 Form 5A repeats those June 30 balances in its financial summary; its November 10 publication does not turn them into a November cash position. [3] Subsequent expenditure and transactions can change available funds. Read the new milestone estimates separately from these historical financial balances.

Sources (3)
How much cash has ESGold spent on corporate operations, plant development and exploration?

For the year ended June 30, 2026, ESGold reported C$2,411,230 of cash used in operating activities and C$4,931,400 used in investing activities.[2] The MD&A attributes investing outflows primarily to mill building, equipment and additional Montauban exploration costs.[1] These consolidated cash-flow categories are different from a producing plant’s cost per tonne and from accounting expenses that include non-cash items.

Sources (2)
What debt, accounts payable and other material financial obligations has ESGold disclosed?

The June 30 statements report C$2,870,765 in current liabilities and C$3,320,557 in total liabilities, including accounts payable and accrued liabilities, flow-through-related provisions and an asset-retirement obligation. The optional Ocean Partners facility had no drawn balance at that date. The financial statements’ notes provide the individual balances and commitments; the C$9 million facility limit should not be added as existing debt.

Source (1)
When ESGold says it is “fully funded,” which activities and development stage does that statement cover?Updated · Nov 10

The October presentation describes funding through commissioning and initial gold and silver production.[1] That statement has a dated scope; it is not a quantified guarantee for every future exploration or expansion program. The annual statements separately identify dependence on successful operations or further financing.[2] The November 9 Form 5A estimates C$2.5 million for remaining mill completion, C$750,000 for processing start-up, C$3.1 million for exploration and C$200,000 for construction-material evaluation. Its funding response refers to the attached annual statements and MD&A rather than reconciling those estimates to a new current cash balance. [3] The filing therefore does not prove that all four objectives are fully funded or establish a funding shortfall.

Sources (3)
Has ESGold published an updated estimate of the money still required to complete construction and reach production?Updated · Nov 10

Yes. The Form 5A dated November 9, 2026 estimates C$2.5 million for remaining mill-completion work, including outstanding installation, testing and commissioning, and C$750,000 for historic-tailings processing start-up. Both objectives are stated for the next six months; processing follows mill completion and commissioning. [4] The two estimates add to C$3.25 million (T$R calculation). They provide new milestone estimates, but not a detailed, reconciled all-in cost-to-complete schedule. The filing does not reconcile them to the PEA capital estimate, costs already incurred, unpaid commitments, contingency or current available funds. The separate exploration and construction-material estimates should not be folded into a construction-only total.

Sources (4)
What were the terms and intended uses of the proceeds from ESGold’s recent financings?

The December 2025 financing raised C$4.505 million gross through 5.3 million flow-through shares at C$0.85 for qualifying exploration.[1] The March 10, 2026 LIFE closing raised C$7,264,440 gross through units at C$0.68, each with a share and half a warrant.[2] March proceeds were intended for Montauban and general working capital and corporate purposes.[2] Both announcements disclose fees, so gross proceeds are not net available cash.

Sources (2)
What restrictions and spending deadlines apply to the flow-through financing?

The December financing announcement says its proceeds are to fund qualifying Canadian exploration expenditures at Montauban in Québec, incurred by December 31, 2026 and renounced to purchasers with an effective date no later than December 31, 2025. Those disclosed requirements mean the financing should not be treated as unrestricted money for any corporate or plant expenditure.

Source (1)
What outstanding flow-through spending obligations or related tax liabilities has ESGold reported?

At June 30, 2026, the annual statements report C$4,255,928 still to be spent from the C$4.505 million financing by December 31, 2026, and a related C$54,251 Part XII.6 tax provision. They separately report a C$1.325 million provision associated with an older flow-through obligation. These dated balances should not be merged or treated as an October spending update.

Source (1)
What conditions must be satisfied before ESGold can access each tranche of the Ocean Partners facility?

The facility has C$3 million and C$6 million tranches subject to conditions including due diligence, site visits and production-timing confirmation.[1] The annual MD&A states that the first tranche may be drawn no earlier than three months before anticipated Phase 1 production and the second no earlier than five months before anticipated Phase 2 production, subject to Ocean Partners’ satisfaction.[2]

Sources (2)
Has ESGold disclosed a facility draw after the June 30 financial reporting date?

A later draw is not confirmed in the disclosures reviewed through November 10, 2026. The audited statements report zero drawn at June 30.[1] That dated balance does not establish the facility’s balance on every later day; a subsequent company disclosure identifying a draw and its date would answer the question.

Sources (2)
What interest, fees and repayment obligations apply if the facility is used?

Each drawn tranche carries a 1% arrangement fee and interest at three-month Term SOFR plus 7% a year. The release specifies SOFR plus 11% for overdue amounts. Principal and interest may be repaid through doré deliveries, cash or a combination; early repayment carries a 1% fee. These terms apply to use of the facility, not simply to its availability.

Source (1)
What does the going-concern disclosure say about ESGold’s financing needs and dependence on successful operations?

The annual statements identify a material uncertainty because continuation depends on sufficient profitable operations and/or necessary financing. The auditor draws attention to that uncertainty without modifying the audit opinion. It is a disclosed financing and execution risk, not a statement that the company has ceased operating; the dated cash balances and funding statements should be read alongside it.

Source (1)
Aggregate reuse and micaUpdated · Nov 109 questions
Which aggregate MOUs has ESGold signed, and are they binding?

ESGold announced a second non-binding MOU with Gestion D.S. 50 Inc. for up to 200,000 metric tonnes annually.[2] Together with Culture H. Dolbec Inc.’s October 29 MOU for up to 300,000, the proposed combined supply is up to 500,000 metric tonnes annually.[1][2] These volumes are indicative maximums, not guaranteed deliveries, purchases or minimum commitments.[2] Pricing and other commercial terms remain unset.[2] Completed refers to signing the MOUs, not to definitive purchase contracts or commercial supply.

Sources (2)
Does the combined proposed aggregate volume represent firm orders or permitted processing capacity?

ESGold announced a second non-binding MOU with Gestion D.S. 50 Inc. for up to 200,000 metric tonnes annually.[2] Together with Culture H. Dolbec Inc.’s October 29 MOU for up to 300,000, the proposed combined supply is up to 500,000 metric tonnes annually.[1][2] These volumes are indicative maximums, not guaranteed deliveries, purchases or minimum commitments.[2] Pricing and other commercial terms remain unset.[2] The November 3 release states that Montauban is permitted to process up to 300,000 tonnes of historic tailings annually; an increase requires the requisite permits.[2] The proposed aggregate volume, permitted tailings-processing limits, PEA processing schedule and actual operating throughput describe different things. They are not interchangeable.

Sources (2)
What testing, approvals and contractual conditions must be satisfied before aggregate supply can proceed?Updated · Nov 10

Future supply requires material characterization, environmental testing, applicable regulatory approvals and definitive agreements.[1][2] The November 9 Form 5A targets preliminary testing/evaluation of processed tailings for aggregate use within the next twelve months, at an estimated C$200,000, while describing the initiative as exploratory and at the MOU stage. [3] This is an evaluation target, not a promised date for regulatory approvals, definitive agreements or supply. Existing tailings-processing authorization does not establish that the separate construction-use conditions have been satisfied.

Sources (3)
Has ESGold disclosed test results establishing that the treated residue is suitable for its proposed construction use?Updated · Nov 10

No suitability results are confirmed in the selected disclosures reviewed through November 10, 2026. The November 3 release identifies material characterization and environmental testing as conditions.[2] The November 9 Form 5A describes preliminary evaluation, including possible polymer-bound building products, and targets construction-material testing/evaluation within the next twelve months at an estimated C$200,000. [3] It does not provide test results proving suitability, approved product specifications or confirmed commercial sales.

Sources (3)
Has ESGold disclosed aggregate pricing, minimum purchase quantities or expected margins?

These volumes are indicative maximums, not guaranteed deliveries, purchases or minimum commitments.[2] Pricing and other commercial terms remain unset.[2] The reviewed releases do not provide a quantified aggregate margin. No company revenue or profit estimate can be calculated from these potential volumes alone.

Sources (2)
Has ESGold announced a definitive aggregate agreement, deliveries or sales revenue?

The reviewed updates do not confirm construction suitability, definitive aggregate supply agreements, deliveries or aggregate sales revenue. A definitive agreement, delivery announcement or reported sale would be a separate disclosure event.

Sources (2)
What additional processing, handling or capital costs has ESGold disclosed for producing saleable aggregate?Updated · Nov 10

The November 9 Form 5A estimates C$200,000 for preliminary testing and evaluation of processed tailings for potential aggregate use within the next twelve months. [4] This is an evaluation estimate, not a full production, handling, transport or commercial-scale capital budget. The October 29 and November 3 releases describe treatment and potential reuse but do not provide a complete aggregate cost or margin model.[1][3] The 2025 tailings PEA predates both MOUs.[2] Its processing-cost estimate should not be represented as the fully assessed cost of supplying the proposed construction products.

Sources (4)
What mica resource and product-development work has ESGold disclosed?

The 2025 report estimates 57,200 tonnes of Inferred mica and documents SGS separation testing on eight composites, earlier product qualification and a predecessor’s 2018 catalogue. The economic model uses a mica-price assumption. A resource estimate, test work and product qualification do not establish current production or a sales contract.

Source (1)
Has ESGold confirmed a mica customer, sales agreement or commercial sales?

Not confirmed in the disclosures reviewed through November 10, 2026. The 2025 PEA says ESGold had no mica client at that time and intended to contact prospective buyers. Historical product qualification and a modeled mica price do not identify a current buyer or confirm revenue.

Source (1)
Drilling progress and assay resultsUpdated · Nov 1011 questions
What is the purpose and planned scope of the announced drilling program?

The September 3 announcement describes approximately 5,000 metres of surface diamond drilling across 29 proposed holes, primarily around the historic mine. Objectives include testing known mineralized zones, continuity between historical holes and possible extensions into less-tested areas. New geological and analytical data are intended to help evaluate the historical information and future resource-estimation requirements.

Source (1)
How many metres had ESGold drilled at its latest reported cutoff date?

The October 20 release reports approximately 4,074 metres, more than 80% of the planned 5,000-metre program, subject to database reconciliation.[1] The release separately dates its detailed discussion of hole MM-26-28 to an October 4 cutoff.[1] Release dates and individual measurement cutoffs should therefore remain distinct. The letter repeats the October 20 drilling figures and refers to upcoming assays; it provides no new assay results or final program total.[2]

Sources (2)
Has ESGold confirmed completion of the full program and reconciled the final drilled metres?Updated · Nov 10

Completion of the full planned program and a reconciled final total are not confirmed in the selected disclosures reviewed through November 10, 2026. The October 20 release reports approximately 4,074 metres and says final totals remain subject to database reconciliation.[1] The shareholder letter provides no new final total.[3] The November 9 Form 5A refers to recent drilling and other exploration work and a next-twelve-month continuation/evaluation objective; it gives no reconciled completion statement for the original 5,000-metre / 29-proposed-hole program. [4] The original plan should not be presented as an achieved result.

Sources (4)
Where has drilling extended beyond the historic mine, and what is ESGold testing in those areas?

ESGold reports later holes extending south toward additional targets, including the Marcor sector, and longer holes testing deeper geological features. The October 20 release identifies a 408-metre completed length for MM-26-27 and a planned approximately 600-metre MM-26-28 at the October 4 cutoff. Those hole lengths describe the investigation; they do not establish continuous mineralized widths.

Source (1)
Which assay results have been released, and which remain pending?Updated · Nov 10

The latest exploration field update, dated October 20, states that laboratory assays were pending.[1] The shareholder letter refers to upcoming assays but supplies no new results or final drilling total.[3] The November 9 Form 5A adds a twelve-month drilling/evaluation objective and cost estimate, but publishes no new assay results. [4] Release of those 2026 program assays is not confirmed in the selected disclosures reviewed through November 10, 2026. Historical assays and core photographs are separate evidence.

Sources (4)
Which laboratories are analyzing the samples, and what quality-control procedures has ESGold disclosed?

The September 3 release names SGS and Swastika Laboratories in the intended analytical workflow.[1] September 24 confirms approximately 400 samples submitted to SGS in Val-d’Or.[2] ESGold describes geological logging, photography and sampling under technical supervision, with assay review and validation through its QA/QC procedures.[1][2] The annual MD&A also describes standards, blanks, duplicates and chain-of-custody controls.[3]

Sources (3)
Has ESGold provided a timetable for publishing assays, and what must happen before results can be released?Updated · Nov 10

ESGold says results will be reported after receipt, review and validation under its QA/QC procedures.[2] Its use of two laboratories was described as providing flexibility and potentially reducing turnaround, not guaranteeing publication by a particular day.[1] The November 9 Form 5A’s next-twelve-month exploration objective is a broader drilling/evaluation plan; it does not set a firm assay-publication deadline. [4] A specific release date remains unconfirmed.

Sources (4)
What can visible sulphides and drill-core photographs establish before laboratory assays are available?

They document geological observations such as rock types, alteration, veins and visible sulphide minerals. ESGold explicitly says those observations and photographs do not establish metal grades, continuity or economic viability. Laboratory assays are required to determine grades and help assess the significance of the intervals.

Source (1)
Are reported drill intervals downhole lengths or estimated true widths?

The October 20 release identifies the reported depths and intervals as measurements along the drill core. True widths have not been established. It also distinguishes narrow sulphide-bearing bands from broader host-rock intervals; a photographed or logged host interval should not be described as continuously mineralized across its full length.

Source (1)
How can geological observations be incorporated into the model while assays remain pending?

ESGold says new holes provide direct information on rock units, structures, alteration and the location of former underground workings.[1] These observations can be compared with historical records and geophysical interpretations to refine the geological model.[1][2] Assays add measured metal concentrations later; incorporating core observations does not itself establish grades or a resource.

Sources (2)
Who is conducting and supervising the drilling, sampling and technical review?

The September 3 release names Forage Lamontagne as drilling contractor and Merouane Rachidi, P.Geo., Ph.D., of GoldMinds Geoservices as supervisor of logging, photography and sampling. It identifies him as the independent Qualified Person reviewing that technical disclosure. Other company documents name their own reviewing Qualified Person, so the relevant disclosure should be checked rather than assuming one reviewer for every document.

Source (1)
Geological modeling and future explorationUpdated · Nov 108 questions
What is Ambient Noise Tomography, and what can it reveal about Montauban’s geology?

ESGold describes ANT as a geophysical method using ambient seismic noise to help image subsurface features.[1] CAUR Technologies’ survey data are integrated with geology, drilling and geochemistry in the 3D model.[1][2] The interpretation assists exploration targeting; ESGold cautions that it does not establish a bedrock mineral resource or reserve and requires confirmation through further work.[1]

Sources (2)
What do the reported survey area, interpreted depth and strike length actually describe?

The initial model described a corridor extending roughly 900 metres vertically and more than two kilometres along strike.[1] The September update integrates an approximately 70-square-kilometre survey, with deeper geological interpretation in parts of the model.[2] These describe survey coverage and interpreted geology, not a measured volume of economic ore or proven mineralization throughout that area.

Sources (2)
How much historical drilling and geochemical information has been incorporated into the model?

The September 15 release describes a compilation of 1,637 historical drill holes, including 90 additional historical holes integrated in the update, and 1,707 multi-element geochemical samples. These are compiled datasets used for interpretation. They are not 1,637 holes newly drilled by ESGold in the 2026 program.

Source (1)
What does ESGold’s geological interpretation suggest, and which parts remain hypotheses requiring testing?

ESGold interprets a structurally complex, gold- and silver-bearing volcanogenic massive sulphide environment, with folding and displacement potentially explaining stacked or repeated geological units.[1] Its annual MD&A also discusses comparisons with Broken Hill-style systems as an exploration concept.[2] Those geological interpretations require validation; neither comparison establishes a deposit of a particular size, grade or value.

Sources (2)
Which exploration areas has ESGold identified as priorities, and what evidence supports that selection?

The September model update identifies southern and eastern areas as priorities where geological structures, geophysical interpretations and geochemical indications overlap. It also describes less-tested northern ground. These are company-described exploration priorities, not confirmed new deposits or a final selection of every future drill location.

Source (1)
What work is included in ESGold’s disclosed exploration framework for 2027?Updated · Nov 10

The September 15 disclosure sets out database validation and model refinement, target ranking, and targeted drilling or follow-up exploration. It uses multiple datasets to prioritize work and does not report those future phases as completed. The November 9 Form 5A adds a broad next-twelve-month objective for continued drilling and evaluation of recent work at an estimated C$3.1 million. [2] The filing does not allocate that estimate among the three planning phases or provide a final hole-by-hole program.

Sources (2)
Has ESGold confirmed the final targets, budget and schedule for the next drilling phase?Updated · Nov 10

ESGold has now disclosed a broad exploration estimate and period, but not a finalized next-phase drilling plan. The November 9 Form 5A estimates C$3.1 million for continued drilling and evaluation of recent drilling and other exploration work within the next twelve months. [3] The earlier 2027 framework and priority areas remain relevant.[1][2] The filing does not specify a final target list, new metreage or hole count, detailed start/completion dates, or a budget allocation for each phase. It should not be described as a fully costed final drilling program.

Sources (3)
Has ESGold committed to preparing a current bedrock mineral resource estimate, and announced a timetable?

Not confirmed in the disclosures reviewed through November 10, 2026. ESGold says new drilling, analytical data and other technical work will help evaluate historical estimates and determine whether a current resource estimate may be warranted.[1][2] That evaluation objective should not be presented as a commissioned estimate, a promised publication date or an announced new PEA.

Sources (2)
Land position, acquisitions and crown-pillar potentialUpdated · Nov 106 questions
What land position does ESGold report, and how should readers understand the different claim and hectare totals in dated disclosures?Updated · Nov 10

The annual MD&A reports 265 claims covering approximately 13,116 hectares as of June 30, 2026.[1] The October presentation reports 485 claims and approximately 24,414 hectares; a similar total also appeared in May.[2][3] Section 5(a) of the November 9 Form 5A repeats 485 claims and 24,414 hectares. [4] The newer filing provides another company source for that reported position, but does not reconcile the differing June 30 count or establish a simple addition of 220 claims. Retain each figure with its own source and reporting basis.

Sources (4)
What did ESGold agree to acquire through the 44-claim transactions, and what consideration and royalty terms were disclosed?

The July 14 agreements cover 44 claims around Lac Viking, Lac Lanctôt and Lac Charlie, approximately 2,448 hectares.[1] ESGold described a 100% interest without a retained royalty, for C$70,000 cash and 600,000 shares, subject to closing conditions.[1] The annual filings subsequently record delivery of that consideration.[2]

Sources (2)
Has ESGold confirmed completion of the claim transfers and required approvals, beyond payment of the consideration?

Final transfers and approvals are not expressly confirmed in the disclosures reviewed through November 10, 2026. The July agreements specify claim transfers and CSE approval as conditions; the annual filings confirm delivery of C$70,000 and 600,000 shares.[1][2] Payment is a disclosed event, but it should not be substituted for an explicit confirmation of every closing condition.

Sources (2)
Which results from the acquired claims are historical, and have they been verified by ESGold?

The July acquisition disclosure refers to historical polymetallic exploration results and their geological relevance. Those historical results have not been established as a current mineral resource through the disclosed acquisition. The release’s historical-data qualifications should accompany the results; ownership of a claim does not itself validate historical grades, continuity or economic potential.

Source (1)
What is the crown pillar, and how do its historical estimates differ from the current tailings resource?

The crown or surface pillar is bedrock associated with the area above historic underground workings, rather than previously processed tailings. ESGold’s presentation reproduces historical north- and south-zone estimates, while its drilling releases say sufficient work has not been completed to classify those estimates as current resources or reserves.[1][2] They are separate from the current tailings resource and PEA feed schedule.[3]

Sources (3)
What further technical work and authorizations would be required before potential crown-pillar material could become plant feed?

ESGold’s May 26 release identifies technical evaluation, permitting, engineering review and, where applicable, additional drilling and economic assessment.[1] The current drilling program is intended to help evaluate historical information. Inclusion of potential crown-pillar doré in the Ocean Partners agreement does not establish that these prerequisites have been met.[1]

Sources (2)
Share structure, management and other corporate disclosuresUpdated · Nov 1010 questions
Where are ESGold’s shares listed, and what are its trading symbols?

The company’s November 3 release lists CSE: ESAU, OTCQB: ESAUF and Frankfurt: Z7D.[2] These are the listings and symbols stated in that disclosure, not a live quotation or a statement about current trading prices.

Sources (2)
Who is responsible for company leadership, plant development, operations and exploration?

The October presentation identifies Gordon Robb as CEO and director, Paul Mastantuono as COO and director, Jason Tong as CFO, and Pierre-Marc Gagnon as Operations Director.[1] Gagnon’s appointment describes site execution, readiness and contractor coordination.[2] The drilling disclosure identifies Merouane Rachidi of GoldMinds Geoservices for program technical supervision; CAUR Technologies and Geomatic World contribute survey and modeling work.[3][4]

Sources (4)
What is the latest disclosed share structure, including shares, warrants, options and restricted share units?Updated · Nov 10

The October 22 annual MD&A reports 111,774,201 common shares, 37,840,917 warrants and 5,294,000 options outstanding at its date.[1] The Form 5A filed in November expressly presents its securities table as a summary at the end of the reporting period, June 30, 2026. That table lists 110,942,201 common shares and 1,025,000 RSUs outstanding; its warrant series sum to 38,072,917 and its option series to 5,294,000 (T$R calculations from the table). [4] These June 30 figures should not replace October 22 measurement-date balances. Annual RSU grants are also different from RSUs remaining outstanding.[2] No reconciled current fully diluted total covering all instruments is supplied; do not combine different dates to manufacture one.

Sources (4)
What exercise prices and expiry dates apply to outstanding warrants and options, and what potential dilution do they represent?

The June 30 schedules in Note 10 list warrants at C$0.30–C$1.10, expiring from December 2026 to March 2029, and options at C$0.47–C$1.36, expiring from May 2027 to May 2031.[1] The March financing release separately specifies its broker warrants at C$0.68.[2] See the dated schedules for each series; subsequent exercises change balances. Exercise can issue additional shares and provide cash, but potential proceeds are not cash already received.

Sources (3)
What management, insider and major-shareholder ownership has ESGold disclosed, and as of what date?

The October presentation’s September 2026 capital-structure slide allocates 8% to management, 7% to institutions, 30% to friends and affiliates, 25% to family offices and 30% to public float. These are company-presented categories, not a named, independently reconciled register of beneficial owners. They should retain their stated date and should not all be described as insider ownership.

Source (1)
What management compensation, share-based compensation and related-party transactions has ESGold reported?

For the year ended June 30, 2026, the statements report C$749,504 earned by key management, including C$50,000 severance, and C$1,953,790 of related share-based payment expense. Total company share-based payment expense was C$4,701,046. Note 11 also records C$8,000 of consulting services from an officer’s brother. These categories should not be combined as if every amount were cash salary paid during the year.

Source (1)
What paid investor-awareness, marketing and market-making arrangements has ESGold disclosed?

The September 1 i2i agreement disclosed an initial US$300,000 media budget, with no securities issued as compensation.[1] The May 25 ICP announcement disclosed C$7,500 a month plus taxes, an initial four-month term followed by monthly renewals unless terminated on notice, and no options or other compensation.[2] These are corporate-service arrangements; neither establishes production progress or independent validation of project economics.

Sources (2)
What is the disclosed status of ESGold’s other projects and initiatives, including Eagle River and the proposed Colombia venture?

The annual MD&A says Eagle River’s carrying value was written down to nil at June 30, 2025.[1] It also reports that, after further assessment following June 30, 2026, ESGold decided not to fund the proposed Planta entity in Colombia and did not proceed with that MOU.[1][2] Those later statements should accompany earlier Colombia testing announcements. Montauban remains the principal project described in the MD&A.[1]

Sources (2)
How should readers distinguish insurance proceeds, financing receipts and other income from revenue generated by production?

The annual statements record a C$2 million gross property-insurance settlement and C$462,512 of related legal fees.[1] The MD&A separately reports financing cash inflows and states that no operating revenue had been generated as of June 30, 2026.[2] Insurance proceeds, equity raised and other accounting income should not be labeled gold or silver production sales.

Sources (2)
Where can shareholders find ESGold’s original disclosures and contact the company about unanswered questions?Updated · Nov 10

Use the dated company-source links beneath each answer and the page’s source register. ESGold’s website provides its news archive and investor materials; filings are also available under the issuer’s SEDAR+ profile. The CSE issuer page has a separate CSE Filings list: select the November 10, 2026 Form 5A Annual Listing Summary for the new objectives and estimates, and use the PDF page/section locator attached to each claim. The document is dated November 9 and includes June 30 financial information; these dates serve different purposes. The November 3 release lists ir@esgold.com and 1-888-370-1059 for company enquiries.[3] Unconfirmed outcomes require further public company disclosure to update the record. [4]

Sources (4)
Back to FAQ search ↑

03 / MONTAUBAN PATHWAY

Production Development

Company disclosures on Montauban tailings development, commissioning and planned doré production. Labelled Likely entries explain customary operating practices.

Full pathway view includes company-disclosed and Likely sub-steps. ESGold disclosures only shows entries supported by a company source.

Select a stage to see its sub-steps. Each visible pill has an explanation directly below it. Sub-step details are shown in full.

Jump to stage
Stage01

Disclosed by ESGoldWhat ESGold disclosed

ESGold selected Merrill–Crowe recovery in October 2025.[1] In September 2026 it described a plant designed around permitted capacity of up to 1,000 tonnes per day.[2] The November 3 release states that Montauban is permitted to process up to 300,000 tonnes of historic tailings annually; an increase requires the requisite permits.[3]

Sources (3)
1 sub-step · 1 disclosed · 0 Likely · 1 completed
View sub-steps and references
Sub-step01

Processing methodology selected

Completed
Disclosed by ESGoldWhat ESGold disclosed

On October 28, 2025, ESGold announced its selection of Merrill–Crowe recovery after gravity tests on railbed material showed that the concentrate was unsuitable for direct pouring.[1]

Source (1)

Additional company-reported detail

The tests used railbed material and included work at Montauban and ALS Global in Val-d’Or under Edmond St-Jean’s supervision. The September 2026 flowsheet includes gravity separation as well as Merrill–Crowe recovery.

Sources (2)

Terms: Merrill-Crowe processGravity separation

Project authorizations and environmental requirements
SubjectCompany disclosure
Tailings plantESGold reported a permitted plant capacity of up to 1,000 tonnes per day. In the 2025 PEA, the authorization covered Anacon Lead 1 tailings. The report said material from other tailings sites required ministerial authorization.

The November 3 release states that Montauban is permitted to process up to 300,000 tonnes of historic tailings annually; an increase requires the requisite permits.[5]

ExplorationESGold reported receiving Québec’s authorization for the planned exploration drilling on July 28.[2]
Crown pillarESGold said future extraction would depend on further drilling, technical evaluation, engineering, economics and any additional approvals required.
Water and residueESGold described intended water reuse and residue treatment. Future supply requires material characterization, environmental testing, applicable regulatory approvals and definitive agreements.[4][5]
Sources (5)
Processing flowsheet described by ESGold

In September, ESGold described screening and separation, grinding, cyanide leaching, clarification and deoxygenation, Merrill–Crowe precipitation and doré production as parts of its designed flowsheet.[1] It identified the Falcon concentrator as gravity-recovery equipment and the thickeners as solid–liquid separation equipment.[1] In October 2025, ESGold had selected Merrill–Crowe following metallurgical tests.[2]

Sources (2)
Company-reported project economics
MeasureBefore taxAfter tax
NPV at 5% discount rateC$44.53MC$24.27M
Internal rate of return (IRR)105.1%60.3%
ItemDisclosed basis
Effective / signedJuly 21 / August 29, 2025
Capital summary · Table 1-3C$18.813M; working capital C$2.128M additional
Operating cost · Table 1-4C$35.29/t; Q1 2023 constant dollars
Metal prices · Table 22-1Gold US$2,900/oz; silver US$31.72/oz
Mica / exchange rateUS$300/t; US$1 = C$1.45
Modeled schedule270,000 t in each of Years 1–3; 113,000 t in Year 4

The 2025 PEA is preliminary and includes inferred resources. The financial results and four-year feed schedule are study projections.

The September 4, 2025 release and Section 22 give the updated case.[3] Section 25.6 prints pre-/after-tax NPV₅ of C$14.08M/C$6.99M and IRRs of 42.6%/23.4%. Those are also the values in the 2023 PEA. ESGold’s September 4 release says the updated assessment replaces the 2023 PEA.[3]

Sources (4)
Tailings mineral resource estimate
CategoryTonnesGold gradeSilver gradeRecoverable AuRecoverable Ag
Indicated603,7000.40 g/t31.45 g/t6,950 oz470,050 oz
Inferred319,3000.41 g/t36.93 g/t3,800 oz291,200 oz

Table 14-7 presents the March 2, 2023 estimate reproduced in the 2025 report.[1] The gold and silver ounce columns apply recoveries of 89.3% and 77.0%. For inferred recoverable silver, Table 14-7 gives 291,200 oz and Table 25-1 gives 291,900 oz.[1][3] The table above uses Table 14-7.

Section 15 reports no current mineral reserves.[2] The tailings estimate and the historical bedrock estimates concern different material.

Sources (4)

Study and disclosure references

2025 technical studyReference
  • The PEA is effective July 21, 2025; signed August 29, 2025.
  • It models 923,000 tonnes of tailings over four years, rather than reporting processed tonnage.

Effective July 21, 2025; signed August 29, 2025.

The PEA includes inferred resources and is preliminary; there is no certainty its results will be realized.

Source (1)

Terms: PEA — preliminary economic assessmentInferred mineral resourceTailingsNPV — net present valueIRR — internal rate of returnIndicated mineral resource

Permitted plant capacity Reference

ESGold described its tailings plant as permitted for up to 1,000 tonnes per day on September 10, 2026.[1] The 2025 PEA identifies authorization for Anacon Lead 1 tailings and describes ministerial authorization as necessary for other feed sites.[2]

Sources (2)

Terms: Throughput

Company’s production-decision qualificationReference
  • ESGold states that construction and procurement were not based on a feasibility study of mineral reserves demonstrating economic and technical viability.
  • The company identifies greater uncertainty and a higher risk of economic or technical failure on that basis.

Qualification in the November 10, 2025 release.

Source (1)

Terms: Mineral reserve

Stage02

4 sub-steps · 2 disclosed · 2 likely

Company-disclosed activity in this stage

Disclosed by ESGoldWhat ESGold disclosed

ESGold reported completion of the mill building in November 2025.[1] Its May 2026 presentation identifies the site’s road access and hydro service.[2] The letter’s photograph caption describes a modular building under construction for equipment unloading and sheltered winter workspace.[3] The existing main mill’s reported completion and this separate building’s construction are different events.

Updated · Nov 10The November 9 Form 5A describes expansion of the steel mill building from 16,000 to 20,000 sq. ft. and reports mill engineering completed by Alphard Engineering in Montréal. These are infrastructure statements; remaining installation, testing and commissioning still appear in the filing’s forward mill-completion objective. [4]

Sources (4)
1 completed · 1 reported
View sub-steps and references
Sub-step02

Site access, hydro service and processing facilityUpdated · Nov 10

Infrastructure reported
Disclosed by ESGoldWhat ESGold disclosed

ESGold’s May presentation identifies all-weather access, a 1.3 km hydro service line and a 20,000 sq ft processing facility and laboratory.[1] The letter’s photograph caption describes a modular building under construction for equipment unloading and sheltered winter workspace.[2] The existing main mill’s reported completion and this separate building’s construction are different events.

Updated · Nov 10The November 9 Form 5A describes expansion of the steel mill building from 16,000 to 20,000 sq. ft. and reports mill engineering completed by Alphard Engineering in Montréal. These are infrastructure statements; remaining installation, testing and commissioning still appear in the filing’s forward mill-completion objective. [3]

Sources (3)
Sub-step03

Tailings feed-area and material-handling preparation

Likely stepUnconfirmed by ESGoldWhy this is a likely step

An operator preparing to process stored tailings would ordinarily identify where it can collect the feed and how to move it to the plant. This connects the feed sources in the study to the equipment that would receive the material. The PEA describes feed sources and handling methods. ESGold has not reported completion of site preparation for the first feed.

Source (1)
Related company disclosure · context only

Terms: Tailings

Sub-step04

Process-water, water-treatment and residue-handling readiness

Likely stepUnconfirmed by ESGoldWhy this is a likely step

An operator bringing a tailings plant into service would ordinarily check how process water and residue move through the connected systems before running them with feed. ESGold has reported equipment deliveries. Its updates do not specify a completed readiness check of the connected water and residue systems.

Sources (2)
Related company disclosures · context only
Study feed sources and processing sequence
YearTailings sources
1Anacon Lead 1 + Notre-Dame-de-Montauban[2]
2Anacon Lead 1 + Tétreault 2
3Anacon Lead 1 + Anacon Lead 2
4Anacon Lead 1 + Tétreault 1

The table shows the PEA’s modeled feed by operating year. At the study date, the report identified Anacon Lead 1 as authorized and stated that reprocessing material from other tailings sites required ministerial authorization.[2] ESGold separately identifies potential crown-pillar material as conditional.[3]

Sources (3)
Water treatment, site remediation and community context

ESGold’s PEA describes a closure plan for the Anacon Lead 1 site and the associated processing and wastewater infrastructure. Table 20-2 estimates closure costs of approximately C$1.332 million. The study also reports a 1% net smelter return royalty to the municipality.

ESGold reported delivery of mobile water-treatment equipment in July and described the thickeners’ intended water-recovery function in September.[4][5]

SubjectCompany disclosure
Planned residue treatment and possible reuseESGold intends to recover gold and silver from historic tailings. It plans to treat, neutralize and stabilize the remaining material.[6][7] ESGold announced a second non-binding MOU with Gestion D.S. 50 Inc. for up to 200,000 metric tonnes annually.[7] Together with Culture H. Dolbec Inc.’s October 29 MOU for up to 300,000, the proposed combined supply is up to 500,000 metric tonnes annually.[6][7] Future supply requires material characterization, environmental testing, applicable regulatory approvals and definitive agreements.[6][7] The reviewed updates do not confirm construction suitability, definitive aggregate supply agreements, deliveries or aggregate sales revenue.
Sources (7)
Stage03

Disclosed by ESGoldWhat ESGold disclosed

ESGold reported the furnace onsite in June and the Falcon concentrator and thickeners onsite in September.[1][2] The October shareholder letter reports 19 equipment containers onsite, six additional flat-rack containers at sea and three preparing to leave China.[4]

Sources (4)
6 sub-steps · 6 disclosed · 0 Likely · 4 completed · 2 underway
View sub-steps and references
Sub-step01

Doré melting furnace and gravity-recovery equipment on site

Completed
Disclosed by ESGoldWhat ESGold disclosed

On June 11, 2026, ESGold reported that the doré furnace had arrived at Montauban and that Humphrey spirals and shaker tables were already on site.[1]

Source (1)

Additional company-reported detail

ESGold specified a propane-fired, hydraulic tilting furnace rated for a 150 kg metal charge and a maximum operating temperature of 1,300°C.

Source (1)

Terms: Doré

Sub-step03

Inspection and shipment approval for remaining manufactured equipment

Completed
Disclosed by ESGoldWhat ESGold disclosed

On July 21, 2026, ESGold reported that its technical team had inspected the equipment in China and its engineers had approved it for shipment.[1]

Source (1)

Additional company-reported detail

ESGold’s July photographs identify flotation, Merrill–Crowe, cyclone and ball-mill equipment.

Source (1)
Sub-step04

Dispatch of remaining manufactured equipment

Further shipments underway
Disclosed by ESGoldWhat ESGold disclosed

The October shareholder letter reports 19 equipment containers onsite, six additional flat-rack containers at sea and three preparing to leave China.[2]

Sources (2)
Sub-step05

Arrival of remaining equipment from China

19 containers onsite; further deliveries pending
Disclosed by ESGoldWhat ESGold disclosed

The October shareholder letter reports 19 equipment containers onsite, six additional flat-rack containers at sea and three preparing to leave China.[2] The two dated container reports are not reconciled in the reviewed disclosures. Do not infer a revised total order or an explanation for the different counts.

Sources (2)
Sub-step06

Arrival of the Falcon Gravity Concentrator and industrial thickeners

Completed
Disclosed by ESGoldWhat ESGold disclosed

On September 10, ESGold reported that the Sepro Falcon concentrator and AM King industrial thickeners had arrived at Montauban.[1]

Source (1)

Additional company-reported detail

The concentrator is intended to recover liberated precious metals. The thickeners concentrate slurry and recover water for reuse.[1]

Source (1)

Terms: Falcon Gravity ConcentratorThickener

Equipment progress by component
ComponentReported event
Doré furnaceArrived at Montauban, June 11.
Mobile water-treatment equipmentDelivered to site, July 21.
China-manufactured equipmentInspections and shipment approval announced July 21.[2] The October shareholder letter reports 19 equipment containers onsite, six additional flat-rack containers at sea and three preparing to leave China.[5]
Falcon concentrator and industrial thickenersArrived at Montauban, September 10.[3]
Sources (5)
Stage04

3 sub-steps · 2 disclosed · 1 likely

Company-disclosed activity in this stage

Disclosed by ESGoldWhat ESGold disclosed

ESGold’s September 10 update describes mechanical installation and electrical integration as components were connected at Montauban.[1] The letter reports advancing installation and commissioning preparations, and identifies circuit integration among the next activities.[2]

Updated · Nov 10The Form 5A dated November 9, 2026 targets remaining mill completion within the next six months, including outstanding equipment installation, testing and commissioning, at an estimated C$2.5 million. The estimate covers the combined milestone; it is not an additional allowance for each stage or sub-step. It does not confirm completed installation or commissioning. [3]

Sources (3)
2 underway
View sub-steps and references
Sub-step01

Equipment installation and mechanical integrationUpdated · Nov 10

Installation advancing
Disclosed by ESGoldWhat ESGold disclosed

ESGold’s September 10 update described equipment installation and mechanical integration underway at the processing facility.[1] The letter reports advancing installation and commissioning preparations, and identifies circuit integration among the next activities.[2]

Updated · Nov 10The Form 5A dated November 9, 2026 targets remaining mill completion within the next six months, including outstanding equipment installation, testing and commissioning, at an estimated C$2.5 million. The estimate covers the combined milestone; it is not an additional allowance for each stage or sub-step. It does not confirm completed installation or commissioning. [3]

Sources (3)
Sub-step03

Detailed process-interface and controls checks

Likely stepUnconfirmed by ESGoldWhy this is a likely step

When separate pieces of processing equipment are connected, an operator would ordinarily check that material, signals and controls pass correctly between them. ESGold reports system testing in general. Its update does not identify these particular interface checks.

Source (1)
Related company disclosure · context only
Stage05

6 sub-steps · 2 disclosed · 4 likely

Company-disclosed activity in this stage

Disclosed by ESGoldWhat ESGold disclosed

ESGold described commissioning as progressive on September 10 and reported equipment installation, integration, system testing and operational preparation underway.[1] The letter reports advancing installation and commissioning preparations, and identifies circuit integration among the next activities.[2]

Updated · Nov 10The Form 5A dated November 9, 2026 targets remaining mill completion within the next six months, including outstanding equipment installation, testing and commissioning, at an estimated C$2.5 million. The estimate covers the combined milestone; it is not an additional allowance for each stage or sub-step. It does not confirm completed installation or commissioning. [3]

Sources (3)
1 completed · 1 underway
View sub-steps and references
Sub-step01

Commissioning and operational readinessUpdated · Nov 10

Underway on September 10
Disclosed by ESGoldWhat ESGold disclosed

On September 10, ESGold described progressive commissioning, including system testing as components were installed and connected.[1] The letter reports advancing installation and commissioning preparations, and identifies circuit integration among the next activities.[2]

Updated · Nov 10The Form 5A dated November 9, 2026 targets remaining mill completion within the next six months, including outstanding equipment installation, testing and commissioning, at an estimated C$2.5 million. The estimate covers the combined milestone; it is not an additional allowance for each stage or sub-step. It does not confirm completed installation or commissioning. [3]

Sources (3)
Sub-step02

Dry and no-load equipment checks

Likely stepUnconfirmed by ESGoldWhy this is a likely step

An operator preparing newly installed equipment for use would ordinarily check rotation, controls and interlocks without feed so the individual components can be tested before running them together. ESGold reports system testing. Its update does not identify a separate dry or no-load test.

Source (1)
Related company disclosure · context only
Sub-step03

Wet and integrated system checks

Likely stepUnconfirmed by ESGoldWhy this is a likely step

After checking individual components, an operator would ordinarily circulate water through connected systems to check flow and identify leaks before introducing tailings. ESGold’s commissioning update does not identify a separate wet test.

Source (1)
Related company disclosure · context only
Sub-step05

Operations-team and supporting-system preparation

Likely stepUnconfirmed by ESGoldWhy this is a likely step

An operator moving from plant construction to operation would ordinarily prepare shift coverage, train operators and agree on handover procedures so people know how to run the equipment. ESGold disclosed the Operations Director’s appointment. It has not specified this training or handover process.

Source (1)
Related company disclosure · context only
Sub-step06

Processing-facility operational readiness

Likely stepUnconfirmed by ESGoldWhy this is a likely step

Before introducing feed, an operator would ordinarily review equipment checks and staffing together to decide whether the plant is ready for that first run. ESGold has described operational preparation. It has not specified a separate review or sign-off of this kind.

Source (1)
Related company disclosure · context only
Company-reported commissioning activities

On September 10, ESGold reported installation, mechanical and electrical integration, system testing and operational-readiness work underway.[1] It described commissioning as progressive as additional components are installed, connected and tested. The letter reports advancing installation and commissioning preparations, and identifies circuit integration among the next activities.[2] Receipt of all remaining equipment, completed plant integration and commissioning, and first production remain unconfirmed in the disclosures reviewed through November 10, 2026.

Sources (2)
Stage06

4 sub-steps · 1 disclosed · 3 likely

Company-disclosed activity in this stage

Disclosed by ESGoldWhat ESGold disclosed

In June, ESGold anticipated production in 2026 and described onsite doré pouring as the intended use of its furnace after commissioning.[1][2]

Updated · Nov 10Later planning disclosure: the Form 5A dated November 9, 2026 targets commencement of historic-tailings processing within the next six months, following mill completion and commissioning, with estimated start-up costs of C$750,000. This later processing window should be read alongside the earlier 2026 objective above. It is not a specific first-doré date or evidence of an achieved first pour. [3]

Sources (3)
1 planned
View sub-steps and references
Sub-step01

First production and planned onsite doré pouringUpdated · Nov 10

Company objective
Disclosed by ESGoldWhat ESGold disclosed

ESGold anticipated production in 2026 and described the delivered furnace as equipment for onsite doré pouring once the facility is commissioned and operating.[1][2]

Updated · Nov 10Later planning disclosure: the Form 5A dated November 9, 2026 targets commencement of historic-tailings processing within the next six months, following mill completion and commissioning, with estimated start-up costs of C$750,000. This later processing window should be read alongside the earlier 2026 objective above. It is not a specific first-doré date or evidence of an achieved first pour. [3]

Sources (3)
Sub-step02

First feed through the processing facility

Likely stepUnconfirmed by ESGoldWhy this is a likely step

An operator moving from commissioning to processing would ordinarily introduce an initial quantity of feed to see how the connected circuit handles the material. ESGold described its designed flowsheet. The reviewed disclosures do not identify a first-feed run.

Source (1)
Related company disclosure · context only
Sub-step03

Initial precious-metal recovery measurements

Likely stepUnconfirmed by ESGoldWhy this is a likely step

During initial processing, an operator would ordinarily compare the metal entering the plant with the metal recovered to see how the circuit performs on actual feed. The PEA models recovery. The reviewed disclosures do not identify measurements from an initial operating run.

Source (1)
Related company disclosure · context only

Terms: Recovery

Sub-step04

Weighing and assaying the first doré batch

Likely stepUnconfirmed by ESGoldWhy this is a likely step

An operator preparing an initial doré batch for sale would ordinarily measure its weight and metal content to characterize that batch. ESGold’s purchase agreement specifies final weights and assays for settlement. The reviewed disclosures do not identify a first batch or specify how that initial batch would be measured.

Sources (2)
Related company disclosures · context only

Terms: DoréAssay

Stage07

5 sub-steps · 4 disclosed · 1 likely

Company-disclosed activity in this stage

Disclosed by ESGoldWhat ESGold disclosed

ESGold’s May 26 agreement assigns collection to Ocean Partners and specifies when provisional payment and final settlement become due.

Source (1)
1 completed · 3 conditions apply
View sub-steps and references
Sub-step01

Definitive gold and silver doré purchase agreement

Agreement signed
Disclosed by ESGoldWhat ESGold disclosed

On May 26, ESGold announced a definitive agreement with Ocean Partners covering future gold and silver doré from Montauban tailings and potential crown-pillar material.[1]

Source (1)

Additional company-reported detail

The agreement covers 100% of doré from the specified material and provides for minimum deliveries totaling 50,000 oz of gold and 1,000,000 oz of silver over its term, based on projected production scenarios.

Source (1)

Terms: Gold and silver doré purchase agreementCrown pillar

Sub-step05

Tracking doré sales and receipts

Likely stepUnconfirmed by ESGoldWhy this is a likely step

An operator beginning deliveries under a doré agreement would ordinarily track the metal shipped, the amounts invoiced and the payments received so each sale can be reconciled. ESGold has disclosed the purchase terms. It has not specified this internal sales-tracking procedure.

Source (1)
Related company disclosure · context only

Terms: Revenue

Ocean Partners doré purchase agreement
Signed Ocean Partners agreement · reported terms
TermCompany disclosure
Product100% of gold and silver doré from tailings and potential crown-pillar feed.
Minimum deliveries50,000 oz Au and 1,000,000 oz Ag over the agreement term, based on projected production scenarios and development plans.
Collection / paymentEXW collection at mine site; provisional and final settlement terms in the existing sales-sequence panel.

These are contractual terms and projected-scenario commitments. They do not establish a current mineral reserve, delivered metal, or achieved production.

Source (1)
EXW doré collection and payment settlement
Contracted doré sales and settlement
StepCompany-disclosed terms
CollectionOcean Partners collects at the mine site (EXW).
PriceLBMA or COMEX market-price basis.
Payable metal99.8% of contained gold; 99% of silver.
RefiningUS$0.80/payable gold oz; US$0.50/payable silver oz.
Provisional paymentUp to 90% after document acceptance; within one business day.
Final settlementAfter final weight and assay confirmation.

These are agreement terms, not evidence of a shipment, sale or payment received.

Source (1)

Study and disclosure references

Contracted collection and payment termsReference
  • Ocean Partners is responsible for collection from the mine site.
  • Provisional payment: up to 90% within one business day after document acceptance; final settlement follows confirmed weights and assays.
  • Payability: 99.8% of gold and 99% of silver; refining charges apply.

Provisional payment follows document acceptance; final settlement follows final weights and assays.

Source (1)

Terms: Assay

Stage08

Likely stepUnconfirmed by ESGoldWhy this is a likely step

An operator bringing a processing plant into service would ordinarily track tonnes processed, recovery and plant operating time to understand how performance changes as feed increases. ESGold has not set out this ramp-up monitoring routine.

Source (1)
Related company disclosure · context only
4 sub-steps · 0 disclosed · 4 Likely
View sub-steps and references
Sub-step01

Throughput and plant availability

Likely stepUnconfirmed by ESGoldWhy this is a likely step

As a plant increases production, an operator would ordinarily track how much feed it processes and how long it runs to identify interruptions and changes in output. ESGold has disclosed plant capacity. It has not specified this ramp-up monitoring routine.

Source (1)
Related company disclosure · context only

Plant availability is the time the plant is available to run.

Terms: ThroughputPlant availability

Sub-step02

Recovery performance over time

Likely stepUnconfirmed by ESGoldWhy this is a likely step

An operator running a recovery circuit would ordinarily compare recovery across successive runs to see how changes in feed or operating conditions affect the amount of metal recovered. ESGold has published study assumptions. It has not described this operating measurement routine.

Source (1)
Related company disclosure · context only

Terms: Recovery

Sub-step03

Production and shipment performance

Likely stepUnconfirmed by ESGoldWhy this is a likely step

An operator selling doré would ordinarily compare production with shipment records to see how much metal has been produced, dispatched and held at site. ESGold has disclosed collection terms. It has not described a recurring comparison of production and shipments.

Source (1)
Related company disclosure · context only

Terms: Doré

Sub-step04

Water, residue and remediation performance

Likely stepUnconfirmed by ESGoldWhy this is a likely step

An operator running water and residue systems would ordinarily monitor their performance to see whether treatment and water reuse work as intended under operating conditions. ESGold has described the systems’ intended functions. It has not reported this operating-performance program.

Sources (2)
Plant design and modeled study assumptions
SubjectCompany disclosure
Plant capacityESGold reported permitted capacity of up to 1,000 tonnes per day.[1]
RecoveryThe PEA applies recoveries of 89.3% for gold and 77.0% for silver in the tailings resource calculation.
Operating costThe PEA models C$35.29 per tonne in constant first-quarter 2023 Canadian dollars.
ProductionIn June 2026, ESGold described first production in 2026 as an objective.[4]
Sources (4)
Stage09

Likely stepUnconfirmed by ESGoldWhy this is a likely step

An operator moving from a cost model to actual processing would ordinarily measure spending against tonnes treated to see how operating costs compare with the study. ESGold has published modeled costs. It has not specified separate Montauban unit-cost reporting.

Source (1)
Related company disclosure · context only
2 sub-steps · 0 disclosed · 2 Likely
View sub-steps and references
Sub-step01

Tracking actual operating costs

Likely stepUnconfirmed by ESGoldWhy this is a likely step

Once feed is processed, an operator would ordinarily track spending and tonnes treated to calculate actual cost per tonne. The PEA provides a modeled cost for comparison. ESGold has published modeled costs. It has not specified a separate Montauban cost-per-tonne reporting schedule.

Source (1)
Related company disclosure · context only
Sub-step02

Comparison with study assumptions

Likely stepUnconfirmed by ESGoldWhy this is a likely step

An operator with a published cost estimate would ordinarily compare actual costs with the study on a common basis to understand differences in feed, operating volume and costs. ESGold has not announced a comparison of actual plant costs with the PEA.

Source (1)
Related company disclosure · context only

Study and disclosure references

PEA operating-cost assumptionsReference
  • The PEA estimates C$35.29 per tonne in total operating costs, including C$23.64 per tonne for processing, in Q1 2023 constant dollars.

2025 PEA; cost basis: Q1 2023 constant dollars.

These are modeled costs, not measured operating costs.

Source (1)

Terms: PEA — preliminary economic assessmentRecovery assumption

Stage10

Likely stepUnconfirmed by ESGoldWhy this is a likely step

An operator moving into doré sales would ordinarily compare operating receipts and payments over time to assess how much cash the operation generates or uses. ESGold reports consolidated cash flows. It has not announced a Montauban cash-flow reporting schedule.

Source (1)
2 sub-steps · 0 disclosed · 2 Likely
View sub-steps and references
Sub-step01

Tracking cash generated or used by the operation

Likely stepUnconfirmed by ESGoldWhy this is a likely step

Once sales and operating payments begin, an operator would ordinarily compare cash collected with cash spent to understand the operation’s cash requirements. ESGold publishes consolidated cash-flow figures. It has not specified separate Montauban cash-flow reporting.

Source (1)
Related company disclosure · context only
Sub-step02

Comparing operating cash flow across periods

Likely stepUnconfirmed by ESGoldWhy this is a likely step

An operator with several periods of activity would ordinarily compare cash receipts and operating payments over time to see whether the cash pattern persists. ESGold has not announced a schedule for comparing Montauban operating cash flow across periods.

Source (1)
Related company disclosure · context only
Consolidated financial position and operating cash flow
MeasureJune 30, 2026, auditedMarch 31, 2026, unaudited
Cash (statement caption)Cash and cash equivalents · C$16,212,859Cash · C$18,440,127
Current assetsC$16,920,518C$19,582,021
Current liabilitiesC$2,870,765C$3,609,832
Working capitalC$14,049,753C$15,972,189
Total liabilitiesC$3,320,557C$4,009,832
Cash used in operating activitiesC$2,411,230 for the year ended June 30[1]C$2,892,126 for the nine months ended March 31[5][6]

These are ESGold’s consolidated figures. The June annual statements were authorized October 22.[1] The March interim statements were authorized May 28 and carry a notice of no auditor review.[5] The annual statements identify a material going-concern uncertainty.[3]

Sources (6)

Supporting commercial activities

Supporting activity01

Disclosed by ESGoldWhat ESGold disclosed

ESGold disclosed an optional two-tranche facility in May. Its audited statements report that nothing had been drawn at June 30, 2026.[2]

Sources (2)
1 sub-step · 1 disclosed · 0 Likely · 1 conditions apply
View sub-steps and references
Sub-step01

Working capital facility available at ESGold’s election

Conditions apply
Disclosed by ESGoldWhat ESGold disclosed

ESGold disclosed an optional facility of up to C$9 million in two conditional tranches. Its audited statements report zero drawn at June 30, 2026.[2]

Sources (2)

Additional company-reported detail

The tranches are C$3 million and C$6 million, subject to due diligence, site visits and production-timing conditions. Each draw carries a 1% fee and bears interest at three-month Term SOFR plus 7% annually, rising to SOFR plus 11% for overdue amounts.[1] Repayment may be in doré, cash or a combination. Early repayment carries a 1% fee.

Source (1)

Terms: Drawn facility trancheFlow-through financing

Financing sources, facility terms and draw conditionsUpdated · Nov 10
SubjectCompany disclosure
Flow-through financingESGold reported gross proceeds of C$4.505 million from its December flow-through offering, with qualifying exploration expenditure obligations.[4]
Equity financingESGold reported gross proceeds of C$7,264,440 at the March 10, 2026 LIFE offering closing.[3]
Ocean Partners facilityESGold may draw up to C$9 million in conditional C$3 million and C$6 million tranches. Its audited financial statements show zero drawn as at June 30, 2026.[2]

Updated · Nov 10Forward objectives are separate from funding sources. The November 9 Form 5A estimates C$2.5 million for mill completion, C$750,000 for processing start-up, C$3.1 million for exploration and C$200,000 for construction-material evaluation. The four estimates total C$6.55 million (T$R calculation); the first two total C$3.25 million. Section 5(c) refers to the annual statements and MD&A and does not provide a new current cash-to-cost reconciliation. These sums are not a disclosed funding shortfall or proof that each objective is funded. [5]

Sources (5)
Supporting activity02

Disclosed by ESGoldWhat ESGold disclosed

The 2025 PEA describes mica separation tests and previous product qualification.[1] ESGold said it intended to contact prospective buyers.[2]

Sources (2)
2 sub-steps · 2 disclosed · 0 Likely · 1 completed · 1 planned
View sub-steps and references
Sub-step01

Mica separation tests and historical product qualification

Test work reported
Disclosed by ESGoldWhat ESGold disclosed

The 2025 technical report documents SGS separation tests on eight composites and reports prior qualification of the Montauban mica product.[3]

Sources (2)

Additional company-reported detail

The report describes 30 samples from eight holes combined into eight composites for SGS testing.

Source (1)

Terms: Mica

Mica test work, buyer contacts and PEA assumptions

The PEA reports separation tests on eight composites, prior product qualification and a catalogue circulated in 2018.[1][2] At the report date, ESGold had no mica client and intended to contact prospective buyers.[2]

The study estimates 57,200 tonnes of inferred mica concentrate, assumes bulk concentrate sales and uses US$300 per tonne in its model.

Sources (4)
Supporting activity03

Disclosed by ESGoldWhat ESGold disclosed

ESGold announced a second non-binding MOU with Gestion D.S. 50 Inc. for up to 200,000 metric tonnes annually.[2] Together with Culture H. Dolbec Inc.’s October 29 MOU for up to 300,000, the proposed combined supply is up to 500,000 metric tonnes annually.[1][2] Future supply requires material characterization, environmental testing, applicable regulatory approvals and definitive agreements.[1][2] These volumes are indicative maximums, not guaranteed deliveries, purchases or minimum commitments.[2] Pricing and other commercial terms remain unset.[2]

Updated · Nov 10The November 9 Form 5A targets preliminary testing and evaluation of processed tailings for aggregate use within the next twelve months at an estimated C$200,000. It describes the initiative as exploratory and at the MOU stage. The filing also describes potential polymer-bound products such as bricks, cinder blocks, paving stones, patio tiles, parking columns and highway Jersey barriers; these uses remain under preliminary evaluation. No suitability results, definitive sales or commercial production are established. [3]

Sources (3)
4 sub-steps · 4 disclosed · 0 Likely · 1 completed · 3 conditions apply
View sub-steps and references
Sub-step01

Non-binding aggregate-reuse MOUs

Two MOUs signed
Disclosed by ESGoldWhat ESGold disclosed

ESGold announced a second non-binding MOU with Gestion D.S. 50 Inc. for up to 200,000 metric tonnes annually.[2] Together with Culture H. Dolbec Inc.’s October 29 MOU for up to 300,000, the proposed combined supply is up to 500,000 metric tonnes annually.[1][2]

Sources (2)
Sub-step02

Material characterization & environmental testingUpdated · Nov 10

Conditions apply
Disclosed by ESGoldWhat ESGold disclosed

Future supply requires material characterization, environmental testing, applicable regulatory approvals and definitive agreements.[1][2]

Updated · Nov 10The November 9 Form 5A targets preliminary construction-material testing/evaluation within the next twelve months at an estimated C$200,000. The initiative remains exploratory and at the MOU stage. This is a disclosed plan; testing completion and suitability remain unconfirmed. [3]

Sources (3)
Sub-step03

Regulatory approvals & definitive aggregate agreements

Conditions apply
Disclosed by ESGoldWhat ESGold disclosed

Future supply requires material characterization, environmental testing, applicable regulatory approvals and definitive agreements.[1][2] The November 3 release states that Montauban is permitted to process up to 300,000 tonnes of historic tailings annually; an increase requires the requisite permits.[2]

Sources (2)
Sub-step04

Potential annual aggregate supply under the MOUs

Conditions apply
Disclosed by ESGoldWhat ESGold disclosed

ESGold announced a second non-binding MOU with Gestion D.S. 50 Inc. for up to 200,000 metric tonnes annually.[2] Together with Culture H. Dolbec Inc.’s October 29 MOU for up to 300,000, the proposed combined supply is up to 500,000 metric tonnes annually.[1][2] These volumes are indicative maximums, not guaranteed deliveries, purchases or minimum commitments.[2] Pricing and other commercial terms remain unset.[2]

Sources (2)
Aggregate MOUs: terms & conditionsUpdated · Nov 10
SubjectCompany disclosure
First MOUCulture H. Dolbec Inc. · Announced October 29, 2026 · Proposed supply of up to 300,000 metric tonnes annually[1]
Second MOUGestion D.S. 50 Inc. · Announced November 3, 2026 · Proposed supply of up to 200,000 metric tonnes annually[2]
Combined proposed supplyUp to 500,000 metric tonnes annually[2]
Intended material/useNeutralized mining residue for potential beneficial reuse as construction aggregate[1][2]
ConditionsFuture supply requires material characterization, environmental testing, applicable regulatory approvals and definitive agreements.[1][2]
Commercial termsThese volumes are indicative maximums, not guaranteed deliveries, purchases or minimum commitments.[2] Pricing and other commercial terms remain unset.[2]
Permitted annual tailings processingThe November 3 release states that Montauban is permitted to process up to 300,000 tonnes of historic tailings annually; an increase requires the requisite permits.[2] The proposed aggregate volume, permitted tailings-processing limits, PEA processing schedule and actual operating throughput describe different things. They are not interchangeable.

Updated · Nov 10The November 9 Form 5A targets preliminary testing and evaluation of processed tailings for aggregate use within the next twelve months at an estimated C$200,000. It describes the initiative as exploratory and at the MOU stage. The filing also describes potential polymer-bound products such as bricks, cinder blocks, paving stones, patio tiles, parking columns and highway Jersey barriers; these uses remain under preliminary evaluation. No suitability results, definitive sales or commercial production are established. [3]

The C$200,000 estimate concerns preliminary evaluation; it is not a commercial-scale aggregate production budget, margin forecast or forecast revenue. [3]

Sources (3)

04 / MONTAUBAN PATHWAY

District-Scale Exploration

Company disclosures on land, geophysics, drilling, assays and historical estimate validation.

All 25 Exploration sub-steps are disclosed by ESGold. Both views show the same 25 sub-steps.

Select a stage to see its sub-steps. Each visible pill has an explanation directly below it. Sub-step details are shown in full.

Jump to stage
Stage01

Disclosed by ESGoldWhat ESGold disclosed

ESGold announced conditional purchase agreements for 44 claims in July and subsequently reported delivery of the consideration.[1][2] It also reported receiving Québec’s exploration authorization for drilling.[3]

Sources (3)
3 sub-steps · 3 disclosed · 0 Likely · 1 completed · 2 reported
View sub-steps and references
Sub-step01

Definitive agreements to acquire 44 mineral claims

Agreements signed • consideration delivered
Disclosed by ESGoldWhat ESGold disclosed

ESGold announced agreements for 44 claims on July 14.[1] Its annual financial statements report that it delivered C$70,000 and 600,000 shares to the vendors.[2]

Sources (2)

Additional company-reported detail

The agreements cover approximately 2,448 ha near Lac Viking, Lac Lanctôt and Lac Charlie for a 100% interest with no retained royalty.[1] The July release specified transfers and CSE approval as closing conditions.[1]

Source (1)

Terms: Mineral claimRoyaltyClosing conditions

Sub-step02

Authorization of Impact-Causing Exploration Work (ATI) received

Authorization received
Disclosed by ESGoldWhat ESGold disclosed

On July 28, ESGold reported receiving Québec’s Authorization of Impact-Causing Exploration Work for the planned drilling program.

Source (1)
Sub-step03

Final drill-site preparation, access planning and contractor mobilization

Drilling commenced · September 3
Disclosed by ESGoldWhat ESGold disclosed

ESGold reported advancing site preparation, access planning and contractor mobilization on July 28.[1] It announced the start of drilling on September 3.[2]

Sources (2)
Dated land-position disclosuresUpdated · Nov 10
SubjectCompany disclosure
February 5ESGold reported 144 newly staked claims and a total of 417 claims covering approximately 20,618 hectares.[1]
MayThe presentation lists 485 claims covering approximately 24,414 hectares.[2] The May 5 release describes agreements for additional claims.[3]
June 30The annual MD&A reports 265 claims covering approximately 13,116 hectares at year-end.[5]
July 14ESGold announced two definitive agreements for 44 claims covering approximately 2,448 hectares, subject to transfers and CSE approval.[4]
October presentationESGold again lists 485 claims covering approximately 24,414 hectares.
October 22 financial statementsESGold reported delivering C$70,000 cash and 600,000 shares in connection with the two agreements.[6]

Updated · Nov 10November 9, 2026 Form 5A, Section 5(a): ESGold reports 485 mining claims and 24,414 hectares. This repeats the larger land position shown in the presentations. It does not reconcile the annual MD&A’s June 30 figures or establish individual claim-registration completion dates. [8]

Sources (8)
Land position, acquisition terms and mapUpdated · Nov 10

The July agreements cover 44 claims near Lac Viking, Lac Lanctôt and Lac Charlie.[1] ESGold described a 100% interest with no retained royalty, subject to claim transfers and CSE approval.[1] Its annual statements subsequently record delivery of C$70,000 and 600,000 shares.[2]

The June 30 annual MD&A reports 265 claims covering approximately 13,116 hectares.[3] The October presentation lists 485 claims covering approximately 24,414 hectares.[4]

ESGold claim map published with the July 14, 2026 acquisition announcement. The October 22 annual statements subsequently report delivery of the acquisition consideration.

Updated · Nov 10November 9, 2026 Form 5A, Section 5(a): ESGold reports 485 mining claims and 24,414 hectares. This repeats the larger land position shown in the presentations. It does not reconcile the annual MD&A’s June 30 figures or establish individual claim-registration completion dates. [6]

Sources (6)

Study and disclosure references

Land figures by reporting date ReferenceUpdated · Nov 10

The June 30 annual MD&A reports 265 claims covering approximately 13,116 hectares.[1] The October presentation lists 485 claims covering approximately 24,414 hectares.[2] The May presentation also listed 485 claims.[3] Each figure is shown against its own source date.

Updated · Nov 10November 9, 2026 Form 5A, Section 5(a): ESGold reports 485 mining claims and 24,414 hectares. This repeats the larger land position shown in the presentations. It does not reconcile the annual MD&A’s June 30 figures or establish individual claim-registration completion dates. [4]

Sources (4)

Terms: Mineral claim

Stage02

Disclosed by ESGoldWhat ESGold disclosed

On September 15, ESGold announced completion of the expanded ANT survey and an integrated geological model covering approximately 70 km².

Source (1)
3 sub-steps · 3 disclosed · 0 Likely · 3 completed
View sub-steps and references
Sub-step01

Historical drilling, geochemistry and geological data integrated into the model

Integration reported
Disclosed by ESGoldWhat ESGold disclosed

On September 15, ESGold reported integrating 1,637 drill holes, including 90 newly integrated historical holes, and 1,707 geochemical samples into its model.

Source (1)
Sub-step02

Expanded Phase 2 Ambient Noise Tomography (ANT-2) survey

Field collection completed
Disclosed by ESGoldWhat ESGold disclosed

ESGold reported field collection complete on May 26.[1] Its September 15 release describes 200 ANT-2 stations recording from March 19 to April 19.[2]

Sources (2)

Additional company-reported detail

The September release describes 32 days of recording and station spacing of approximately 400–600 m.

Source (1)

Terms: ANT — ambient noise tomography

Sub-step03

Updated property-scale 3D geological model

Model completed
Disclosed by ESGoldWhat ESGold disclosed

On September 15, ESGold announced an integrated geological model covering about 70 km².[1] The reported depth range of 86 m to 1.2 km applies to the northern ANT-2 data.[1]

Source (1)

Additional company-reported detail

ESGold identified structural deformation as a possible explanation for folded, repeated or displaced favourable geological units. Geomatic World performed the modeling using CAUR’s ANT interpretation.

Source (1)

Terms: Mineral resourceGeological model

ANT survey findings and ESGold’s interpretation

ESGold’s September 15, 2026 update combines ANT observations with drilling, geochemistry and geology.[2] CAUR interpreted ANT data; Geomatic World built the integrated model.

Initial model dimensions
Approximately 900 m vertically and more than 2 km along strike (February 3, 2026).[1]
Expanded coverage
Integrated geological interpretation: approximately 70 km².[2]
Northern ANT-2 depth
Useful geological constraint: approximately 86 m to 1.2 km below surface.[2]
Survey collection
200 stations; 400–600 m spacing; 32 days of recording, March 19–April 19, 2026.
Historical data integrated
1,637 drill holes, including 90 additional historical holes, and 1,707 geochemical samples.[2]
Geophysical features
Broad near-horizontal low-velocity layers and near-vertical corridors trending approximately 020°.
ESGold’s interpretation
Folding, faulting and deformation may repeat, stack or displace favourable geological units in a gold- and silver-rich VMS setting.
Priority areas
South, east and southeast; northern ANT-2 ground remains comparatively under-tested.[2]
Further work
Database validation, target ranking and targeted drilling form ESGold’s 2027 planning framework.[2]

What the model does not confirm · ANT features alone do not demonstrate mineralization. The model does not establish grade, tonnage or continuity and is not a mineral resource estimate. These exploration hypotheses require testing.

The annual MD&A separately discusses comparisons with Broken Hill-style systems as an exploration concept.[3]

Sources (3)
Company ANT-1/ANT-2 coverage and 3D geological-model figures
Company figure, September 15, 2026. The marked historical holes are model inputs, not newly completed 2026 drilling. · Open the company disclosure (opens in a new tab) · Open the original company figure (opens in a new tab)
Company interpretation, September 2026. Colour and shape represent modeled geology and hypotheses; not a mineral-resource estimate. · Open the company disclosure (opens in a new tab) · Open the original company figure (opens in a new tab)
Development of the integrated 3D geological model
SubjectCompany disclosure
November 13, 2025ESGold reported a partially completed model.[1]
February 3, 2026ESGold released its initial integrated ANT-based model.
February 20ESGold announced the expanded survey had started February 17.
April 9ESGold reported data acquisition in progress.
May 26ESGold reported field collection complete, instruments removed and analysis underway.
September 15ESGold reported 200 stations recording from March 19 to April 19 and an updated integrated model covering approximately 70 km².[6]
Annual MD&AThe year-end MD&A separately describes an expanded survey of approximately 76 km² as completed in February.[7] The field dates above follow the dated operational releases.
Sources (7)
Company-described target areas
SubjectCompany disclosure
Historic mine areaESGold reported initial drilling around the historic workings and intersections with historic underground openings.
South and deeper targetsLater holes extended south toward targets including Marcor.[1] MM-26-28 was in progress at the October 4 cutoff with a planned length of approximately 600 m.[1]
2027 planningESGold said initial drilling would focus on the best-supported targets, including selected southern and eastern opportunities. Northern targets require further evaluation.
Sources (2)
Historic mining and exploration context
PeriodHistoric work described
1910–1966Lead-zinc discovery in 1910; successive Tétreault–Anacon operators mined and milled base-metal ore through the mid-20th century.
June 1953–January 1954The report records 100,309 short tons milled from the Montauban Zone.
1961–early 1962An earlier tailings concentrator ran for about eight months and ceased when feed-grade variation made recovery uneconomic, according to the report.
1983–1990Muscocho mined gold-bearing zones; the report cites 813,632 tonnes for this period.

Section 6.1 of the 2025 technical report describes these historical operations.[1] In September 2026, ESGold said it did not treat historical bedrock estimates as current resources or reserves.

Sources (2)
Stage03

Disclosed by ESGoldWhat ESGold disclosed

On October 20, ESGold reported approximately 4,074 m drilled against the planned 5,000 m. The release identifies MM-26-28 as in progress at the October 4 hole-status cutoff.

Source (1)
2 sub-steps · 2 disclosed · 0 Likely · 1 underway · 1 planned
View sub-steps and references
Sub-step01

2026 diamond-drilling progress

Underway on October 20
Disclosed by ESGoldWhat ESGold disclosed

On October 20, ESGold reported approximately 4,074 m drilled, more than 80% of the planned 5,000 m.[1] Final metres were subject to database reconciliation.

Source (1)

Additional company-reported detail

ESGold reported about 408 m for hole MM-26-27.[1] At the October 4 hole-status cutoff, MM-26-28 was in progress with a planned length of about 600 m.[1] The October 20 release reported assays pending.[1]

Source (1)

Terms: Sulphide-bearing intervalAssayMetres drilledDownhole lengthTrue width

Sub-step02

Planned drilling distance and holes

Company plan
Disclosed by ESGoldWhat ESGold disclosed

On September 3, ESGold announced a 5,000 m program with 29 proposed holes.[1] Its October 20 update reported approximately 4,074 m drilled.[2]

Sources (2)
Drilling distance · October 20, 2026 · Approximately 4,074 m of 5,000 m planned.

ESGold described this as more than 80% and said its final total was subject to reconciliation. View the drilling figures.

Source (1)
2026 drilling progress and program objectives
SubjectCompany disclosure
ProgramESGold proposed 5,000 m in 29 holes.
DistanceApproximately 4,074 m, described by ESGold as more than 80% of the planned distance.[3] The release makes final metres subject to reconciliation.
Hole statusMM-26-28 was in progress at the October 4 cutoff and had a planned length of approximately 600 m.[3]
Samples and assaysApproximately 400 samples had been submitted by September 24.[2] The October 20 update reported laboratory assays pending.[3]
Sources (3)
Selected core observations and hole lengths
HoleMeasurement and reported observation
MM-26-03Core photograph interval, 20.42–24.68 m.
MM-26-04Core photograph interval, 27–35 m.
MM-26-10Logged interval, 92.6–95.7 m. Separate vein at approximately 123.5 m.
MM-26-11Host-rock interval, 20.6–31.9 m. ESGold describes a band approximately 48 cm wide near 24.07 m.
MM-26-13Vein at 52.51 m. A separate altered zone begins at 66.77 m.
MM-26-17Two separate veins, one at 75.21 m and one at 93.2 m.
MM-26-19ESGold reports a vein at 30.7 m and localized veins within a separate 42.4–43.8 m interval.
MM-26-21Drilling extended south toward additional targets including Marcor.[2]
MM-26-23, MM-26-25 and MM-26-27Reported hole lengths of approximately 255 m, 261 m and 408 m respectively.
MM-26-28Planned hole length of approximately 600 m. In progress at the October 4 cutoff.

ESGold identifies the photographs as visual observations. Core lengths may differ from true widths, and laboratory assays are needed to establish grade.

ESGold · October 20, 2026 · Figure 1 · MM-26-11 · 24.0–30.2 m · altered rock with quartz-carbonate veining and visible sulphides · quartz-carbonate vein · Open original company image (opens in a new tab)
ESGold · October 20, 2026 · Figure 1 · MM-26-11 · close view of the 24.0–30.2 m photographed interval · Open original company image (opens in a new tab)
ESGold · October 20, 2026 · Figure 2 · MM-26-17 · 75.21–93.2 m photographed range · quartz-carbonate veining with visible sulphides · Open original company image (opens in a new tab)
ESGold · October 20, 2026 · Figure 2 · MM-26-17 · second view of the photographed core range · Open original company image (opens in a new tab)
ESGold · October 20, 2026 · Figure 3 · MM-26-19 · 42.4–43.8 m · local quartz-carbonate veins with pyrrhotite and pyrite · Open original company image (opens in a new tab)
ESGold · October 20, 2026 · Figure 4 · MM-26-19 · 30.7 m · quartz-carbonate veining with pyrrhotite · Open original company image (opens in a new tab)
Sources (2)
2026 drill-hole locations
Company figure, September 24, 2026. Map labels do not by themselves establish which proposed collars were completed. · Open the company disclosure (opens in a new tab) · Open the original company figure (opens in a new tab)

Study and disclosure references

Drilling program and contractorReference
  • Plan: 5,000 m in 29 holes, using east–west orientations across the historical mine area.
  • Forage Lamontagne is the contractor; work targets historical mineralization, continuity and extensions.

Program commencement announced September 3, 2026.

The planned metres and holes are program targets, not completed totals.

Source (1)
Stage04

Disclosed by ESGoldWhat ESGold disclosed

ESGold reported approximately 400 samples submitted in September.[1] Its October 20 update described ongoing core logging and sampling, with laboratory assays pending.[2]

Sources (2)
4 sub-steps · 4 disclosed · 0 Likely · 1 completed · 2 underway · 1 pending
View sub-steps and references
Sub-step01

Core logging and photography

Underway on October 20
Disclosed by ESGoldWhat ESGold disclosed

ESGold’s October 20 release describes continuing core logging and publishes photographs of selected holes, including MM-26-11, MM-26-17 and MM-26-19.

Source (1)
Sub-step02

Core cutting and sampling

Sampling underway on October 20
Sub-step04

Laboratory assays from submitted samples

Pending on October 20

Terms: Assay

Company-reported sampling, assay review and model integration

ESGold described logging, photographing and sampling drill core under a Qualified Person’s supervision. On September 24, it reported submitting approximately 400 samples to SGS.[2] The company said it would release assays after receipt, review and validation.[2] On October 20, it reported using core observations and historic records in its geological interpretation while assays were pending.[3]

Sources (3)
Stage05

Disclosed by ESGoldWhat ESGold disclosed

ESGold said in September that it would release assays after review and validation.[1] In October, it reported integrating core observations into its geological model while assays were pending.[2]

Sources (2)
3 sub-steps · 3 disclosed · 0 Likely · 1 underway · 1 planned · 1 pending
View sub-steps and references
Sub-step01

Review and validation of laboratory assays

Results pending on October 20
Disclosed by ESGoldWhat ESGold disclosed

ESGold said results would be reviewed and validated under its QA/QC procedures before release.[1] On October 20, laboratory assays were pending.[2]

Sources (2)
Sub-step03

Integrated geological interpretation and model refinement

Underway on October 20
Disclosed by ESGoldWhat ESGold disclosed

On October 20, ESGold reported integrating new core observations with historical mine records, ANT data and its 3D geological model while laboratory assays were pending.

Source (1)
Stage06

Disclosed by ESGoldWhat ESGold disclosed

Phase 1 of ESGold’s 2027 planning framework includes a historical drill-hole database audit and refinement of geological interpretations and the locations of historical workings.

Source (1)
2 sub-steps · 2 disclosed · 0 Likely · 2 planned
View sub-steps and references
Sub-step01

Formal audit and validation of the historical drillhole database

Planned for the 2027 framework
Disclosed by ESGoldWhat ESGold disclosed

Phase 1 of ESGold’s September 15 framework calls for auditing the historical drill-hole database and refining geology and the positions of historic workings.

Source (1)
Sub-step02

Lithological and structural interpretation refinement and 3D-model version control

Planned for the 2027 framework
Disclosed by ESGoldWhat ESGold disclosed

In Phase 1, ESGold described refining lithological and structural interpretations, integrating additional datasets and maintaining version control for its 3D model.

Source (1)
Framework for 2027 Exploration PlanningUpdated · Nov 10
Company’s 2027 exploration-planning framework
PhaseDisclosed work
1 · ValidateAudit historical data; refine geology and workings positions; maintain model version control.
2 · RankCompare lithology, structure, Zn–Cu ± Ba–Ag responses and geophysics.
3 · TestDesign targeted drilling; incorporate results into the model and revise priorities.

The framework describes planned work, not three completed phases or fixed start dates.

Updated · Nov 10The November 9 Form 5A adds a broad next-twelve-month objective for continued drilling and evaluation of recent drilling and other exploration work at an estimated C$3.1 million. The purpose is to assess additional mineralization potential and whether further exploration is warranted. The filing does not allocate that estimate across the three 2027 framework phases, identify a final next-phase hole list or report the future phases complete. [2]

Source (1)
Source (1)
Stage07

Disclosed by ESGoldWhat ESGold disclosed

Phase 2 of the 2027 framework calls for ranking targets using geological, structural, geochemical and geophysical evidence.

Source (1)
1 sub-step · 1 disclosed · 0 Likely · 1 planned
View sub-steps and references
Sub-step01

Geological, geochemical and geophysical target ranking

Planned for the 2027 framework
Disclosed by ESGoldWhat ESGold disclosed

In Phase 2, ESGold plans to rank targets using the agreement among geological setting, structure, geochemical indicators and geophysical observations.

Source (1)
Stage08

Disclosed by ESGoldWhat ESGold disclosed

In Phase 3, ESGold intends to design drilling to test the highest-priority hypotheses after validation and ranking, and to use results to update the model.

Updated · Nov 10The November 9 Form 5A adds a broad next-twelve-month objective for continued drilling and evaluation of recent drilling and other exploration work at an estimated C$3.1 million. The purpose is to assess additional mineralization potential and whether further exploration is warranted. The filing does not allocate that estimate across the three 2027 framework phases, identify a final next-phase hole list or report the future phases complete. [2]

Sources (2)
3 sub-steps · 3 disclosed · 0 Likely · 2 planned · 1 conditions apply
View sub-steps and references
Sub-step01

Targeted drilling-program developmentUpdated · Nov 10

Planned for the 2027 framework
Disclosed by ESGoldWhat ESGold disclosed

ESGold places development of a targeted drilling program in Phase 3, after the targets have been validated and ranked.

Updated · Nov 10The November 9 Form 5A adds a broad next-twelve-month objective for continued drilling and evaluation of recent drilling and other exploration work at an estimated C$3.1 million. The purpose is to assess additional mineralization potential and whether further exploration is warranted. The filing does not allocate that estimate across the three 2027 framework phases, identify a final next-phase hole list or report the future phases complete. [2]

Sources (2)
Sub-step02

Selection of priority targets for drilling

Conditional company plan
Disclosed by ESGoldWhat ESGold disclosed

ESGold said initial drilling would focus on targets supported by multiple datasets, including selected southern and eastern opportunities. Northern targets require further assessment.

Source (1)
Stage09

Disclosed by ESGoldWhat ESGold disclosed

On October 20, ESGold described drilling south toward Marcor and testing deeper interpreted features beyond the historic mine workings.

Source (1)
2 sub-steps · 2 disclosed · 0 Likely · 1 planned · 1 reported
View sub-steps and references
Sub-step01

Testing beyond the historic mine workings

Drilling reported
Disclosed by ESGoldWhat ESGold disclosed

On October 20, ESGold reported drilling south toward additional targets, including Marcor, and testing deeper features.[1] It identified MM-26-28 as in progress at the October 4 cutoff.[1]

Source (1)

Additional company-reported detail

ESGold reported approximate hole lengths of 255 m for MM-26-23, 261 m for MM-26-25 and 408 m for MM-26-27.[1]

Source (1)
Sub-step02

Evaluation of mineralization, lithological contacts, alteration and structural features

Company plan
Disclosed by ESGoldWhat ESGold disclosed

On September 24, ESGold described plans to evaluate how mineralization relates to rock contacts, alteration and structure using drilling and assay information.

Source (1)
Stage10

Disclosed by ESGoldWhat ESGold disclosed

ESGold described work to assess its historical estimates and determine whether a current estimate may be warranted.[1] It also identified conditions for any future crown-pillar extraction.[2]

Sources (2)
2 sub-steps · 2 disclosed · 0 Likely · 1 planned · 1 conditions apply
View sub-steps and references
Sub-step01

Assessment of work needed to validate historical estimates

Company objective
Disclosed by ESGoldWhat ESGold disclosed

ESGold said it would use new drilling and analytical data to assess the historical estimates and determine whether a current resource estimate may be warranted.[1] Its 2027 framework includes a database audit.[2]

Sources (2)
Sub-step02

Conditions for possible future crown-pillar extraction

Conditions apply
Disclosed by ESGoldWhat ESGold disclosed

ESGold said any future extraction of crown-pillar material would depend on additional drilling, technical evaluation, engineering review, economic analysis and any further approvals required.

Source (1)
Historical estimates and ESGold’s stated evaluation objectives

The 2025 PEA included conversion of the 2003 historical hard-rock estimate in a conceptual project schedule.[2] The study excluded historical hard-rock mineralization from its project economics.

On September 3, 2026, ESGold said it would use new drilling and analytical data with other technical work to assess the historical estimates and determine whether a current mineral resource estimate may be warranted.[1] It said a Qualified Person had not completed sufficient work to classify the historical estimates as current resources or reserves.[1]

ESGold’s September 15 framework identifies database validation, target ranking and targeted drilling.[4] Its July 28 release separately identifies conditions for any future crown-pillar extraction.[3]

Sources (4)

05 / COMPANY RELEASES

Disclosure history

33 dated news-release, financial-report, shareholder-letter and regulatory-filing updates cited on this page, including financing and corporate announcements. The latest ten are shown first. Presentations and technical reports remain in the source register. This selection is not ESGold’s complete disclosure archive.

November 10, 2026Form 5A: operating and exploration objectives and cost estimatesUpdated · Nov 10Both pathways · Regulatory filing

The Form 5A is dated November 9, 2026 and covers the financial year ended June 30, 2026. Section 5(b) identifies these forward objectives:

  • Remaining mill completion, including installation, testing and commissioning: next six months; estimated C$2.5 million.
  • Historic-tailings processing commencement after mill completion and commissioning: next six months; estimated start-up cost C$750,000.
  • Continued drilling and evaluation of recent drilling and other exploration work: next twelve months; estimated C$3.1 million.
  • Preliminary construction-material testing/evaluation of processed tailings: next twelve months; estimated C$200,000; exploratory and at the MOU stage.

Section 5(a) reports 485 claims / 24,414 ha, describes the mill building’s expansion from 16,000 to 20,000 sq. ft., attributes completed mill engineering to Alphard Engineering, and describes potential polymer-bound construction products under preliminary evaluation. These statements do not confirm production, completed testing or a new resource.

The costs are estimates and the periods are objectives. The four estimates total C$6.55 million (T$R arithmetic), not a reconciled full budget or financing gap. The filing does not provide new assay results, a final drilling total, first doré, shipments, operating revenue or commercial production.

The attached annual statements and MD&A retain their June 30 reporting period and October 22 authorization/information date. Their existing October 22 history entry remains; the attachments are not counted as new November financial results. Section 3’s securities table is explicitly a June 30 year-end snapshot, including 1,025,000 RSUs, rather than a November share count.

Related entries: Mill installation · Commissioning · Processing objective · Aggregate evaluation · Exploration planning · Land position · Financial estimates · Relevant FAQs

Source (1)
November 3, 2026Second non-binding aggregate MOU and annual processing limitProduction Development

ESGold announced a second non-binding MOU with Gestion D.S. 50 Inc. for up to 200,000 metric tonnes annually. Together with Culture H. Dolbec Inc.’s October 29 MOU for up to 300,000, the proposed combined supply is up to 500,000 metric tonnes annually.

Future supply requires material characterization, environmental testing, applicable regulatory approvals and definitive agreements.

These volumes are indicative maximums, not guaranteed deliveries, purchases or minimum commitments. Pricing and other commercial terms remain unset.

The November 3 release states that Montauban is permitted to process up to 300,000 tonnes of historic tailings annually; an increase requires the requisite permits.

The proposed aggregate volume, permitted tailings-processing limits, PEA processing schedule and actual operating throughput describe different things. They are not interchangeable.

How the November 3 disclosure changed the pathways page · 8 page changes

1The existing aggregate supporting activity now covers two MOUs.

The existing four sub-steps have been updated. The signing entry remains completed; testing, approvals, definitive agreements and potential supply remain conditional. No stage or sub-step was added. View affected entry

2The aggregate terms panel now separates the two arrangements.

It shows both counterparties and their dated proposed amounts, followed by the combined amount. The volume restrictions remain alongside those figures. View affected entry

3Permit references now include the disclosed annual processing limit.

The project facts and authorization tables now include the annual statement, separately from daily capacity, the PEA schedule and proposed aggregate supply. View affected entry

4The Production snapshot and latest-disclosure card were updated.

They now identify November 3 as the latest Production disclosure. The equipment-letter date and October 20 exploration measurement dates remain separate. View affected entry

5Related FAQs and open questions were synchronized.

The aggregate and permit answers now reflect both MOUs and the annual processing statement. Unconfirmed outcomes remain identified as unconfirmed. View affected entry

6Residue-reuse explanations and glossary context now cover both MOUs.

The relevant company-context passages were updated; existing definitions and term links were retained. View affected entry

7Disclosure history and comparison now include November 3.

The new release links to the affected pathway entries. October 29 remains a separate historical disclosure, and the shareholder letter has its own November 2 posting-date entry. View affected entry

8Sources and the review cutoff were synchronized.

The release was added as a distinct source and connected to the first MOU. Citations were updated and the selected-disclosure review cutoff advanced after review. The release does not change an exploration milestone. View affected entry

Aggregate activity · Terms · Authorizations · Aggregate FAQs

Source (1)
Posted November 2, 2026 · October shareholder letterEquipment arrivals, continuing shipments and construction updateProduction Development · exploration recap

The letter covers October 2026 and was listed on ESGold’s investor page on November 2, 2026. The posting date is not an equipment-arrival date.

The October shareholder letter reports 19 equipment containers onsite, six additional flat-rack containers at sea and three preparing to leave China.

The letter’s photograph caption describes a modular building under construction for equipment unloading and sheltered winter workspace.

The letter reports advancing installation and commissioning preparations, and identifies circuit integration among the next activities.

The letter repeats the October 20 drilling figures and refers to upcoming assays; it provides no new assay results or final program total.

The two dated container reports are not reconciled in the reviewed disclosures. Do not infer a revised total order or an explanation for the different counts.

Receipt of all remaining equipment, completed plant integration and commissioning, and first production remain unconfirmed in the disclosures reviewed through November 10, 2026.

Other company-reported context

Management reported US investor meetings and planned further San Francisco outreach. Planned meetings are not treated as completed. Management said Vancouver routing helped manage transport costs, without quantifying savings.

The equipment record and related summaries were updated; entire plant readiness is not marked complete.

Equipment · Site infrastructure · Commissioning · Drilling

Source (1)
October 29, 2026Non-binding aggregate MOU & potential residue reuseProduction Development

ESGold signed a non-binding MOU with Culture H. Dolbec Inc. to evaluate possible supply of up to 300,000 metric tonnes of neutralized mining residue annually for construction. Definitive terms and deliveries depend on testing, applicable approvals and a definitive agreement. The MOU establishes no price or minimum purchase commitment.

Source (1)
How the October 29 disclosure changed the pathways pageShow 8 page changesHide 8 page changes

1A new Production supporting activity was added, with four sub-steps.

Supporting activity 03 · Evaluation of possible aggregate supply tracks the possibility of supplying treated mine residue for construction use. It sits under Production Development → Supporting commercial activities, separate from the numbered stages for gold and silver production. Only the MOU signing is marked completed.

Four new Production sub-steps · Disclosed by ESGold
New sub-stepStatusWhat it tracks
01 · Non-binding aggregate-reuse MOUCompletedESGold and Culture H. Dolbec Inc. signed a non-binding memorandum of understanding to evaluate potential supply. Completed refers to signing the MOU. The parties did not announce a definitive purchase contract.
02 · Material characterization & environmental testingConditions applyDefinitive terms and potential deliveries are subject to material characterization and environmental testing. The release did not report test results establishing suitability for construction use.
03 · Regulatory approvals & definitive aggregate agreementConditions applyPotential deliveries depend on applicable regulatory approvals and execution of a definitive agreement. The October 29 release announced the non-binding MOU.
04 · Potential annual aggregate supply under the MOUConditions applyThe MOU covers possible supply of up to 300,000 metric tonnes per year. It establishes no pricing or minimum purchase commitments. The release did not report deliveries or sales under the MOU.

No existing sub-step changed status, and no Exploration stage or sub-step was added.

2A new reference panel separates the MOU’s terms from what remains open.

Aggregate MOU terms & conditions brings the parties, intended use, potential annual quantity and delivery conditions into one table. It also identifies the two commercial terms the MOU does not establish: a price and a minimum purchase quantity.

3The existing permits panel now distinguishes tailings processing from aggregate reuse.

The October 29 update to Project authorizations and environmental requirements distinguished the existing tailings-processing authorization from the separate conditions for possible construction use of the residue.

4The remediation panel now explains what could happen to the residue after metal recovery.

Water treatment, site remediation and community context now describes ESGold’s plan to neutralize and stabilize the remaining material and evaluate it for reuse. The panel distinguishes that plan from measured treatment results, confirmed aggregate suitability or completed reclamation.

5The next-activities table now has a separate aggregate entry.

Company-stated plans, conditions and sequences includes equipment and plant readiness. The aggregate entry identifies conditions for possible deliveries under the MOU: material characterization, environmental testing, applicable regulatory approvals and a definitive agreement.

6Five glossary definitions were added and linked from the new content.

Select a term for its definition: Non-binding memorandum of understanding (MOU), Construction aggregate, Material characterization, Beneficial reuse or Neutralized mining residue.

7The disclosure history now has a Production entry for October 29.

The October 29 disclosure summary records the MOU and links to all four new sub-steps. The October 20 drilling and equipment update remains a separate dated record. The current disclosure history also includes the October 22 annual filings.

8The Production snapshot, source register and review date were updated.

The Production card in Montauban at a glance added the aggregate MOU and an October 29 update date. The Exploration field update retained October 20 because the October 29 release added no exploration results. The October 29 ESGold release was added to the source register. The page’s disclosure review date advanced from October 20 to October 29, 2026.

Archived page counts for the October 29 edition — historical editorial totals, not current page totals or project progress.

Archived page counts · October 29 edition

These figures describe the earlier October 29 page edition. They are editorial history, not current page totals or measures of ESGold’s project progress.

  • Tracked sub-steps increased from 68 to 72.
  • Glossary terms increased from 52 to 57.
  • The disclosure history then contained 22 updates.
  • The October 29 release was the 31st source entry.

Current content totals appear in the pathway, FAQ, glossary and source sections. Later editions have revised the content and expanded disclosure coverage.

October 22, 2026Annual financial statements and MD&ACorporate financial information and Exploration

Corporate financial information and Exploration. ESGold reported C$16,212,859 in cash and cash equivalents and C$14,049,753 in working capital at June 30, with no draw on the Ocean Partners facility at that date.[1][4] Subsequent events include delivery of the consideration for the 44-claim agreements and the decision against proceeding with the proposed Planta arrangement.

Sources (4)
October 20, 2026Drilling progress, model integration and equipment logisticsBoth pathways

ESGold reported approximately 4,074 m drilled, more than 80% of the planned distance, subject to reconciliation. Core logging, sampling and model integration continued while assays were pending. MM-26-28 was in progress at the October 4 hole-status cutoff. ESGold reported 19 equipment containers at sea and eight scheduled to depart that week.

Source (1)

T$R page changes recorded October 20, 2026. T$R updated equipment dispatch, drilling progress, selected hole observations, company photographs and links to the source release.

September 24, 2026Drilling and sample submissionDistrict-Scale Exploration

ESGold reported approximately 2,030 m drilled as of September 15, continuing core logging, cutting and sampling, and approximately 400 samples submitted to SGS. It said results would be released following review and validation.

Source (1)
September 15, 2026Expanded survey and geological modelDistrict-Scale Exploration

ESGold reported completion of the expanded ANT survey and an integrated model covering about 70 km². It outlined three phases for 2027 planning: validate the database, rank targets and design targeted drilling.

Source (1)
September 10, 2026Equipment arrival and commissioningProduction Development

ESGold reported arrival of the Falcon concentrator and industrial thickeners. Installation, mechanical and electrical integration, system testing and operational preparation were underway.

Source (1)
September 3, 2026Mine-area drilling commencementDistrict-Scale Exploration

ESGold announced the start of a 5,000 m diamond-drilling program with 29 proposed holes. It described the historical estimates as non-current and set out its sampling and QA/QC procedures.

Source (1)
September 1, 2026Investor-awareness service engagementCorporate disclosure

ESGold announced a media services agreement with i2i Marketing Group for investor-awareness and digital marketing services. It disclosed an initial US$300,000 media budget and no securities compensation. This corporate engagement does not establish progress in either Montauban pathway.

Source (1)
July 28, 2026Exploration authorizationBoth pathways

ESGold reported receipt of Québec’s authorization for planned exploration drilling and advancing access preparations. It also described continued development of its permitted tailings project.

Source (1)
July 21, 2026Equipment inspections and logisticsProduction Development

ESGold reported inspections in China, engineering approval for shipment and delivery of mobile water-treatment equipment to Montauban.

Source (1)
See 20 more disclosuresShow fewer disclosures
July 14, 2026Conditional mineral-claim acquisitionDistrict-Scale Exploration

ESGold announced two definitive agreements for 44 claims covering approximately 2,448 hectares. The July release identified claim transfers and CSE approval as closing conditions.

Source (1)
June 17, 2026Operations Director appointedProduction Development

ESGold appointed Pierre-Marc Gagnon, P.Eng., Operations Director and described his responsibilities for site execution, coordination and operational readiness.

Source (1)
June 11, 2026Doré furnace deliveredBoth pathways

ESGold reported delivery of its doré furnace for future onsite pouring and described ongoing integration of exploration information into its geological model.

Source (1)
May 28, 2026 · authorization / information dateMarch 31 interim financial statements and MD&ACorporate financial information

The interim financial statements cover the nine months ended March 31, 2026 and were authorized May 28; the accompanying MD&A provides information through May 28.[1][2] They report the earlier financial position, cash flows and subsequent events. The June 30 annual financial statements are recorded separately under October 22.

Sources (2)
May 26, 2026Doré purchase agreement signedBoth pathways

ESGold signed a definitive doré agreement with Ocean Partners with an optional working capital facility. It also reported expanded ANT field collection complete, instruments removed and data analysis underway.

Source (1)
May 25, 2026Automated market-making service engagementCorporate disclosure

ESGold announced its engagement of ICP Securities for automated market-making services. The disclosed fee is C$7,500 per month plus applicable taxes, with an initial four-month term beginning May 22. The engagement concerns trading services rather than a Montauban production or exploration milestone.

Source (1)
May 5, 2026Additional-claims agreement announcedDistrict-Scale Exploration

ESGold announced agreements for additional claims near Montauban. Its July 14 release subsequently described two definitive agreements and their closing conditions.[2]

Sources (2)
April 9, 2026Parallel plant and exploration preparationsBoth pathways

ESGold reported mill-equipment fabrication, the submission of its drilling authorization application and active ANT data collection.

Source (1)
March 10, 2026LIFE financing closingCorporate financing

ESGold announced gross proceeds of C$7,264,440 from units priced at C$0.68, each comprising one share and one-half warrant. It stated that net proceeds were intended for Montauban and general working capital and corporate purposes. The release discloses fees and states that closing remains subject to final CSE approval.

Source (1)
February 20, 2026Expanded Phase 2 Ambient Noise Tomography (ANT-2) survey announcedDistrict-Scale Exploration
February 5, 2026Additional claims stakedDistrict-Scale Exploration

ESGold reported staking 144 claims, bringing the land position it reported at that date to 417 claims covering approximately 20,618 hectares.

Source (1)
February 3, 2026Initial ANT-based geological modelDistrict-Scale Exploration

ESGold announced an initial integrated ANT-based model and identified interpreted targets for further exploration.

Source (1)
December 9, 2025Flow-through financing closingCorporate financing · Exploration

ESGold announced gross proceeds of C$4,505,000 from 5,300,000 flow-through shares at C$0.85. The proceeds were intended for qualifying exploration at Montauban, with expenditure and renunciation requirements. Gross proceeds are before the disclosed finder’s fee.

Source (1)
November 13, 2025Partial 3D model reportedDistrict-Scale Exploration

ESGold reported a partially completed geological model and described its interpretation of a potential gold-silver system at Montauban.

Source (1)
November 10, 2025Mill building completionProduction Development

ESGold reported the mill building structure, concrete floor, interior divisions, gold room and onsite laboratory complete.

Source (1)
October 28, 2025Processing methodology selectedProduction Development

ESGold reported selecting Merrill–Crowe recovery after tests showed the tested gravity concentrate was unsuitable for direct pouring.

Source (1)
October 14, 2025Colombia tailings testingOther company activity · Colombia

ESGold reported initial bench-scale metallurgical testing of tailings from Colombia’s Bolívar region under its Planta Magdalena MOU. This was separate from Montauban. Its October 22, 2026 annual filings subsequently reported that the company decided against funding the proposed entity and did not proceed with that MOU.[2]

Sources (2)
October 2, 2025Ocean Partners term sheetProduction Development

ESGold announced a binding term sheet with Ocean Partners.[1] The definitive agreement was announced on May 26, 2026.[2]

Sources (2)
September 25, 2025Mill construction in progressProduction Development

ESGold reported construction progress and described completion of the building as a target. It subsequently announced mill building completion on November 10.[2]

Sources (2)
September 4, 2025Updated preliminary economic assessment resultsProduction Development · Technical study

ESGold announced results of the updated 2025 Montauban PEA, replacing the 2023 study.[1] The release sets out study economics and assumptions, including gold, silver and mica. These are preliminary study estimates rather than measured operating results.

Sources (2)

06 / OUTSIDE THE MONTAUBAN PATHWAYS

Other ESGold disclosures

Selected company announcements that are relevant to the corporate record but do not demonstrate progress in either Montauban pathway. See ESGold’s complete news archive for other releases.

  1. Colombia tailings testing

    October 14, 2025 · ESGold reported testing of tailings in Colombia.[1] October 22, 2026 · In its annual filings, ESGold said it decided against funding the proposed entity with Planta Magdalena and did not proceed with that MOU.[2]

    Sources (2)
  2. Market-making service engagement

    Market communications; not production or exploration evidence.

    Read the company disclosure ↗
  3. Investor-awareness service engagement

    Paid market communications; not a Montauban project milestone.

    Read the company disclosure ↗

07 / DEFINITIONS

Glossary

Plain-language reading aids. Open a linked term in context, or browse the full list here.

Browse all 55 terms
ANT — ambient noise tomography
What it means

A passive geophysical method that uses natural ground vibrations to build an image of subsurface seismic-wave speeds.

In ESGold’s disclosures

ESGold used background seismic vibrations to model subsurface velocity. It combines those observations with geological and drill data to identify areas for further testing.

Assay
What it means

A laboratory test that measures the amount or concentration of a metal or other substance in a sample.

In ESGold’s disclosures

ESGold sent core samples for laboratory analysis to determine metal grades.[1] It reported assays pending on October 20.[2]

ATI — Authorization of Impact-Causing Exploration Work
What it means

Québec authorization required for specified exploration activities that disturb the land, including exploration drilling.

In ESGold’s disclosures

Québec granted ESGold an Authorization of Impact-Causing Exploration Work for its planned drill program. ESGold separately identified conditions for any future crown-pillar extraction.

Beneficial reuse
What it means

Using a waste or residual material for a useful purpose instead of disposing of it.

In ESGold’s disclosures

ESGold announced a second non-binding MOU with Gestion D.S. 50 Inc. for up to 200,000 metric tonnes annually.[2] Together with Culture H. Dolbec Inc.’s October 29 MOU for up to 300,000, the proposed combined supply is up to 500,000 metric tonnes annually.[1][2] Future supply requires material characterization, environmental testing, applicable regulatory approvals and definitive agreements.[1][2]

Closing conditions
What it means

Requirements that must be satisfied or validly waived before a transaction can be finalized.

In ESGold’s disclosures

The July agreements identify claim transfers and CSE approval as conditions for closing.

Commissioning
What it means

Preparing, testing and adjusting equipment and connected systems to bring a facility into operation.

In ESGold’s disclosures

At Montauban, ESGold describes commissioning as progressively installing, connecting and testing the components of the plant.

Company-stated target date
What it means

A company’s intended date for achieving an objective; it is not a guarantee of completion.

In ESGold’s disclosures

The date attached to a company objective. For example, ESGold described production in 2026 as an objective in its June 17 release.

Source (1)
Company disclosure
Construction aggregate
What it means

Granular material, such as sand, gravel or crushed stone, used in construction.

In ESGold’s disclosures

The October 29 and November 3 MOUs concern possible use of treated mining residue as a material for construction.[1][2] Future supply requires material characterization, environmental testing, applicable regulatory approvals and definitive agreements.[1][2]

Crown pillar
What it means

Rock left above underground mine workings to help support the ground or separate the workings from the surface.

In ESGold’s disclosures

ESGold identifies the historical crown pillar near the former mine workings as a drill target. It separately identifies conditions for any future extraction.

Database reconciliation
What it means

Checking records against their underlying data and resolving differences to establish consistent totals.

In ESGold’s disclosures

ESGold reported approximately 4,074 metres drilled in October and said its final total remained subject to reconciliation with its drilling database.

Doré
What it means

An unrefined alloy containing gold and silver that is sent for further refining.

In ESGold’s disclosures

ESGold plans to use its furnace to melt recovered precious metal into doré onsite.[1] Ocean Partners has agreed to purchase future doré under the May agreement.[2]

Downhole length
What it means

Distance measured along a drill hole, rather than vertically below the surface or across a geological feature.

In ESGold’s disclosures

ESGold reports hole length as distance measured along the drill hole. It distinguishes photographed core and hole lengths from true widths.

Drawn facility tranche
What it means

A portion of a credit facility that the borrower has actually accessed, rather than merely having available.

In ESGold’s disclosures

ESGold’s facility has two tranches.[1] Its audited statements report that nothing had been drawn at June 30, 2026.[2]

Drill core
What it means

A cylindrical sample of rock recovered by drilling and examined for geological information.

In ESGold’s disclosures

ESGold describes logging, photographing and sampling the rock recovered during its diamond-drilling program.

Exploration target — general usage
What it means

In general exploration usage, an area or geological feature selected for investigation because it may contain mineralization.

In ESGold’s disclosures

ESGold plans to rank areas for testing using geological, geochemical and geophysical evidence. The company describes these as exploration hypotheses.

Source (1)
Falcon Gravity Concentrator
What it means

A centrifugal machine that strengthens gravity separation to concentrate dense mineral particles.

In ESGold’s disclosures

ESGold describes the Falcon as a gravity concentrator designed to recover liberated precious metals.

Flow-through financing
What it means

Financing through shares that allow an eligible company to transfer qualifying resource-expense deductions to investors.

In ESGold’s disclosures

ESGold’s flow-through financing carries obligations to incur qualifying exploration expenditures. The company reported C$4.505 million in gross proceeds.[1]

Geological model
What it means

A representation of the arrangement of rocks and geological features, built from observations and interpretations.

In ESGold’s disclosures

ESGold combines drill-hole information, geochemistry, structures and geophysics in a three-dimensional interpretation of Montauban.

Gold and silver doré purchase agreement
What it means

A contract setting out the terms under which a buyer will purchase gold and silver doré from a producer.

In ESGold’s disclosures

The May agreement provides for Ocean Partners to buy future gold and silver doré produced from the specified Montauban material.

Source (1)
Company disclosure
Gravity separation
What it means

A mineral-processing method that separates particles mainly according to differences in density.

In ESGold’s disclosures

ESGold describes its Falcon unit as using enhanced gravity to separate heavier particles and recover precious metals.

Historical estimate
What it means

An estimate prepared before a company acquired, or agreed to acquire, the property and not verified as current.

In ESGold’s disclosures

ESGold says a Qualified Person has not completed sufficient work to classify the historical bedrock estimates as current mineral resources or reserves.

Host-rock interval
What it means

A measured section of drill core containing the rock that hosts, or may host, mineralization.

In ESGold’s disclosures

A length of host rock identified in the drill log. For MM-26-11, ESGold distinguishes a broader host interval from narrow sulphide bands within it.

Indicated mineral resource
What it means

A mineral resource estimated with enough geological confidence to support mine planning and evaluation of economic viability.

In ESGold’s disclosures

The 2025 PEA’s Table 14-7 classifies 603,700 tonnes of tailings as Indicated. It reports the corresponding grades and recoverable ounces separately.

Source (1)
Company disclosure
Inferred mineral resource
What it means

A mineral resource based on limited geological evidence and sampling, with lower confidence than an Indicated or Measured resource.

In ESGold’s disclosures

Table 14-7 classifies 319,300 tonnes of tailings as Inferred.[1] The PEA is preliminary and includes inferred resources.[1][2]

IRR — internal rate of return
What it means

The discount rate at which the present value of an investment’s cash inflows equals its cash outflows.

In ESGold’s disclosures

The updated study reports internal rates of return of 105.1% before tax and 60.3% after tax in its modeled base case.

Material characterization
What it means

Testing and describing a material’s composition and properties to assess its behaviour or suitability for a proposed use.

In ESGold’s disclosures

The October 29 and November 3 MOUs describe characterization of the residue as a condition for definitive terms and potential aggregate deliveries.[1][2]

Merrill-Crowe process
What it means

A process that recovers dissolved gold and silver by adding zinc to a clarified, deoxygenated cyanide solution.

In ESGold’s disclosures

ESGold selected this recovery process after metallurgical tests.[1] Its September flowsheet includes clarification, deoxygenation and Merrill–Crowe precipitation.[2]

Metres drilled
What it means

A measure of drilling activity: the combined length of holes drilled, expressed in metres.

In ESGold’s disclosures

ESGold reported approximately 4,074 metres of drilling, more than 80% of its planned 5,000 metres, subject to final reconciliation.

Mica
What it means

A group of layered silicate minerals that can split into thin sheets or flakes.

In ESGold’s disclosures

The PEA describes separation tests on Montauban mica and assumes bulk concentrate sales in the study model.[1][2]

Sources (2)
Company disclosures
Mineral claim
What it means

A mineral exploration right over a defined area; it does not by itself authorize commercial mining.

In ESGold’s disclosures

The July agreements concern 44 claims covering approximately 2,448 hectares near Montauban.[1] The company later reported delivering the consideration.[2]

Mineral reserve
What it means

The economically mineable part of a Measured or Indicated resource, supported by studies of technical, economic and other relevant factors.

In ESGold’s disclosures

Section 15 of the 2025 technical report states that no current mineral reserves had been estimated for the project.

Mineral resource
What it means

Mineral material with reasonable prospects for eventual economic extraction, supported by geological evidence and sampling.

In ESGold’s disclosures

Table 14-7 gives the technical report’s tailings estimate by Indicated and Inferred category.[1] ESGold describes the historical bedrock estimates separately.[2]

Mineralization
What it means

The occurrence of minerals of potential economic interest in rock or other material; it does not establish economic viability.

In ESGold’s disclosures

ESGold reports visual observations of sulphides in core. It says laboratory assays are required to determine metal grades.

Neutralized mining residue
What it means

Material remaining after processing that has been treated to reduce acidity or alkalinity; suitability for reuse still requires assessment.

In ESGold’s disclosures

ESGold describes plans to neutralize and stabilize remaining material following metal recovery, and to evaluate potential reuse.[1][2]

Non-binding memorandum of understanding (MOU)
What it means

A document recording the parties’ intentions to explore an arrangement without committing them to the proposed commercial transaction.

In ESGold’s disclosures

ESGold announced a second non-binding MOU with Gestion D.S. 50 Inc. for up to 200,000 metric tonnes annually.[2] Together with Culture H. Dolbec Inc.’s October 29 MOU for up to 300,000, the proposed combined supply is up to 500,000 metric tonnes annually.[1][2] Future supply requires material characterization, environmental testing, applicable regulatory approvals and definitive agreements.[1][2] These volumes are indicative maximums, not guaranteed deliveries, purchases or minimum commitments.[2] Pricing and other commercial terms remain unset.[2]

NPV — net present value
What it means

The present value of expected cash inflows minus cash outflows, including the initial investment, using a chosen discount rate.

In ESGold’s disclosures

At a 5% discount rate, the updated PEA reports modeled net present values of C$44.53 million before tax and C$24.27 million after tax.

Operating cash flow
What it means

Net cash generated or used by a company’s operating activities during a period.

In ESGold’s disclosures

ESGold’s cash-flow statement reports C$2,411,230 used in consolidated operating activities in the year ended June 30, 2026.

PEA — preliminary economic assessment
What it means

An early study of a mineral project’s potential economic viability, less advanced than a pre-feasibility or feasibility study.

In ESGold’s disclosures

The preliminary economic assessment models the tailings project and includes inferred resources.[1][2] ESGold cautions that its projected results are uncertain.[2]

QA/QC — quality assurance and quality control
What it means

Procedures used to prevent, detect and correct errors so that sampling, testing and reported data are reliable.

In ESGold’s disclosures

ESGold said that assay results would undergo review and validation under its quality assurance and quality control procedures before publication.

Source (1)
Company disclosure
Qualified Person
What it means

A geoscientist or engineer whose qualifications, relevant experience and professional membership meet NI 43-101 requirements.

In ESGold’s disclosures

ESGold identifies the Qualified Person supervising the announced core workflow and the technical review required before results are released.

Quartz-carbonate vein
What it means

A fracture or opening in rock filled mainly with quartz and carbonate minerals.

In ESGold’s disclosures

ESGold reported quartz-carbonate veins in selected drill core. Its October release gives their locations and describes visible minerals.

Recovery
What it means

The proportion of a valuable metal or mineral in the feed that a processing operation captures in its product.

In ESGold’s disclosures

ESGold’s Falcon concentrator is intended to recover liberated precious metals.[1] The PEA uses specified metal-recovery assumptions for its estimate.[2]

Sources (2)
Company disclosures
Recovery assumption
What it means

An estimated recovery percentage used in a study or calculation, rather than a measured operating result.

In ESGold’s disclosures

The technical report applies 89.3% for gold and 77.0% for silver to the recoverable-metal figures in Table 14-7.

Source (1)
Company disclosure
Revenue
What it means

Income recognized from ordinary business activities, such as product sales, before deducting related expenses.

In ESGold’s disclosures

The PEA models revenue using study inputs.[1] ESGold also described aggregate as a potential additional revenue source under the aggregate MOUs.[2][3] These volumes are indicative maximums, not guaranteed deliveries, purchases or minimum commitments.[3] Pricing and other commercial terms remain unset.[3]

Royalty
What it means

A payment to a rights holder based on an agreed measure, such as production, sales proceeds or net smelter returns.

In ESGold’s disclosures

The PEA describes a 1% net smelter return royalty to the municipality.[1] ESGold reported no retained royalty in the July agreements for 44 claims.[2]

Sample submission
What it means

Sending identified samples to a laboratory for preparation and analysis.

In ESGold’s disclosures

ESGold reported submitting approximately 400 samples to SGS Laboratories by September 24.

Sulphide-bearing interval
What it means

A section of rock containing sulphide minerals, which combine sulphur with metals or other elements.

In ESGold’s disclosures

ESGold described visible sulphides in selected core intervals and said assays were needed to determine grades.

Tailings
What it means

Material remaining after ore has been processed to recover valuable minerals.

In ESGold’s disclosures

ESGold’s PEA models processing historical mine tailings at Montauban over four operating years.

Source (1)
Company disclosure
Thickener
What it means

Equipment that settles solids out of a slurry to produce a denser slurry and recover clarified water.

In ESGold’s disclosures

ESGold says the thickeners concentrate slurry and recover clarified water for reuse in the processing circuit.

Throughput
What it means

The quantity of material processed over a stated period, commonly expressed in tonnes per day.

In ESGold’s disclosures

ESGold describes the facility as designed around a permitted capacity of up to 1,000 tonnes of feed per day.

True width
What it means

The thickness of a geological feature measured perpendicular to its boundaries.

In ESGold’s disclosures

ESGold cautions that reported lengths along drill core may differ from the true widths of the geological features.

Unit operating cost
What it means

Operating cost expressed per unit of production or material processed, such as dollars per tonne.

In ESGold’s disclosures

The PEA models C$35.29 in total operating cost per tonne, in constant first-quarter 2023 Canadian dollars.

Visual geological observation
What it means

A description of rock or minerals based on their visible features; it does not establish an assay grade.

In ESGold’s disclosures

ESGold’s core descriptions and photographs record visible rock and minerals. ESGold says assays are required to determine grades.

Working capital
What it means

Current assets minus current liabilities: a measure of a company’s short-term financial position.

In ESGold’s disclosures

ESGold reported consolidated working capital of C$14,049,753 at June 30, 2026.[1][2]

Working capital facility
What it means

An arrangement allowing a company to borrow for operating needs, subject to agreed limits and conditions.

In ESGold’s disclosures

ESGold’s agreement with Ocean Partners provides for an optional facility of up to C$9 million in two conditional tranches.[1]

08 / SOURCE REGISTER

Company disclosures and references

Selected ESGold news releases, shareholder letters, presentations, technical reports and filings used on this page. Company news archive ↗ · Financial reports ↗

40 company source entries · 39 distinct documents · 12 definition references

About source dates, IDs and later disclosures

Source IDs identify documents, not project stages. The two May-presentation entries share one document ID. Dates below distinguish releases, report periods, authorization dates and effective dates. A later related disclosure does not replace every fact in an earlier document.

Browse company disclosures
  1. S39Regulatory filingCanadian Securities Exchange
    ESGold Form 5A Annual Listing Summary · Dated November 9, 2026 · CSE posting November 10, 2026Year ended June 30, 2026 · Select the November 10 Form 5A entry.
    CSE posting date November 10, 2026 · Report date: November 9, 2026

    Reporting period: year ended June 30, 2026.

    • PDF p. 2: shareholder-meeting information and year-end financial summary.
    • PDF pp. 4–5, Section 3: securities at the end of the reporting period.
    • PDF pp. 5–6, Section 5(a): land, infrastructure, engineering and preliminary construction-material concepts.
    • PDF p. 6, Section 5(b): four objectives, periods and estimated costs.
    • PDF pp. 6–7, Section 5(c): financial-resource cross-reference.
    • PDF p. 9: signature and report date.

    The November posting date does not update the measurement date of the financial or securities balances.

  2. S38News releaseESGold website
    ESGold Expands Historic Mine Waste Reclamation Strategy with Second MOU, Bringing Total Proposed Annual Aggregate Supply to 500,000 Tonnes (opens in a new tab)November 3, 2026 · Opening counterparty/volume paragraphs; annual permitted-processing paragraph; conditions and commercial terms; About ESGold.
    Release date November 3, 2026

    Related disclosure: October 29 first aggregate MOU

  3. S37Shareholder letterESGold website
    ESGold Corp. October 2026 Letter to Shareholders (opens in a new tab)November 2, 2026 · Reporting period: October 2026 · PDF p. 1: equipment/shipping and exploration recap. PDF p. 2: modular building, installation and integration. PDF p. 3: preparations, outreach and funding objective.
    Website posting date November 2, 2026 · Reporting period: October 2026

    Posting date confirmed by the ESGold investor-page letter listing; it is not the date of every reported activity.

    Related disclosure: October 20 drilling and equipment release

  4. S01News releaseESGold website
    Historic mine waste reclamation & non-binding aggregate MOU (opens in a new tab)October 29, 2026 · Opening MOU and volume paragraphs; non-binding terms and conditions; “Transforming a Century of Mining Waste into a Valuable Resource”
    Release date October 29, 2026
  5. S02News releaseESGold website
    Drilling progress, geological observations, model integration and equipment logistics (opens in a new tab)October 20, 2026 · Drilling and Equipment Highlights; Moving Beyond the Historic Mine; geological-observation table; model integration; equipment delivery update
    Release date October 20, 2026
  6. S03News releaseESGold website
    Drilling progress and sample submission (opens in a new tab)September 24, 2026 · Opening drilling and sample-submission paragraphs; highlights
    Release date September 24, 2026
  7. S04News releaseESGold website
    Expanded ANT/model and exploration planning (opens in a new tab)September 15, 2026 · Survey details, exploration planning phases and technical limitations
    Release date September 15, 2026
  8. S05News releaseESGold website
    Processing equipment and commissioning (opens in a new tab)September 10, 2026 · Equipment descriptions and plant-integration section
    Release date September 10, 2026
  9. S06News releaseESGold website
    Drilling commencement and analytical workflow (opens in a new tab)September 3, 2026 · Program description, objectives and analytical workflow
    Release date September 3, 2026
  10. S07News releaseESGold website
    Exploration authorization (opens in a new tab)July 28, 2026 · ATI — Authorization of Impact-Causing Exploration Work announcement and distinction between exploration and tailings permissions
    Release date July 28, 2026
  11. S08News releaseESGold website
    Equipment inspections and delivery expectations (opens in a new tab)July 21, 2026 · Equipment-update bullets and Figures 1–5
    Release date July 21, 2026
  12. S09News releaseESGold website
    Conditional claims agreements (opens in a new tab)July 14, 2026 · Acquisition description, transaction terms and closing conditions
    Release date July 14, 2026
  13. S10News releaseESGold website
    Operations Director appointment (opens in a new tab)June 17, 2026 · Appointment announcement and operations responsibilities
    Release date June 17, 2026
  14. S11News releaseESGold website
    Doré furnace delivery (opens in a new tab)June 11, 2026 · Opening furnace specifications and supporting-equipment paragraphs
    Release date June 11, 2026
  15. S12News releaseESGold website
    Ocean Partners agreement (opens in a new tab)May 26, 2026 · Purchase, payment and conditional funding terms
    Release date May 26, 2026
  16. S13PresentationESGold website
    Company presentation · slide 5: land position (opens in a new tab)May 2026 company presentation · Slide 5 · land position
    Presentation month May 2026
  17. S14News releaseESGold website
    Mill building completion (opens in a new tab)November 10, 2025 · Opening paragraphs · mill structure, gold room and laboratory
    Release date November 10, 2025
  18. S15News releaseESGold website
    Processing methodology (opens in a new tab)October 28, 2025 · Opening processing-route and metallurgical-testing paragraphs
    Release date October 28, 2025
  19. S16News releaseCSE-hosted company release
    Updated PEA results · September 4, 2025 (opens in a new tab)September 4, 2025 · economics, price assumptions and replacement of the 2023 PEA
    Release date September 4, 2025
  20. S17Technical reportESGold website
    2025 technical report and PEA (opens in a new tab)Effective July 21, 2025 · signed August 29, 2025 · Report cover; Sections 16 and 21.8; Table 14-12
    Report effective date July 21, 2025; signed August 29, 2025
  21. S18Financial statementsESGold website
    Consolidated interim financial statements · March 31, 2026 (opens in a new tab)Period ended March 31, 2026 · authorized / information through May 28, 2026 · PDF pp.3, 6–7; Notes 9 and 11
    Authorization date May 28, 2026; period ended March 31, 2026
  22. S19MD&AESGold website
    Management’s discussion and analysis · March 31, 2026 (opens in a new tab)Period ended March 31, 2026 · authorized / information through May 28, 2026 · Printed pp.6–8; liquidity and subsequent events
    Information / authorization date May 28, 2026; period ended March 31, 2026
  23. S20News releaseESGold website
    Initial ANT-based 3D model (opens in a new tab)February 3, 2026 · Initial model and conceptual limitations
    Release date February 3, 2026
  24. S21News releaseESGold website
    Additional claim staking (opens in a new tab)February 5, 2026 · 144 staked claims and land-position reference
    Release date February 5, 2026
  25. S22News releaseESGold website
    Expanded Phase 2 Ambient Noise Tomography (ANT-2) survey launch (opens in a new tab)Survey launch announced February 20, 2026 · fieldwork commenced February 17.
    Release date Survey launch announced February 20, 2026
  26. S23News releaseESGold website
    Parallel mill and exploration update (opens in a new tab)April 9, 2026 · Equipment fabrication and authorization submission at that date
    Release date April 9, 2026
  27. S24News releaseESGold website
    Initial additional-claims agreement (opens in a new tab)May 5, 2026 · Earlier purchase-agreement announcement; July terms are later
    Release date May 5, 2026
  28. S13PresentationESGold website
    Company presentation · infrastructure (opens in a new tab)May 12, 2026 · Slide 7 · infrastructure and construction status
    Presentation month May 2026

    Same document as S13; this entry retains another cited location. View the other S13 entry.

  29. S25News releaseESGold website
    Construction progress update (opens in a new tab)September 25, 2025 · Historical construction target; November completion is later
    Release date September 25, 2025
  30. S26News releaseESGold website
    Ocean Partners term sheet (opens in a new tab)October 2, 2025 · Earlier term sheet; May 2026 definitive agreement is later
    Release date October 2, 2025
  31. S27News releaseESGold website
    Partially completed 3D model (opens in a new tab)November 13, 2025 · Earlier model interpretation; superseded by 2026 updates
    Release date November 13, 2025
  32. S28News releaseESGold website
    Colombia tailings testing (opens in a new tab)October 14, 2025 · Separate company activity; outside the Montauban pathways
    Release date October 14, 2025
  33. S29News releaseESGold website
    Market-making services (opens in a new tab)May 25, 2026 · Corporate and market-communications context
    Release date May 25, 2026
  34. S30News releaseESGold website
    Investor-awareness services (opens in a new tab)September 1, 2026 · Corporate and market-communications context
    Release date September 1, 2026
  35. S31PresentationESGold website
    October 2026 investor presentation · October 2026 (opens in a new tab)October 2026 · land-position slide
    Presentation month October 2026
  36. S32MD&ACompany filing copy hosted by FinancialReports.eu
    Annual MD&A · Year ended June 30, 2026 · authorized October 22 (opens in a new tab)Year ended June 30, 2026 · October 22 annual MD&A · land position, liquidity and subsequent events
    Information / authorization date October 22, 2026; year ended June 30, 2026
  37. S33Financial statementsCompany filing copy hosted by FinancialReports.eu
    Audited consolidated financial statements · Year ended June 30, 2026 · authorized October 22 (opens in a new tab)Year ended June 30, 2026 · authorized October 22 · financial position, cash flows and Notes 9 and 17
    Authorization date October 22, 2026; year ended June 30, 2026
  38. S34Technical reportESGold website
    2023 technical report and PEA, superseded by 2025 report · 2023 PEA (opens in a new tab)2023 technical report · superseded PEA used solely for historical comparison
    Report year 2023; retained for historical comparison
  39. S35News releaseESGold website
    March 10, 2026 • LIFE financing closing · March 10, 2026 (opens in a new tab)March 10, 2026 · gross proceeds from the LIFE offering
    Release date March 10, 2026
  40. S36News releaseESGold website
    December 2025 • flow-through financing closing · December 2025 (opens in a new tab)December 2025 · flow-through financing proceeds and expenditure terms
    Release date December 9, 2025
Definition references used in the glossary

These references explain terminology. They are not ESGold disclosures or evidence that ESGold completed an activity.

  1. D01Definition referencewww.quebec.ca
    Québec · exploration authorization (opens in a new tab)Reference already used in the glossary; document date is not recorded in this register.
  2. D02Definition referencewww.seprosystems.com
    Sepro · mineral processing (opens in a new tab)Reference already used in the glossary; document date is not recorded in this register.
  3. D03Definition referencewww.canada.ca
    CRA · flow-through shares (opens in a new tab)Reference already used in the glossary; document date is not recorded in this register.
  4. D04Definition referencefree.bcpublications.ca
    NI 43-101 · definitions (opens in a new tab)Reference already used in the glossary; document date is not recorded in this register.
  5. D05Definition referencemrmr.cim.org
    CIM · resource and reserve definitions (opens in a new tab)Reference already used in the glossary; document date is not recorded in this register.
  6. D06Definition referencewww.bdc.ca
    BDC · internal rate of return (opens in a new tab)Reference already used in the glossary; document date is not recorded in this register.
  7. D07Definition referencenepis.epa.gov
    US EPA · gold and silver processing (opens in a new tab)Reference already used in the glossary; document date is not recorded in this register.
  8. D08Definition referencewww.usgs.gov
    USGS · mica (opens in a new tab)Reference already used in the glossary; document date is not recorded in this register.
  9. D09Definition referencewww.legisquebec.gouv.qc.ca
    Québec · Mining Act, sections 64 and 100 (opens in a new tab)Reference already used in the glossary; document date is not recorded in this register.
  10. D10Definition referencewww.bdc.ca
    BDC · net present value (opens in a new tab)Reference already used in the glossary; document date is not recorded in this register.
  11. D11Definition referencewww.ifrs.org
    IFRS · IAS 7, operating activities (opens in a new tab)Reference already used in the glossary; document date is not recorded in this register.
  12. D12Definition referencewww.bdc.ca
    BDC · working capital (opens in a new tab)Reference already used in the glossary; document date is not recorded in this register.

Back to top

GLOSSARY · IN CONTEXT

Close or press Escape to return to your place.

T$R Transparency & Conflicts

T$R’s Full Disclosure on ESGold

T$R Relationship

T$R’s ESGold content should not be treated as independent or unbiased.

T$R independently initiated ESGold coverage on 1 February 2022 without compensation to initiate it.

The ESGold Company Profile and ESGold Company Disclosure Pathways page are currently classified as No Direct Content Compensation: T$R receives no current direct compensation for those two pages. This classification does not establish independence or impartiality.

T$R’s historical compensation, continuing ESGold shareholding and the other interests and relationships disclosed below create financial interests, material conflicts of interest and potential bias.

D4, founder & owner of The Shareholder Report (T$R), also has a separate paid consulting relationship with ESGold. That compensation is not paid to T$R; the relationship and compensation are detailed below.

Coverage & Compensation

T$R independently initiated coverage of ESGold on 1 February 2022 and received no compensation to initiate that coverage. T$R remained uncompensated from 1 February 2022 until August 2024, a period of approximately 2.5 years.

Following T$R’s publication of a research report on 2 July 2024, ESGold compensated T$R in August 2024. On 23 August 2024, T$R—not D4 personally and not D4’s separate consulting business—received 250,000 ESGold common shares through Computershare’s Direct Registration System (DRS) in lieu of cash. T$R continues to hold those 250,000 shares.

In March 2025, T$R—not D4 personally and not D4’s separate consulting business—received C$50,000 before sales tax for creating and publishing ESGold research reports published on 8 March 2025 and 16 March 2025.

These payments compensated the identified research reports only. They were not compensation for initiating ESGold coverage and are not current direct compensation for either the ESGold Company Profile or the ESGold Company Disclosure Pathways page.

The compensated research reports should not be considered independent or unbiased. T$R’s historical compensation and continuing ownership of the 250,000 ESGold shares remain material conflicts of interest and potential sources of bias, including for ESGold content that currently receives no direct compensation.

Promotional Items

In July 2022, D4 personally received an ESGold-branded promotional hat from ESGold. The hat had nominal value and was not material.

The hat was received before D4’s separate consulting relationship with ESGold began in January 2026. It is disclosed for transparency and completeness despite its nominal value.

Ownership & Conflicts

T$R, D4 personally and D4’s spouse hold ESGold common shares. These are separate holdings and should not be treated as belonging to one recipient or account.

On 23 August 2024, T$R received 250,000 ESGold common shares as compensation in lieu of cash. T$R continues to hold all 250,000 of those shares. D4 also holds ESGold common shares personally. The financing purchases and warrant exercises listed below describe specific transactions; they do not state D4’s current total common-share holding.

The value of these holdings may increase or decrease with ESGold’s share price. T$R, D4 and D4’s spouse therefore have direct financial interests in ESGold’s market performance. These interests create material conflicts of interest and potential bias.

These conflicts remain relevant even when particular ESGold content is classified as No Direct Content Compensation. T$R’s and D4’s final editorial control does not eliminate the financial interests, material conflicts of interest or potential bias created by these holdings.

D4 Separate Consulting Relationship

D4 serves ESGold as Corporate Strategic Consultant / Strategic Corporate Business Advisor through D4’s separate sole-proprietor consulting business. The role focuses on strategic corporate and business advisory matters. The services began at the start of January 2026 and remain ongoing unless otherwise stated.

ESGold currently pays D4 C$5,000 per month plus applicable sales tax through the sole proprietorship for advisory services. The compensation is not paid to T$R and is not compensation for creating or publishing T$R content. D4 is the person behind both activities; the shared ownership and paid relationship create a material conflict of interest and potential bias for T$R’s ESGold coverage despite their separation.

Under the current consulting arrangement, D4’s role does not include investor relations, promotional activity, securities marketing, market-awareness activity, finder activity, capital-raising activity or services related to a distribution of securities, unless specifically agreed to in writing and properly disclosed in accordance with applicable requirements.

T$R is operated separately from D4’s consulting role with ESGold. The consulting arrangement does not engage T$R to perform those activities. Any separate engagement for those activities would require a specific written agreement and proper disclosure in accordance with applicable requirements.

D4’s previously disclosed finder’s fees and personal participation in ESGold financings occurred before the consulting relationship began. Those activities were undertaken by D4 personally—not through T$R or D4’s consulting business.

As of the date of this published disclosure, D4 has no non-disclosure agreement or other confidentiality agreement with ESGold and has not received or had access to material non-public information through the consulting or advisory role.

Options, Warrants & Other Instruments

Under an option agreement dated 4 May 2026, ESGold granted D4 125,000 stock options under ESGold’s Omnibus Incentive Plan at an exercise price of C$0.505 per share. D4 personally holds the options. They are a security-based incentive connected with D4’s separate consulting relationship, in addition to the monthly cash consulting fee, and are not compensation for creating or publishing T$R content.

The agreement provides for immediate vesting and exercisability, subject to the Plan and option agreement. Scheduled expiry is 4 May 2029, subject to the agreement’s earlier-expiry provisions, including those applicable when service ends. None have been exercised, and all 125,000 options remain outstanding as of the date of this published disclosure.

D4 personally—not T$R and not D4’s separate consulting business—also holds the following outstanding ESGold warrants:

  • 568,000 warrants at C$0.30 per share, expiring 11 April 2027, received in connection with the April 2025 finder’s fee.
  • 39,720 warrants at C$0.91 per share, expiring 25 December 2026, received in connection with the July 2025 finder’s fee.
  • 300,806 warrants at C$0.30 per share, expiring 11 April 2027, acquired through D4’s personal participation in the April 2025 financing.
  • 50,000 warrants at C$0.91 per share, expiring 25 December 2026, acquired through D4’s personal participation in the November 2025 financing.

All of these warrants were received before D4’s separate consulting relationship with ESGold began in January 2026.

For previously held ESGold warrants:

  • All 195,121 warrants received by D4 in October 2024 in connection with a finder’s fee were exercised on 16 September 2025 and are no longer outstanding warrants.
  • All 150,000 warrants acquired through D4’s personal participation in the July 2022 financing expired without being exercised and are no longer outstanding warrants.

D4’s ESGold options and warrants create direct financial interests, material conflicts of interest and potential bias.

Finder’s Fees

D4 personally performed finder activity and personally received the ESGold finder’s fees and warrants disclosed below. The finder activity was not conducted through T$R or D4’s separate consulting business. The fees and warrants were not compensation to T$R or compensation for T$R content.

All the finder activity described below occurred before D4’s separate consulting relationship with ESGold began in January 2026:

  • October 2024: In connection with a private placement that closed on 30 September 2024, D4 personally received a C$19,000 finder’s fee and 195,121 warrants exercisable at C$0.15 per share and expiring on 27 September 2025. D4 exercised all 195,121 warrants on 16 September 2025. Those warrants are no longer outstanding.
  • April 2025: In connection with a financing that closed on 16 April 2025, D4 personally received finder’s fees of C$99,534.60 plus US$12,600 and 568,000 warrants exercisable at C$0.30 per share and expiring on 11 April 2027. All 568,000 warrants remain outstanding as of the date of this published disclosure.
  • July 2025: In connection with a private placement that closed on 25 June 2025, D4 personally received a C$28,995.37 finder’s fee and 39,720 warrants exercisable at C$0.91 per share and expiring on 25 December 2026. All 39,720 warrants remain outstanding as of the date of this published disclosure.

D4’s historical receipt of finder’s fees, the exercised warrants and the outstanding warrants create financial interests, material conflicts of interest and potential bias.

D4 Personal Financing Participation

D4 personally participated in the ESGold financings disclosed below using personal capital. The financings were not undertaken through T$R or D4’s separate consulting business. The securities were purchased as personal investments and were not compensation to T$R or compensation for T$R content.

All the financing participation described below occurred before D4’s separate consulting relationship with ESGold began in January 2026:

  • July 2022: D4 personally acquired 300,000 ESGold common shares at a purchase price of C$0.05 per share and 150,000 warrants exercisable at C$0.10 per share. All 150,000 warrants expired without being exercised and are no longer outstanding.
  • April 2025: D4 personally acquired 300,806 ESGold common shares at a purchase price of C$0.215 per share and 300,806 warrants exercisable at C$0.30 per share and expiring on 11 April 2027. All 300,806 warrants remain outstanding as of the date of this published disclosure.
  • November 2025: D4 personally acquired 50,000 ESGold common shares at a purchase price of C$0.73 per share and 50,000 warrants exercisable at C$0.91 per share and expiring on 25 December 2026. All 50,000 warrants remain outstanding as of the date of this published disclosure.

D4’s personal financing participation, acquired shares and outstanding warrants create direct financial interests, material conflicts of interest and potential bias.

Editorial Control & Ongoing Conflicts

T$R’s ESGold content should not be treated as independent or unbiased.

T$R’s historical compensation and continuing ESGold shareholding; D4’s and D4’s spouse’s holdings; and D4’s significant personal investment, options, warrants, prior finder’s fees, personal financing participation and ongoing paid consulting relationship create financial interests, material conflicts of interest and potential bias.

D4 receives monthly consulting compensation for advisory services through a business operated separately from T$R. These payments are not for T$R content. D4 is the person behind both activities, so their separation does not remove the material conflict or potential bias.

The No Direct Content Compensation classifications apply only to current direct compensation for the ESGold Company Profile and Company Disclosure Pathways page. They do not remove the historical compensation, securities ownership, consulting relationship or other disclosed financial interests.

T$R and D4 retain final editorial control over T$R research, analysis, opinions, wording, conclusions, publication timing and whether coverage continues. Any ESGold factual review is limited to identifying possible errors; ESGold has no editorial approval and cannot control, edit or veto T$R’s analysis, opinions or conclusions. Editorial control does not eliminate the disclosed conflicts or potential bias.

Unless expressly stated otherwise, T$R, D4 and D4’s spouse may acquire, hold or sell ESGold securities without advance notice, subject to applicable law. D4 may exercise, hold or allow options and warrants to expire. The consulting or advisory relationship may continue, change or end.

Conflicts may continue after compensation or consulting ends if securities or other financial interests remain. The disclosed facts and relationships may change; material changes will be disclosed where reasonably practicable.

Additional Disclosure & Currency

To the best of D4’s knowledge as of the date of this published disclosure, no other current material ESGold holding, payment, compensation, security or instrument, service, benefit, agreement, relationship or conflict involving T$R, D4 personally, D4’s spouse or D4’s separate sole-proprietor consulting business exists beyond the facts disclosed in these categories.

This Full Disclosure should be read together with the ESGold Summary Disclosure, the applicable ESGold Company Profile, the ESGold Company Disclosure Pathways page, any disclosure presented with a specific T$R article, post or other content, and T$R’s central general Disclosures page.

The Summary Disclosure provides a shorter overview and does not replace this Full Disclosure. A content-specific disclosure also does not replace this Full Disclosure.

The facts, holdings, compensation arrangements and relationships described here may change. Material changes will be reflected in the current published disclosure where reasonably practicable. Readers should rely on the current published version rather than an earlier version or an unpublished draft.

View General T$R Disclosures