Skip to main content

GENERAL INFORMATION, ANALYSIS & OPINION. NO PERSONALIZED INVESTMENT ADVICE OR SUITABILITY ASSESSMENT.

Disclaimer Disclosures

Important Information

Welcome to T$R’s New Website

Thank you for exploring T$R’s new website! There’s more to come! Doubleview Gold’s profile will be added soon! Stay tuned!

AI-generated depiction of ESGold's  Montauban's mill and tailings · Not an actual photograph

AI-generated depiction of ESGold’s mill and tailings ·
Not an actual photograph

Last Updated — 2026-11-16

ESGold

CSE: ESAUOTCQB: ESAUFFSE: Z7D

Montauban Gold-Silver Project Montauban Township, Québec, Canada
Approx. 80 km from Québec City & 60 km from Trois-Rivières

Project Stage:
  • Permitted pre-production; installation, commissioning & drilling underway.
  • ESGold reports funding through first doré; production and revenue pending.

What Changed

Latest Updates

  1. New operating targets & cost estimates

    Added ESGold’s Form 5A timelines and estimated costs for mill completion, tailings processing, exploration and aggregate testing. Updated related project details, pending catalysts and sources. These are company targets, not completed milestones.

Company Profile

Company Overview

  • ESGold Corp. is advancing its 100%-owned Montauban Gold-Silver Project in Québec through two parallel lines of work: developing a tailings-reprocessing operation and exploring historical hard-rock mineralization across the broader district.
  • The planned operation would recover gold, silver and mica from historic mine tailings while stabilizing and neutralizing the processed material. ESGold reports that Montauban is permitted and funded through first doré. The main mill building, laboratory and gold room are complete, and the facility is designed for approximately 1,000 tonnes per day. Equipment installation and commissioning are underway; first production and revenue remain pending.
  • In its Form 5A dated November 9, 2026 and posted by the CSE on November 10, ESGold targeted mill completion and the start of historic-tailings processing within the next six months, with processing to follow mill completion and commissioning. It estimated C$2.5 million for remaining mill work and C$750,000 in processing start-up costs. These are company targets and estimates, not completed milestones. The filing also sets a twelve-month objective for continued drilling and evaluation.
  • Montauban is a historic zinc, lead, gold and silver mining district. A historical surface-pillar hard-rock evaluation reported 388,973 tonnes containing approximately 47,198 ounces of gold and 480,998 ounces of silver. This estimate is historical and non-current under NI 43-101, separate from the tailings resource, and is not a current mineral resource or reserve.
  • The expanded ANT survey and updated geological model announced in September 2026 cover approximately 70 km² and support exploration targeting beyond the historic mine. An earlier interpretation outlined a corridor approximately 900 metres vertically and more than two kilometres along strike. These are geological interpretations, not demonstrated mineral resources or proof of mineralized continuity.
  • Drilling is testing historical mineralization and potential extensions. If it supports a current hard-rock resource and subsequent technical and economic studies support development, hard-rock operations could potentially extend activity beyond the PEA’s projected four-year tailings plan. No extended operating life has been established.

At a glance

Company & Project Snapshot

Project Details

Project
  • Montauban Gold-Silver Project
Project History
  • 1913–1944: Zinc, lead, gold & silver mined.
  • 1948–1955: Zinc, lead, gold & silver mined.
  • 1983–1990: Gold & silver mined.
  • ESGold acquired Montauban in 2021; tailings PEA updated in 2025.
Location
  • Montauban Township, Québec, Canada
  • Approx. 80 km from Québec City & 60 km from Trois-Rivières
Commodities
  • Gold
  • Silver
  • Mica
Stage
  • Permitted pre-production; installation, commissioning & drilling underway.
  • ESGold reports funding through first doré; production and revenue pending.

Market Data

Share Price

C$0.375

As of 14 November 2026. Dated reference, not a live quote.

Source (1)

Market Cap

~C$41.91M

Actual shares and market cap may differ.

Reference price as of 14 November 2026

Options outstanding
Total outstanding:
5,294,000
Outstanding breakdown
AmountExercise
price
Expiry
date
184,000C$0.4714 May 2027
330,000C$0.5030 May 2027
100,000C$0.5014 Jun 2027
150,000C$1.249 Jul 2027
25,000C$0.8513 Sep 2027
80,000C$0.7017 Jan 2028
1,275,000C$0.5054 May 2029
1,850,000C$1.3616 Jul 2030
1,300,000C$0.5054 May 2031
Applicable date: October 22, 2026
Source (1)
Source
ESGold annual MD&A — year ended June 30, 2026; dated October 22, 2026  (opens in a new tab) Location: PDF p. 12, opening paragraph under “Outstanding Share Data”: stock options outstanding as of the MD&A date.
Warrants outstanding
Total outstanding:
37,840,917
Outstanding breakdown
AmountExercise
price
Expiry
date
5,226,379C$0.9125 Dec 2026
15,394,041C$0.3011 Apr 2027
11,281,157C$1.1018 Sep 2028
5,939,340C$1.0010 Mar 2029
Applicable date: October 22, 2026
Source (1)
Source
ESGold annual MD&A — year ended June 30, 2026; dated October 22, 2026  (opens in a new tab) Location: PDF p. 12, opening paragraph under “Outstanding Share Data”: share purchase warrants outstanding as of the MD&A date.
Basic Shares
Total outstanding:
111,774,201
Applicable date: October 22, 2026
Source (1)
Source
ESGold annual MD&A — year ended June 30, 2026; dated October 22, 2026  (opens in a new tab) Location: PDF p. 12, opening paragraph continuing “Outstanding Share Data” from p. 11; p. 1 identifies the MD&A date as October 22, 2026.
Fully Diluted Shares
Total outstanding:
155,088,061
(Issuer investor-page figure accessed November 19, 2026. The issuer does not state an effective date, and this total is not reconciled to the October 22, 2026 filed basic-share, option and warrant counts.)
Applicable date: September 2026
Sources (2)
Sources
ESGold investor page — accessed 19 Nov 2026  (opens in a new tab) Location: Printed slide 4 / PDF p. 5, “Capital Structure”; labelled “As of Sept 2026”.
ESGold annual MD&A — year ended June 30, 2026; dated October 22, 2026  (opens in a new tab) Location: PDF p. 12, opening paragraph under “Outstanding Share Data”: newer basic shares, warrants & options; no reconciled fully diluted total.
Shareholder composition
  • Friends & Affiliates: 30%
  • Family Offices: 25%
  • Management: 8%
  • Institutional: 7%
  • Public Float: 30%
Applicable date: September 2026
Source (1)
Source
ESGold investor presentation — October 12, 2026  (opens in a new tab) Location: Printed slide 4 / PDF p. 5, ownership doughnut chart & colour legend. The slide is labelled “As of Sept 2026”.
Cash position
  • C$16,212,859
Applicable date: June 30, 2026
Source (1)
Source
ESGold audited annual financial statements — June 30, 2026  (opens in a new tab) Location: Printed p. 5 / PDF p. 5, Consolidated Statements of Financial Position, “Cash and cash equivalents”, June 30, 2026 column.
Financial Context
  • June 30, 2026: approx. C$14.05M working capital & C$2.87M current liabilities; no operating revenue.
  • Going-concern uncertainty remains; tax/indemnity provision: approx. C$1.38M.
  • Of the original C$4.505M flow-through commitment, C$4,255,928 remained unspent at June 30; eligible spending is due December 31, 2026.
  • These are dated balances & commitments, not current unrestricted cash or remaining construction funding.
Applicable date: June 30, 2026
Sources (2)
Sources
ESGold audited annual financial statements — June 30, 2026  (opens in a new tab) Location: Printed/PDF p. 5: provision & current liabilities; p. 9, Note 1: going concern; p. 25, Note 12 “Commitments”: spending deadline & unspent funds; p. 27, Note 15: working capital.
ESGold annual MD&A — year ended June 30, 2026; dated October 22, 2026  (opens in a new tab) Location: PDF p. 6, “Financial”: working capital & current liabilities; p. 7: no operating cash flow or operating revenue at June 30, 2026.
Debt position
  • June 30, 2026: C$0 loans; approx. C$3.32M total liabilities.
  • Ocean Partners facility: C$0 drawn at that date; later borrowing unconfirmed.
Applicable date: June 30, 2026
Source (1)
Source
ESGold audited annual financial statements — June 30, 2026  (opens in a new tab) Location: Printed/PDF p. 5, financial-position statement: “Loans payable” & total liabilities; p. 19, Note 9 “Credit Facility”: nil drawdown at June 30, 2026.

Additional Company Information

Mining Jurisdiction
  • Québec, Canada
Headquarters
  • Vancouver, British Columbia, Canada
Sector
  • Mining
Industry
  • Gold & silver mining
  • Tailings reprocessing & mineral exploration
Projects
  • Principal development project: 100%-owned Montauban Gold-Silver Project, Québec.
  • Other assets & opportunities are summarized in Additional Information.

Company context

Additional Information

Historical Operations

  • ESGold’s presentation records production during 1913–1944, 1948–1955 & 1983–1990: approx. 149,429 oz gold, 6.97M oz silver, 116,600 tons zinc & 39,600 tons lead. “Tons” is the presentation’s unit for zinc & lead. These are past production figures, not remaining resources.
Source (1)
Source
ESGold investor presentation — October 12, 2026  (opens in a new tab) Location: Printed slide 8 / PDF p. 9, “Montauban Mine Past Production”; totals combine the 3 production-period columns.

Management and Technical Leadership

  • Gordon Robb: CEO & director; Paul Mastantuono: COO & director; Jason Tong: CFO; Pierre-Marc Gagnon, P.Eng.: Operations Director. Peter Espig & André Gauthier are also directors.
  • Edmond St-Jean is Engineering Consultant; Claude Duplessis, P.Eng., is identified as an independent Qualified Person.
  • Merouane Rachidi, Ph.D., P.Geo., approved the October 20, 2026 exploration release as independent Qualified Person. André Gauthier approved the annual MD&A’s technical disclosure as a Qualified Person; as a director, he is not independent.
Sources (3)
Sources
ESGold management & technical team  (opens in a new tab) Location: “Leadership Team / Experienced Team”: individual names & role headings.
ESGold Surpasses 4,000 Metres Drilled at Montauban, Expanding Drilling Beyond the Historic Mine — October 20, 2026  (opens in a new tab) Location: “Qualified Person”, sole paragraph.
ESGold annual MD&A — year ended June 30, 2026; dated October 22, 2026  (opens in a new tab) Location: PDF p. 3, “Qualified Person”, opening paragraph.

Ocean Partners Agreement

  • Announced May 26, 2026, the definitive agreement covers 100% of Montauban gold & silver doré from tailings & potential crown-pillar material.
  • Pricing follows prevailing LBMA or COMEX prices. Ocean Partners pays for 99.8% of contained gold & 99% of contained silver, less refining charges of US$0.80 per payable gold oz & US$0.50 per payable silver oz. Ocean Partners handles collection from the mine.
  • Up to 90% of estimated shipment value is provisionally payable within 1 business day after required documents are accepted. Final settlement follows confirmed weights & assays.
  • The optional C$9M working-capital facility has 2 conditional tranches: C$3M available no earlier than 3 months before anticipated Phase 1 production, and C$6M no earlier than 5 months before anticipated Phase 2 production. Access remains subject to Ocean Partners’ satisfaction & applicable conditions.
  • Each drawn tranche carries a 1% arrangement fee & annual interest at 3-month Term SOFR + 7%; overdue amounts carry SOFR + 11%. Repayment may use doré deliveries, cash or both. Early repayment carries a 1% fee.
  • The annual financial statements report C$0 drawn at June 30, 2026. That dated balance does not establish whether later borrowing occurred.
  • Minimum contractual deliveries total 50,000 oz gold & 1M oz silver. These commitments are not mineral resources, reserves or confirmed production. Actual shipments & revenue remain separate milestones.
Sources (2)
Sources
ESGold Signs Definitive Gold and Silver Doré Purchase Agreement with Ocean Partners — May 26, 2026  (opens in a new tab) Location: “Strengthening the Path Toward Production”: purchase coverage, pricing, collection, financing & settlement terms.
ESGold audited annual financial statements — June 30, 2026  (opens in a new tab) Location: Printed p. 19 / PDF p. 19, Note 9 “Credit Facility”: execution date, tranche conditions & nil drawdown at June 30, 2026.

Other Assets and Opportunities

  • Montauban remains ESGold’s principal development project. Eagle River’s carrying value was written down to nil in June 2025.
  • After further assessment, ESGold decided not to fund the proposed entity with Planta Magdalena & did not proceed with the Colombia MOU. This was reported in the October 22, 2026 annual filings; it should no longer be presented as an active development opportunity.
Source (1)
Source
ESGold annual MD&A — year ended June 30, 2026; dated October 22, 2026  (opens in a new tab) Location: PDF p. 6: end of “Eagle River property, Quebec” & “Other Properties”; p. 15, final subsequent-event paragraph on Planta Magdalena.

Capital-Structure and Market-Data Basis

  • The basic-share, option & warrant cards use the annual MD&A dated October 22, 2026, superseding the presentation’s September counts.
  • The fully diluted card uses the issuer investor page’s corrected total of 155,088,061. That figure equals the page’s listed 111,521,090 basic shares, 38,072,971 warrants and 5,494,000 options. The investor page does not state an effective date, and these figures remain different from the October 22, 2026 filed basic-share, option and warrant counts. The newer filed counts have not been reconciled to a current issuer-confirmed fully diluted total.
  • Shareholder composition remains the presentation’s September estimate. Market cap uses the separately dated saved price & basic-share count; it is a reference calculation, not a live quote. Cash & liabilities retain their financial-statement date.
  • The November 9 Form 5A’s securities table is expressly for the end of the reporting period, June 30, 2026. It lists 110,942,201 common shares and 1,025,000 RSUs outstanding at that year-end. Its later filing date does not make those balances current November counts. The profile therefore retains the explicitly dated October 22 MD&A counts for basic shares, options and warrants; it does not combine the June 30 RSUs with October 22 instruments to create an issuer-confirmed fully diluted total.
Sources (4)
Sources
ESGold investor presentation — October 12, 2026  (opens in a new tab) Location: Printed slide 4 / PDF p. 5, “Capital Structure”, including “As of Sept 2026”.
ESGold audited annual financial statements — June 30, 2026  (opens in a new tab) Location: Printed/PDF pp. 19–24, Note 10 “Share Capital and Reserves”, including restricted share units.
ESGold annual MD&A — year ended June 30, 2026; dated October 22, 2026  (opens in a new tab) Location: PDF p. 1: MD&A information date; p. 12: “Outstanding Share Data”.
ESGold Form 5A Annual Listing Summary — year ended June 30, 2026; dated November 9, 2026; published November 10, 2026  (opens in a new tab) Location: Section 3, PDF pp. 4–5: securities issued and outstanding at the end of the reporting period. Common shares appear on p. 4; restricted share units appear on p. 5.

Tax Losses & Potential Tax Benefits

  • At June 30, 2026, ESGold reported C$28.408M in non-capital tax loss carry forwards, expiring between 2027 & 2046. The financial statements identify approx. C$7.67M in related deferred tax assets that have not been recognized on the balance sheet. These tax attributes remain subject to review & potential adjustment by tax authorities.
Source (1)
Source
ESGold audited annual financial statements — June 30, 2026  (opens in a new tab) Location: PDF p. 26, Note 14 “Income Taxes”—unrecognized deferred tax assets & non-capital loss carryforwards tables.

Aggregate Reuse Opportunity

  • Two non-binding MOUs cover potential reuse of neutralized Montauban residue as construction aggregate:

Culture H. Dolbec Inc.: up to 300,000 tonnes annually; announced October 29, 2026.

Gestion D.S. 50 Inc.: up to 200,000 tonnes annually; announced November 3, 2026.

  • Combined indicative maximum: 500,000 tonnes annually, without guaranteed purchases or deliveries.
  • Supply depends on material characterization, environmental testing, applicable approvals and definitive agreements. Pricing and other commercial terms remain unsettled.
  • Montauban’s current tailings-processing permit covers 300,000 tonnes annually. Increasing that limit requires additional permits.
  • The November 9 Form 5A targets preliminary testing and evaluation of processed tailings for potential aggregate use within the next twelve months, at an estimated cost of C$200,000. ESGold describes the initiative as exploratory and still at the MOU stage.
  • The filing also describes preliminary evaluation of using polymers to bind processed tailings into construction products, including bricks, cinder blocks, paving stones, patio tiles, parking columns and highway Jersey barriers. These are potential applications under review, not qualified products, approved uses or confirmed sales.
Sources (3)
Sources
ESGold Advances Historic Mine Waste Reclamation with MOU for Up to 300,000 Tonnes of Aggregate Annually — October 29, 2026  (opens in a new tab) Location: Opening 4 paragraphs before “Transforming a Century of Mining Waste into a Valuable Resource” — counterparty, potential annual volume, intended use, non-binding status, conditions & absence of pricing or minimum purchase commitments.
ESGold second aggregate MOU — November 3, 2026  (opens in a new tab) Location: Opening paragraphs; non-binding terms following the CEO’s comments.
ESGold Form 5A Annual Listing Summary — year ended June 30, 2026; dated November 9, 2026; published November 10, 2026  (opens in a new tab) Location: Section 5(a), PDF p. 6: preliminary evaluation of polymer-bound construction products. Section 5(b), PDF p. 6: twelve-month construction-material evaluation objective, estimated C$200,000 cost and exploratory/MOU-stage status.

Forward Operating & Exploration Objectives

ESGold’s Form 5A dated November 9, 2026 and posted by the CSE on November 10 identifies four forward objectives:

  • Mill completion: remaining equipment installation, testing and commissioning within the next six months; estimated cost C$2.5 million.
  • Historic-tailings processing: commencement within the next six months, following mill completion and commissioning; estimated start-up cost C$750,000.
  • Exploration: continued drilling and evaluation of recent drilling and other exploration work within the next twelve months; estimated cost C$3.1 million.
  • Construction-material evaluation: preliminary testing and evaluation of processed tailings for aggregate use within the next twelve months; estimated cost C$200,000. The initiative remains exploratory and at the MOU stage.

The four estimates add to C$6.55 million. This is T$R’s arithmetic total of the stated milestone estimates, not a separately reported funding shortfall, cash balance or complete corporate budget. The mill and processing estimates together add to C$3.25 million; they are not an updated PEA capital total.

The filing does not reconcile these estimates to current cash, unpaid commitments, contingency or funding sources. The periods and costs are forward-looking estimates, not guarantees of completion.

Source (1)
Source
ESGold Form 5A Annual Listing Summary — year ended June 30, 2026; dated November 9, 2026; published November 10, 2026  (opens in a new tab) Location: Section 5(b), PDF p. 6: all four objectives, stated periods and estimated costs. Section 5(c), PDF pp. 6–7: the funds-available response refers to the attached annual financial statements and MD&A.

Expanded Montauban Land Position

  • On November 18, 2026, ESGold announced that it had staked 41 additional mining claims covering approximately 2,224 hectares during November 2026. Subject to final verification of the company’s claim registry, ESGold reported an expanded Montauban land position of approximately 541 claims covering 26,787 hectares, or approximately 268 km².
  • The release does not provide a final registration date or reconcile the new 541-claim total with the previously reported 485 claims; adding the 41 newly announced claims to 485 produces 526 rather than 541. The new total should therefore remain qualified as approximate and subject to registry verification.
  • The additional land does not establish mineralization, a mineral resource or a reserve.
Source (1)

Project information

Mining & Technical Information

Ownership & Royalties

  • ESGold reports 100% ownership of Montauban.
  • On November 18, 2026, ESGold announced staking 41 additional mining claims covering approximately 2,224 hectares. Subject to final claim-registry verification, the company reported an expanded total of approximately 541 claims covering 26,787 hectares, or approximately 268 km².
  • The November release does not reconcile the new 541-claim total with the previously reported 485 claims. Because 485 plus 41 equals 526, the new total should remain identified as approximate and subject to verification.
  • A 0.5% NSR applies to five specified claims.
  • Separate municipal rent from operations consists of a 1% NSR, with a monthly minimum of C$6,000 below 180,000 tonnes processed annually or C$8,000 above that level.
  • The July 2026 agreements for 44 additional claims specify no retained royalty. Those purchased claims are distinct from the 41 claims announced as newly staked in November.
  • These interests have different scopes and should not be presented as a property-wide 1.5% royalty.
Sources (4)
Sources
ESGold 2025 Montauban Technical Report  (opens in a new tab) Location: Printed p. 29 / PDF p. 46, §4.5 “Mineral Royalties”: 0.5% NSR on claims 2456371–2456375; separate municipal 1% NSR additional rent and C$6,000/C$8,000 monthly minimums.
ESGold Executes Definitive Agreement to Acquire Strategic Montauban Claims — July 14, 2026  (opens in a new tab) Location: Opening paragraph and “Transaction Details”: two agreements covering 44 claims; 100% acquisition basis with no retained royalty.
ESGold Receives Exploration Authorization from Québec Government — July 28, 2026  (opens in a new tab) Location: Opening paragraph: issuer describes Montauban as its 100%-owned project.
ESGold strategic claim-staking release — November 18, 2026  (opens in a new tab)

Mineral resources

Tailings MRE effective Mar. 2, 2023; included in the 2025 PEA:

  • Indicated: 603,700 t @ 0.40 g/t Au & 31.45 g/t Ag; approx. 7,800 oz Au & 610,350 oz Ag contained
  • Inferred: 319,300 t @ 0.41 g/t Au & 36.93 g/t Ag; approx. 4,200 oz Au & 379,100 oz Ag contained
  • Gold/silver tailings total: 923,000 t; Indicated & Inferred remain separate
  • Inferred mica: approx. 57,200 t within 714,800 t of tailings averaging 8% mica. This overlaps the tailings inventory; do not add it to the 923,000 t
  • Smaller “recoverable” ounce figures apply modelled recoveries; they are not additional resources

Resources are not reserves & do not have demonstrated economic viability.

Source (1)
Source
ESGold 2025 Montauban Technical Report  (opens in a new tab) Location: Printed pp. 4–5 / PDF pp. 21–22, Tables 1-1 and 1-2; printed pp. 148–150 / PDF pp. 165–167, §14.9.3 and Tables 14-7 and 14-8. These distinguish Indicated and Inferred tonnes, grades and contained ounces; identify recovery-adjusted ounces and the overlapping mica estimate; and state that resources are not reserves.

PEA

2025 tailings PEA — announced September 4, 2025; effective July 21, 2025:

  • Replaces ESGold’s 2023 PEA.
  • 4-year model; 1,000 t/day design; 270 operating days/year assumed.
  • Modelled life-of-mine revenue: C$103.73M.
  • CapEx: C$18.81M, including contingency, owner & EPCM costs; initial direct CapEx: C$17.44M.
  • The technical report separately estimates approx. C$2.13M in required working capital that should be added to the required capital.
  • Life-of-mine OpEx: approx. C$32.57M, or C$35.29/t.
  • After-tax: C$24.27M NPV (5%) & 60.3% IRR.
  • Pre-tax: C$44.53M NPV (5%) & 105.1% IRR.
  • Modelled payback: under 2 years.
  • Assumptions: US$2,900/oz Au, US$31.72/oz Ag, US$300/t mica & US$1 = C$1.45.

Preliminary assessment includes Inferred resources. Resources are not reserves; projected results are not guaranteed.

Principal reference: ESGold’s September 4, 2025 updated-PEA release. Capital and working-capital details were checked against the accompanying technical report.

Sources (2)
Sources
ESGold Releases Updated Preliminary Economic Assessment — September 4, 2025  (opens in a new tab) Location: PDF pp. 1–2, “Updated PEA Highlights” and paragraph immediately below: NPV, IRR, payback, revenue, CapEx, operating cost, four-year mine life, metal-price and exchange-rate assumptions, and replacement of the 2023 PEA.
ESGold 2025 Montauban Technical Report  (opens in a new tab) Location: Printed pp. 6–8 / PDF pp. 23–25, Tables 1-3 through 1-7 and PEA caution; printed p. 186 / PDF p. 203, §21.3 and Table 21-1, including approximately C$2.13M required working capital in addition to CapEx.

Permits & Environment

  • Tailings authorizations: September 14, 2012 & March 13, 2014; transferred to ESGold in March 2023, per the 2025 technical report.
  • ESGold reports tailings construction & operations permitted.
  • Receipt of Québec exploration authorization (ATI) announced July 28, 2026.
  • These do not establish approval for future hard-rock mining.
  • Environmental compliance, reclamation & applicable financial guarantees remain required.
  • ESGold’s November 3, 2026 disclosure identifies an annual tailings-processing permit limit of 300,000 tonnes; an increase requires further permits.
Sources (2)
Sources
ESGold Receives Exploration Authorization from Québec Government — July 28, 2026  (opens in a new tab) Location: Opening two paragraphs and “Exploration Program Highlights”: receipt and purpose of the ATI for planned drilling, distinguished from the permitted tailings reprocessing operation.
ESGold second aggregate MOU — November 3, 2026  (opens in a new tab) Location: Opening paragraphs; non-binding terms following the CEO’s comments.

Infrastructure & Access

  • 20,000 sq. ft. processing facility.
  • Designed capacity: approx. 1,000 tonnes/day.
  • On-site laboratory and gold room.
  • 1.3 km hydropower service line.
  • All-weather road access.
  • Approx. 80 km from Québec City.
  • Approx. 60 km from Trois-Rivières.
  • The October shareholder letter shows a modular building under construction to support equipment unloading and sheltered work during winter.
  • The November 9 Form 5A describes the main steel mill building as expanded from 16,000 to 20,000 sq. ft. and reports mill engineering completed by Alphard Engineering in Montréal. It also identifies the hydro connection and access road. This does not establish completion of equipment installation, commissioning or the separate modular building mentioned in the shareholder letter.
Sources (4)
Sources
ESGold Investor Presentation — October 12, 2026  (opens in a new tab) Location: Printed slides 6–7 / PDF pp. 7–8, “Location” and “Infrastructure & Land Package”: stated 80 km/60 km distances, 20,000 sq. ft. facility, 1,000-tonne-per-day rated capacity, 1.3 km hydropower service and all-weather access. Distance figures conflict with the 2025 technical report and should be reviewed.
ESGold Completes Montauban Mill Building Construction — November 10, 2025  (opens in a new tab) Location: First two paragraphs and “Next Steps Toward Production”: completed main mill building, on-site gold room and laboratory; subsequent equipment installation and commissioning.
ESGold October shareholder letter — posted November 2, 2026  (opens in a new tab) Location: PDF p. 2, Figure 4 caption
ESGold Form 5A Annual Listing Summary — year ended June 30, 2026; dated November 9, 2026; published November 10, 2026  (opens in a new tab) Location: Section 5(a), PDF pp. 5–6: plant description, hydro connection, access road, expansion from 16,000 to 20,000 square feet and mill engineering completed by Alphard Engineering.

Processing & Metallurgy

  • Planned: screening & mica separation; grinding & cyanide leaching.
  • Clarification, de-oxygenation & Merrill-Crowe recovery into Au/Ag doré.
  • Falcon concentrator: gravity recovery of liberated precious metals; not a replacement for Merrill-Crowe.
  • Thickeners: solids/liquid separation & process-water reuse.
  • PEA model: 89.3% Au & 77% Ag recovery.

Installation & commissioning remain underway; operating recoveries are unproven.

Sources (3)
Sources
ESGold 2025 Montauban Technical Report  (opens in a new tab) Location: Printed pp. 5–6 / PDF pp. 22–23, §1.6, including 89.3% Au and 77% Ag recoveries used for cash flow; printed pp. 162–164 / PDF pp. 179–181, §17.2–17.6, for screening, mica recovery, grinding, Falcon concentrator, thickening, cyanidation, clarification, de-aeration and precious-metal recovery.
ESGold Confirms Final Processing Methodology at Montauban — October 28, 2025  (opens in a new tab) Location: Opening paragraphs and “Key Highlights,” especially “Processing Strategy Confirmed”: gravity test result and decision to process feedstock through the Merrill-Crowe closed circuit.
ESGold Advances Montauban Commissioning with Arrival of Key Processing Equipment — September 10, 2026  (opens in a new tab) Location: Opening paragraphs; “Sepro Falcon Gravity Concentrator,” “Industrial Thickeners” and “From Equipment Procurement to Plant Integration”: equipment functions and ongoing installation, integration and commissioning.

Other Relevant Info

  • Historical North Zone: 274,500 t @ 2.80 g/t Au & 15 g/t Ag.
  • Historical South Zone: 114,473 t @ 6.10 g/t Au & 94 g/t Ag.
  • Combined: 388,973 t @ 3.76 g/t Au & 38.33 g/t Ag; approx. 47,198 oz Au & 480,998 oz Ag.
  • Historical & non-current under NI 43-101; not a current resource or reserve.
  • Current drilling tests historical mineralization & possible extensions.
Sources (2)
Sources
ESGold Investor Presentation — October 12, 2026  (opens in a new tab) Location: Printed slide 12 / PDF p. 13, “Surface Pillar Resource Evaluation — Historical Report”: North Zone, South Zone and combined historical tonnage, grades and ounces displayed on this profile. The 2025 technical report's Table 25-5 presents different South Zone figures.
ESGold Commences Diamond Drilling at Its Montauban Project — September 3, 2026  (opens in a new tab) Location: “Building a More Comprehensive Geological Model” and “Historical Estimates”: drilling tests and evaluates historical mineralization; historical estimates are not treated as current mineral resources or reserves.

Progress to date

Milestones Accomplished

Milestones are ordered by the date of the latest reported accomplishment; some grouped work began earlier.

Tailings Resource, Metallurgy & PEA

Tailings resource work was incorporated into the 2025 PEA. Updated PEA results were announced September 4, 2025; the Merrill-Crowe processing approach was confirmed October 28, 2025.

Completed

Sources (3)
Sources
Montauban NI 43-101 technical report & PEA — effective July 21, 2025  (opens in a new tab) Location: Printed p. 148 / PDF p. 165, section 14.9.3: tailings MRE effective March 2, 2023.
ESGold Releases Updated Preliminary Economic Assessment — September 4, 2025  (opens in a new tab) Location: PDF pp. 1–2, announcement date & “Updated PEA Highlights”.
ESGold Confirms Final Processing Methodology at Montauban as Construction Nears Completion — October 28, 2025  (opens in a new tab) Location: Opening paragraphs 2–4 & “Key Highlights”: metallurgy and final processing approach.

Mill & Processing Facility Construction

Completed the main mill building, concrete flooring, interior divisions, laboratory & gold room. Building completion is separate from commissioning the processing circuit.

Completed

Source (1)
Source
ESGold Completes Montauban Mill Building Construction and Moves Toward Production Readiness — November 10, 2025  (opens in a new tab) Location: Opening 2 paragraphs: main building, flooring, interior divisions, gold room & laboratory complete.

Strategic Claim Agreements & Additional Claim Staking

The July agreements covered 44 additional claims totalling approximately 2,448 hectares. ESGold’s October 22 annual filings report delivery of C$70,000 and 600,000 shares under two adjacent-claim purchase agreements. On November 18, ESGold announced that it had staked another 41 claims covering approximately 2,224 hectares during November. Subject to final claim-registry verification, the company reported an expanded total of approximately 541 claims covering 26,787 hectares. The reported total is provisional and is not reconciled to the previously disclosed 485 claims.

Purchase agreements completed; additional staking announced — registry verification pending

Sources (5)
Sources
ESGold Executes Definitive Agreement to Acquire Strategic Montauban Claims — July 14, 2026  (opens in a new tab) Location: Opening paragraph & “Transaction Details”: 44 claims, consideration, no retained royalty & original closing conditions.
ESGold audited annual financial statements — June 30, 2026  (opens in a new tab) Location: Printed p. 28 / PDF p. 28, Note 17 “Subsequent Events”, paragraph 1: consideration delivered.
ESGold investor presentation — October 12, 2026  (opens in a new tab) Location: Printed slide 7 / PDF p. 8, “Infrastructure & Land Package”: reported total land position.
ESGold Form 5A Annual Listing Summary — year ended June 30, 2026; dated November 9, 2026; published November 10, 2026  (opens in a new tab) Location: Section 5(a), PDF p. 5: reported Montauban land position of 485 mining claims covering 24,414 hectares.
ESGold strategic claim-staking release — 18 Nov 2026  (opens in a new tab)

Site Infrastructure & Water Management

The site has a 1.3 km hydropower service line & all-weather access. Mobile water-treatment equipment had arrived by the July 21 update; that release does not date construction of all existing infrastructure.

Infrastructure established; water-treatment equipment delivered

Sources (2)
Sources
ESGold Provides Major Equipment Update After Return from Technical Validation Trip in China — July 21, 2026  (opens in a new tab) Location: “Key Equipment Updates”, bullet 4; Figure 5 caption: mobile water-treatment plant delivered.
ESGold investor presentation — October 12, 2026  (opens in a new tab) Location: Printed slide 7 / PDF p. 8, “Infrastructure & Land Package”.

Commissioning Commenced

Commissioning activities were underway as equipment installation, integration & testing continued. Full-plant commissioning & operating performance had not yet been demonstrated.

Commenced; completion pending

Source (1)
Source
ESGold Advances Montauban Commissioning with Arrival of Key Processing Equipment — September 10, 2026  (opens in a new tab) Location: “From Equipment Procurement to Plant Integration”, paragraph 2: commissioning commenced; opening paragraphs 1–4: installation & integration.

Expanded ANT & Geological Model

The initial 10 km² ANT survey supported a February 2026 interpretation of a possible corridor approx. 900 m deep & over 2 km along strike. ANT-2 recorded data at 200 stations from March 19–April 19, 2026. The September 15 integrated interpretation covers approx. 70 km², combining 1,637 drillholes—including 90 added historical holes—with 1,707 regional samples. Southern & eastern corridors were prioritized. These interpretations do not establish mineralized continuity or a mineral resource.

Completed

Sources (2)
Sources
ESGold Launches 70 km² District-Scale ANT Survey at Montauban — February 20, 2026  (opens in a new tab) Location: Opening paragraphs 2–3: original 2025 survey & earlier model; “Key Highlights of Survey and Program”.
ESGold Completes Expanded ANT Survey and 3D Geological Model — September 15, 2026  (opens in a new tab) Location: “Highlights”, bullets 2–5; “Expanded ANT-2 Survey”, paragraph 1; “Geological Interpretation and Exploration Implications”.

Processing Equipment Procurement & Delivery

Earlier deliveries included the doré furnace, Falcon concentrator and thickeners. ESGold’s October shareholder letter reports 19 equipment containers at Montauban, six additional flat-rack containers at sea and three preparing to leave China. Further delivery, installation and circuit integration remained outstanding.

In progress — partial delivery confirmed; remaining shipments pending

Sources (5)
Sources
ESGold Receives Doré Melting Furnace at Montauban Project Site — June 11, 2026  (opens in a new tab) Location: Opening announcement paragraph: doré melting furnace received at site.
ESGold Provides Major Equipment Update After Return from Technical Validation Trip in China — July 21, 2026  (opens in a new tab) Location: Opening paragraph 2 & “Key Equipment Updates”, bullets 1–3: inspections and shipment approval.
ESGold Advances Montauban Commissioning with Arrival of Key Processing Equipment — September 10, 2026  (opens in a new tab) Location: Opening paragraphs 1–2: Falcon concentrator & thickeners received.
ESGold Surpasses 4,000 Metres Drilled at Montauban, Expanding Drilling Beyond the Historic Mine — October 20, 2026  (opens in a new tab) Location: “Drilling and Equipment Highlights”, final bullet: 19 containers at sea & 8 scheduled to depart.
ESGold October shareholder letter — posted November 2, 2026  (opens in a new tab) Location: PDF pp. 1–2: construction update, equipment-container shipments and Figure 4.

Exploration Authorized & Drilling Started

Québec exploration authorization was announced July 28 & drilling commencement September 3. On October 20, ESGold reported approx. 4,074 m drilled, over 80% of the planned 5,000 m program, extending into southern & deeper targets. Totals remain subject to reconciliation; assays were pending.

Authorization received & drilling commenced; program ongoing

Sources (3)
Sources
ESGold Receives Exploration Authorization from Québec Government — July 28, 2026  (opens in a new tab) Location: Opening paragraph: receipt of ATI.
ESGold Commences Diamond Drilling at Its Montauban Project, Québec — September 3, 2026  (opens in a new tab) Location: Opening paragraphs 1–3: commencement & planned 5,000 m / 29-hole program; “Principal Objectives of The Drill Program”.
ESGold Surpasses 4,000 Metres Drilled at Montauban, Expanding Drilling Beyond the Historic Mine — October 20, 2026  (opens in a new tab) Location: “Drilling and Equipment Highlights”, bullets 1–3; “Moving Beyond the Historic Mine”.

Permitting, Funding & Project Development — Ongoing Status

ESGold reports tailings-project permits secured, funding through first doré & over $20M invested in Montauban development. Installation & commissioning continue; first production and revenue remain pending. Historical spending is separate from remaining funding and PEA capital estimates; annual filings retain going-concern uncertainty.

Ongoing development — not a completed production milestone

Sources (3)
Sources
ESGold investor presentation — October 12, 2026  (opens in a new tab) Location: Printed slide 5 / PDF p. 6, “Montauban Project”: funding through first doré; printed slide 16 / PDF p. 17, “Work Completed to Date”: cumulative spending.
ESGold Advances Montauban Commissioning with Arrival of Key Processing Equipment — September 10, 2026  (opens in a new tab) Location: “About ESGold Corp.”: issuer funding description; “From Equipment Procurement to Plant Integration”: commissioning status.
ESGold audited annual financial statements — June 30, 2026  (opens in a new tab) Location: Printed p. 9 / PDF p. 9, Note 1 “Nature and Continuance of Operations”: going-concern uncertainty.

Aggregate Reuse MOUs Signed

ESGold signed two non-binding MOUs for potential reuse of neutralized Montauban residue as construction aggregate: up to 300,000 tonnes annually with Culture H. Dolbec Inc. and 200,000 tonnes annually with Gestion D.S. 50 Inc. Combined potential: up to 500,000 tonnes annually. Supply remains subject to testing, applicable approvals and definitive agreements; pricing is unsettled and purchases are not guaranteed.

MOUs signed; non-binding

Sources (2)

UPCOMING POTENTIAL DEVELOPMENTS

Pending Catalysts

Items are presented in editorial order and are not necessarily chronological.

Drilling Completion & Assay Results

Complete & reconcile the planned approx. 5,000 m program and publish assays after receipt, QA/QC & technical interpretation. Assays need not wait for all drilling to finish. The latest reported total was approx. 4,074 m in the October 20 release; visible sulphides do not establish grades.

In Progress

Sources (2)
Sources
ESGold Surpasses 4,000 Metres Drilled at Montauban, Expanding Drilling Beyond the Historic Mine — October 20, 2026  (opens in a new tab) Location: “Drilling and Equipment Highlights”, bullet 1; opening paragraphs 2–4: progress & assays pending.
ESGold Commences Diamond Drilling at Its Montauban Project, Québec — September 3, 2026  (opens in a new tab) Location: “Core Processing, Assaying and Quality Control”, final paragraph: reporting after receipt, verification & interpretation.

Remaining Equipment Delivery

Receive the outstanding shipments identified in the October shareholder letter: six flat-rack containers at sea and three preparing to leave China. Nineteen containers were already on site.

In Progress

Sources (2)
Sources
ESGold Surpasses 4,000 Metres Drilled at Montauban, Expanding Drilling Beyond the Historic Mine — October 20, 2026  (opens in a new tab) Location: “Drilling and Equipment Highlights”, final bullet; “Equipment Delivery and Mill Build-Out Update”.
ESGold October shareholder letter — posted November 2, 2026  (opens in a new tab) Location: PDF pp. 1–2: construction update; equipment shipments and Figure 4.

Equipment Installation & Plant Integration

Install delivered processing equipment & complete mechanical and electrical integration across the circuit. The November 9 Form 5A includes outstanding equipment installation within its mill-completion objective for the next six months. The C$2.5 million estimate covers the combined remaining mill work, testing and commissioning; it is not a separate installation-only budget.

In Progress

Sources (2)
Sources
ESGold Advances Montauban Commissioning with Arrival of Key Processing Equipment — September 10, 2026  (opens in a new tab) Location: Opening paragraph 4; “From Equipment Procurement to Plant Integration”, paragraphs 1–2.
ESGold Form 5A Annual Listing Summary — year ended June 30, 2026; dated November 9, 2026; published November 10, 2026  (opens in a new tab) Location: Section 5(b), PDF p. 6: “Mill completion” — outstanding equipment installation, testing and commissioning; six-month objective and C$2.5 million estimated cost.

Commissioning & Operational Readiness

Complete individual-system & full-plant commissioning, testing and operational-readiness checks. ESGold’s November 9 Form 5A includes testing and commissioning within the remaining mill-completion work targeted for the next six months, at a combined estimated cost of C$2.5 million. This is the same mill estimate referenced under Equipment Installation & Plant Integration, not an additional C$2.5 million. Completion remains unconfirmed.

In Progress

Sources (2)
Sources
ESGold Advances Montauban Commissioning with Arrival of Key Processing Equipment — September 10, 2026  (opens in a new tab) Location: “From Equipment Procurement to Plant Integration”, paragraph 2 & Pierre-Marc Gagnon’s following commentary.
ESGold Form 5A Annual Listing Summary — year ended June 30, 2026; dated November 9, 2026; published November 10, 2026  (opens in a new tab) Location: Section 5(b), PDF p. 6: “Mill completion” — testing and commissioning are included in the combined six-month mill-completion objective and C$2.5 million estimate.

Historical Mineralization & Extension Tests

Assess historic-mine, southern & deeper targets, including possible extensions beyond the workings. Logged veins, alteration & sulphides require laboratory assays and technical interpretation to establish grades and significance.

Pending assay results

Sources (2)
Sources
ESGold Commences Diamond Drilling at Its Montauban Project, Québec — September 3, 2026  (opens in a new tab) Location: “Principal Objectives of The Drill Program”, 3 bullets & following 3 paragraphs.
ESGold Surpasses 4,000 Metres Drilled at Montauban, Expanding Drilling Beyond the Historic Mine — October 20, 2026  (opens in a new tab) Location: “Moving Beyond the Historic Mine”; visual-observation limitations below the drill-hole table.

Initial Processing & Recovery Results

ESGold targets commencement of historic-tailings processing within the next six months in its November 9 Form 5A, following completion and commissioning of the mill. Estimated processing start-up cost: C$750,000. Actual throughput and gold/silver recoveries would require subsequent operating disclosure; the filing provides neither recovery results nor a separate deadline for reporting them.

Pending

Sources (3)
Sources
ESGold Advances Montauban Commissioning with Arrival of Key Processing Equipment — September 10, 2026  (opens in a new tab) Location: “From Equipment Procurement to Plant Integration”, paragraph 2: design capacity, flowsheet & commissioning.
Montauban NI 43-101 technical report & PEA — effective July 21, 2025  (opens in a new tab) Location: Printed p. 5 / PDF p. 22, section 1.6: processing design & financial-model recovery assumptions.
ESGold Form 5A Annual Listing Summary — year ended June 30, 2026; dated November 9, 2026; published November 10, 2026  (opens in a new tab) Location: Section 5(b), PDF p. 6: “Commencement of tailings processing” — six-month objective following mill completion and commissioning; estimated start-up cost of C$750,000.

First Doré, Shipment & Revenue

Confirm first gold & silver doré, the first shipment to Ocean Partners & first operating revenue. Each is a separate milestone.

Pending

Sources (2)
Sources
ESGold Signs Definitive Gold and Silver Doré Purchase Agreement with Ocean Partners — May 26, 2026  (opens in a new tab) Location: “Strengthening the Path Toward Production”: purchase coverage, EXW collection & provisional/final settlement.
ESGold Advances Montauban Commissioning with Arrival of Key Processing Equipment — September 10, 2026  (opens in a new tab) Location: “Montauban: Advancing Operations and Exploration”, paragraphs 1–2: intended operation and cash generation.

Commercial Production & Operating Cash Flow

Demonstrate repeatable throughput, recoveries, operating costs & sustained operating cash flow. A first pour alone does not establish these outcomes.

Pending

Source (1)
Source
ESGold Advances Montauban Commissioning with Arrival of Key Processing Equipment — September 10, 2026  (opens in a new tab) Location: “Montauban: Advancing Operations and Exploration”, paragraphs 1–2; background for the intended operating transition.

Geological Model & Follow-Up Exploration

Integrate new drill & assay data into the model, validate the historical database and rank follow-up targets, including southern & eastern corridors. ESGold’s November 9 Form 5A estimates C$3.1 million for continued drilling and evaluation of recent drilling and other exploration work within the next twelve months, to assess additional mineralization potential and whether further exploration is warranted. This broad objective does not specify a final next-phase hole list or guarantee assay, resource or study results. Further drilling depends on technical review, planning & execution. The model is not an MRE.

Ongoing evaluation; further work planned

Sources (3)
Sources
ESGold Completes Expanded ANT Survey and 3D Geological Model — September 15, 2026  (opens in a new tab) Location: “Framework for 2027 Exploration Planning”, Phases 1–3; “Technical Disclosure”.
ESGold Surpasses 4,000 Metres Drilled at Montauban, Expanding Drilling Beyond the Historic Mine — October 20, 2026  (opens in a new tab) Location: “Turning Exploration Data Into Better Targets”, paragraphs 1–2.
ESGold Form 5A Annual Listing Summary — year ended June 30, 2026; dated November 9, 2026; published November 10, 2026  (opens in a new tab) Location: Section 5(b), PDF p. 6: “Exploration Activities” — continued drilling and evaluation of recent drilling and other exploration work; twelve-month objective and C$3.1 million estimated cost.

Potential Current Hard-Rock Mineral Resource Estimate

Current drilling may establish whether a current NI 43-101 hard-rock MRE is warranted & what further work is required. It depends on sufficient drilling, assays, database validation, QA/QC & technical review. Historical estimates remain non-current.

Conditional future milestone; timing unconfirmed

Source (1)
Source
ESGold Commences Diamond Drilling at Its Montauban Project, Québec — September 3, 2026  (opens in a new tab) Location: “Historical Estimates”, both paragraphs; André Gauthier commentary on determining work needed for a current evaluation.

Potential Hard-Rock Preliminary Economic Assessment

A hard-rock PEA could evaluate development if sufficient current resource & technical information supports it. No commissioned hard-rock PEA or publication timetable was identified in the disclosures reviewed through November 9, 2026. It would be separate from the existing tailings PEA.

Potential future study — not an announced commitment

Source (1)
Source
ESGold Receives Exploration Authorization from Québec Government — July 28, 2026  (opens in a new tab) Location: “Next Steps for the Company”, paragraph beginning “Any potential future extraction of crown-pillar material”: further drilling, engineering, economic analysis & approvals.

Claim Registry Verification

Obtain final verification of the November 2026 claim staking and clarify the expanded total claim count. ESGold announced 41 additional claims covering approximately 2,224 hectares and reported a resulting total of approximately 541 claims covering 26,787 hectares, subject to final claim-registry verification. The release does not reconcile that total with the previously reported 485 claims; 485 plus 41 equals 526 rather than 541.

Pending final registry verification and claim-count reconciliation

Sources (3)

Ocean Partners Working-Capital Facility

Possible use of the C$9M facility in conditional C$3M & C$6M tranches. C$0 was drawn at June 30, 2026; later borrowing requires confirmation and would create interest, fee & repayment obligations.

Optional future funding

Sources (2)
Sources
ESGold Signs Definitive Gold and Silver Doré Purchase Agreement with Ocean Partners — May 26, 2026  (opens in a new tab) Location: “Key Highlights (Ocean Partners Agreement)” & “Strengthening the Path Toward Production”.
ESGold audited annual financial statements — June 30, 2026  (opens in a new tab) Location: Printed p. 19 / PDF p. 19, Note 9 “Credit Facility”: tranche timing, conditions & nil June 30 drawdown.

Aggregate Testing & Definitive Agreements

Complete material characterization and environmental testing, obtain applicable approvals, and negotiate definitive aggregate-supply agreements and commercial terms. The November 9 Form 5A estimates C$200,000 for preliminary testing and evaluation of processed tailings for aggregate use within the next twelve months. The initiative remains exploratory and at the MOU stage. This target concerns evaluation; it does not set a deadline for approvals, definitive agreements, deliveries or revenue.

Planned evaluation; supply remains conditional and MOUs non-binding

Sources (3)
Sources
ESGold first aggregate MOU — October 29, 2026  (opens in a new tab)
ESGold second aggregate MOU — November 3, 2026  (opens in a new tab)
ESGold Form 5A Annual Listing Summary — year ended June 30, 2026; dated November 9, 2026; published November 10, 2026  (opens in a new tab) Location: Section 5(b), PDF p. 6: “Construction-material evaluation” — preliminary testing and evaluation, twelve-month objective, estimated C$200,000 cost and exploratory/MOU-stage status.

COMPANY & PROJECT

Key Company & Project Factors

  • Tailings development and hard-rock exploration are separate routes to potential value, with different evidence requirements.
Sources (2)
Sources
Montauban commissioning update — September 10, 2026  (opens in a new tab) Location: Montauban: Advancing Operations and Exploration — tailings operating plans and parallel exploration strategy.
Montauban drilling update — October 20, 2026  (opens in a new tab) Location: Turning Exploration Data Into Better Targets; Equipment Delivery and Mill Build-Out Update — exploration validation and processing-facility development.
  • Current drilling and the expanded geological model can test historical mineralization and new targets; neither establishes an extended mine life or a current hard-rock resource by itself.
Sources (2)
Sources
Montauban drilling update — October 20, 2026  (opens in a new tab) Location: Drilling and Equipment Highlights; Turning Exploration Data Into Better Targets — drilling progress, pending assays and limits of the geological interpretation.
Expanded ANT survey and geological model — September 15, 2026  (opens in a new tab) Location: Technical Disclosure — interpretive nature of the model, absence of a mineral resource estimate and further validation requirements.
  • The building is complete and commissioning is underway; production, operating recoveries and cash generation remain to be demonstrated. The November 9 Form 5A targets remaining mill completion and commencement of historic-tailings processing within the next six months, with estimated costs of C$2.5 million and C$750,000 respectively. Processing follows mill completion and commissioning; the targets do not establish production or cash generation.
Sources (3)
Sources
Montauban commissioning update — September 10, 2026  (opens in a new tab) Location: From Equipment Procurement to Plant Integration — first two paragraphs; operating status and cash-flow objectives in the following section.
Montauban drilling update — October 20, 2026  (opens in a new tab) Location: Equipment Delivery and Mill Build-Out Update — remaining installation, integration, testing and commissioning activities.
ESGold Form 5A Annual Listing Summary — year ended June 30, 2026; dated November 9, 2026; published November 10, 2026  (opens in a new tab) Location: Section 5(b), PDF p. 6: mill-completion and tailings-processing objectives, their sequence, six-month periods and estimated costs.
  • Ocean Partners provides an agreed doré sales route and conditional financing access. Borrowing and shipments remain distinct events.
Sources (2)
Sources
Ocean Partners agreement — May 26, 2026  (opens in a new tab) Location: Agreement highlights and detailed terms — doré purchases, conditional financing tranches, optional drawdown and shipment payments.
Annual financial statements — June 30, 2026  (opens in a new tab) Location: Page 19, Note 9 — credit facility conditions and amount drawn as at June 30, 2026.
  • The updated tailings PEA provides a preliminary economic case under stated metal, mica and exchange-rate assumptions. Both pre-tax and after-tax results appear in Mining and Technical Information.
Source (1)
Source
Montauban PEA — 2025  (opens in a new tab) Location: Printed pp. 192–196 (PDF pp. 209–213), Sections 22.1–22.5; Tables 22-1 and 22-2.
  • Study results and future developments are uncertain. Mineral resources that are not mineral reserves do not have demonstrated economic viability.
Source (1)
Source
Montauban PEA — 2025  (opens in a new tab) Location: Printed p. 196 (PDF p. 213), Section 22.5 — uncertainty of results and resource-versus-reserve caution.
  • Potential construction-aggregate sales could add another revenue source alongside precious-metal recovery, subject to testing, approvals and commercial agreements.
Source (1)
Source
Second aggregate MOU — November 3, 2026  (opens in a new tab) Location: Opening three paragraphs; reclamation strategy discussion; paragraph after the CEO comments covering non-binding terms, testing, approvals and definitive agreements.
  • The expanded claim total remains approximate and subject to final claim-registry verification. ESGold has not reconciled the reported 541-claim total with its previous 485-claim position plus the 41 newly announced claims. Historical production in the Montauban district does not establish mineralization on the newly staked ground, and future evaluation depends on geological results, technical priorities and available capital.

COMPANY & PROJECT

Company & Project Risks

  • ESGold reported no operating revenue at June 30, 2026. Its audited annual financial statements retain going-concern uncertainty; reported cash is dated and must be considered alongside exploration-spending commitments & other liabilities.
Sources (2)
Sources
Annual financial statements — June 30, 2026  (opens in a new tab) Location: Page 5, financial position; p. 9, Note 1, going concern; p. 25, Note 12, exploration-spending commitments and related liabilities.
Annual MD&A — June 30, 2026  (opens in a new tab) Location: Page 5, Montauban discussion — no operating revenue at June 30, 2026 and dependence on financing and successful project execution.
  • Historical hard-rock estimates are non-current. ANT interpretations and visible sulphides require drilling, laboratory assays and technical validation; targets may not become resources or extend mine life.
Sources (3)
Sources
Drilling commencement and historical estimates — September 3, 2026  (opens in a new tab) Location: Historical Estimates — both paragraphs; Core Processing, Assaying and Quality Control — analytical verification requirements.
Montauban drilling update — October 20, 2026  (opens in a new tab) Location: Sulphide-observation table and paragraph immediately below it — visual observations, unestablished true widths and absence of demonstrated grades, continuity or economic viability.
Expanded ANT survey and geological model — September 15, 2026  (opens in a new tab) Location: Technical Disclosure — model limitations and additional drilling, sampling, QA/QC and independent review requirements.
  • The production decision was not based on a feasibility study demonstrating the economic and technical viability of mineral reserves, increasing the risk of economic or technical failure.
Source (1)
Source
Mill building and production-decision disclosure — November 10, 2025  (opens in a new tab) Location: Cautionary Note on Production Decision — both paragraphs describing the decision basis and increased economic or technical failure risk.
  • Permits, reclamation, financial guarantees, royalties, land transfers and environmental compliance can affect costs and development options.
Sources (3)
Sources
Montauban PEA — 2025  (opens in a new tab) Location: Printed pp. 29–31 (PDF pp. 46–48), Sections 4.5–4.7; printed pp. 177–182 (PDF pp. 194–199), Sections 20.2–20.3.
Montauban claim acquisition agreements — July 14, 2026  (opens in a new tab) Location: Transaction Details — final paragraph describing staged closing, mineral claim transfers and exchange approvals.
Annual financial statements — June 30, 2026  (opens in a new tab) Location: Page 18, Note 7, asset retirement obligation; p. 28, Note 17, subsequent claim acquisitions and consideration delivered.
  • Installation, commissioning and ramp-up may face delays, cost overruns or results below designed throughput and modelled recoveries. ESGold’s November 9 Form 5A sets six-month targets for mill completion and processing commencement and twelve-month targets for exploration and preliminary construction-material evaluation. Its four estimates add to C$6.55 million (T$R calculation). They cover distinct objectives and are not a reconciled all-in budget, a current cash balance or a quantified funding gap. The target periods and estimated costs may change.
Sources (3)
Sources
Montauban commissioning update — September 10, 2026  (opens in a new tab) Location: Plant integration discussion and Operations Director comments — progressive commissioning, remaining work and designed processing capacity.
Montauban PEA — 2025  (opens in a new tab) Location: Printed p. 31 (PDF p. 48), Section 4.7; printed p. 192 (PDF p. 209), Section 22.1.
ESGold Form 5A Annual Listing Summary — year ended June 30, 2026; dated November 9, 2026; published November 10, 2026  (opens in a new tab) Location: Section 5(b), PDF p. 6: four objectives, periods and estimated costs. Section 5(c), PDF pp. 6–7: funding response refers to the attached annual financial statements and MD&A rather than providing a new reconciliation of current funds to these estimates.
  • Ocean Partners borrowing is conditional and carries interest, fees and repayment obligations. Contractual metal-delivery commitments do not establish a matching resource or production forecast.
Sources (2)
Sources
Ocean Partners agreement — May 26, 2026  (opens in a new tab) Location: Detailed agreement terms — minimum metal deliveries, drawdown conditions, arrangement fees, interest and repayment; next steps concerning potential crown-pillar extraction.
Annual financial statements — June 30, 2026  (opens in a new tab) Location: Page 19, Note 9 — conditional credit facility, production-timing requirements and borrowing position at June 30, 2026.
  • PEA economics are preliminary and depend on gold, silver and mica prices, exchange rates, costs and successful product sales. Mica revenue is an assumption, not demonstrated recurring income.
Source (1)
Source
Montauban PEA — 2025  (opens in a new tab) Location: Printed pp. 174–175 (PDF pp. 191–192), Section 19.3; printed pp. 192–196 (PDF pp. 209–213), Sections 22.1–22.5.
  • Further equity financing or security exercises can dilute existing shareholders. First doré would not by itself prove sustained profitability or positive operating cash flow.
Sources (2)
Sources
Annual financial statements — June 30, 2026  (opens in a new tab) Location: Page 9, Note 1; pp. 19–24, Note 10, share capital and securities; pp. 27–28, Note 15, financing and capital management.
Annual MD&A — June 30, 2026  (opens in a new tab) Location: Page 7, operating cash flow and uncertainty of future revenue; p. 11, Capital Resources; p. 12, outstanding shares, options and warrants.
  • Aggregate income remains unproven. Non-binding arrangements, testing requirements, regulatory approvals and unresolved commercial terms could prevent sales or limit their financial contribution.
Source (1)
Source
Second aggregate MOU — November 3, 2026  (opens in a new tab) Location: Paragraph immediately after the CEO comments — non-binding MOUs, indicative volumes, no minimum commitments, testing, approvals, definitive agreements and unset pricing.

RELATED COMPANY DISCLOSURES

Company Disclosure Pathways

Follow ESGold’s disclosed production and exploration progress at Montauban. The pathways connect reported developments to dated company sources and show what remains outstanding.

Open Company Disclosure Pathways

T$R PERSPECTIVE

T$R Analysis & Opinion

COVERAGE RATIONALE

Why T$R Follows This Company

  • T$R follows ESGold because Montauban offers the potential to establish gold and silver production and pursue growth beyond its initial tailings operation.
  • The attraction is the combination of production development, existing infrastructure, a historical gold-silver resource and broader exploration opportunities within the same project area. Successful tailings operations could establish an operating foundation, while drilling could help assess the potential for additional mineral resources, a longer mine life and further growth.
  • For T$R, that combination makes ESGold particularly interesting: there are tangible development milestones to evaluate today and a larger exploration opportunity whose scale and economic significance remain to be established.

THESIS IN FOCUS

Current T$R Thesis

  • T$R’s thesis is that Montauban’s tailings operation could become a starting point for longer-term growth. If operations generate surplus cash after costs and other commitments, that cash could help fund exploration and reduce reliance on issuing new shares.
  • GoGold successfully expanded beyond its Parral tailings operation by acquiring and advancing Los Ricos, evolving into a precious-metals producer with a substantial exploration and development portfolio. For historical context, its estimated basic market capitalization increased from approximately C$33 million at its November 2018 share-price low to approximately C$1.38 billion at the November 13, 2026 close. That increase reflects changes in both share price and shares outstanding; it is not a measure of shareholder returns or a valuation target for ESGold.
  • T$R sees a possible parallel at Montauban, where ESGold is pursuing tailings production while testing exploration opportunities that could support additional resources, a longer mine life and future production growth.
  • ESGold’s particular appeal is that production development and exploration are advancing together. T$R believes successful operating results and meaningful exploration results could reinforce each other, giving investors reasons to reassess both Montauban’s operating value and its longer-term growth potential within the same development period. This remains an unproven thesis, dependent on execution and results.

T$R EDITORIAL POSITION

T$R Opinion

  • T$R considers ESGold an exceptionally compelling, high-risk opportunity because successful execution at Montauban could support a substantially higher market valuation.
  • T$R’s enthusiasm rests on that potential and the milestones that can test it. Consistent production, demonstrated operating margins and drilling that supports additional mineral resources would strengthen the case. Persistent delays, funding pressure, excessive dilution or disappointing results would weaken it.
  • T$R remains highly enthusiastic about what Montauban could become, while recognizing that the investment case must ultimately be supported by results. This opinion may change or prove incorrect; it is not a valuation conclusion, price target or investment recommendation.

COMPANY NEWS

Company News Releases

Show More company news releases (7)

COMPANY MEDIA

Company Videos

Videos are produced and published by the company, its representatives, or third parties. Their inclusion does not constitute an endorsement or independent verification by T$R.

August 2026

ESGold is cleaning up at Montauban

Miningcomau interviews ESGold CEO Gordon Robb about the Company’s tailings-reprocessing plans and exploration at Montauban. The discussion presents Company statements and intentions; it does not establish production or exploration outcomes.

November 2025

Montauban 3D Geological Model - ESGold Corp

ESGold’s video illustrates its geological interpretation of Montauban using historical information & geophysics. Read it alongside the later ANT model & drilling disclosures.

Why it matters:

The model helps explain exploration targets; it does not establish mineralized continuity, a current hard-rock resource or a discovery. Drilling & assays are needed to test the interpretation.

February 2026

ESGold Technical 3d Model Walkthrough

This linked YouTube video describes ESGold’s integrated 3D geological model of the Montauban Project. The model combines historical mining and drilling records with geophysics, including Ambient Noise Tomography (ANT), to depict interpreted structures and exploration targets. Drilling and assays are needed to test grades and mineralized continuity. The model does not establish a new hard-rock resource or economic viability.

T$R Transparency & Conflicts

T$R’s Full Disclosure on ESGold

T$R Relationship

T$R’s ESGold content should not be treated as independent or unbiased.

T$R independently initiated ESGold coverage on 1 February 2022 without compensation to initiate it.

The ESGold Company Profile and ESGold Company Disclosure Pathways page are currently classified as No Direct Content Compensation: T$R receives no current direct compensation for those two pages. This classification does not establish independence or impartiality.

T$R’s historical compensation, continuing ESGold shareholding and the other interests and relationships disclosed below create financial interests, material conflicts of interest and potential bias.

D4, founder & owner of The Shareholder Report (T$R), also has a separate paid consulting relationship with ESGold. That compensation is not paid to T$R; the relationship and compensation are detailed below.

Coverage & Compensation

T$R independently initiated coverage of ESGold on 1 February 2022 and received no compensation to initiate that coverage. T$R remained uncompensated from 1 February 2022 until August 2024, a period of approximately 2.5 years.

Following T$R’s publication of a research report on 2 July 2024, ESGold compensated T$R in August 2024. On 23 August 2024, T$R—not D4 personally and not D4’s separate consulting business—received 250,000 ESGold common shares through Computershare’s Direct Registration System (DRS) in lieu of cash. T$R continues to hold those 250,000 shares.

In March 2025, T$R—not D4 personally and not D4’s separate consulting business—received C$50,000 before sales tax for creating and publishing ESGold research reports published on 8 March 2025 and 16 March 2025.

These payments compensated the identified research reports only. They were not compensation for initiating ESGold coverage and are not current direct compensation for either the ESGold Company Profile or the ESGold Company Disclosure Pathways page.

The compensated research reports should not be considered independent or unbiased. T$R’s historical compensation and continuing ownership of the 250,000 ESGold shares remain material conflicts of interest and potential sources of bias, including for ESGold content that currently receives no direct compensation.

Promotional Items

In July 2022, D4 personally received an ESGold-branded promotional hat from ESGold. The hat had nominal value and was not material.

The hat was received before D4’s separate consulting relationship with ESGold began in January 2026. It is disclosed for transparency and completeness despite its nominal value.

Ownership & Conflicts

T$R, D4 personally and D4’s spouse hold ESGold common shares. These are separate holdings and should not be treated as belonging to one recipient or account.

On 23 August 2024, T$R received 250,000 ESGold common shares as compensation in lieu of cash. T$R continues to hold all 250,000 of those shares. D4 also holds ESGold common shares personally. The financing purchases and warrant exercises listed below describe specific transactions; they do not state D4’s current total common-share holding.

The value of these holdings may increase or decrease with ESGold’s share price. T$R, D4 and D4’s spouse therefore have direct financial interests in ESGold’s market performance. These interests create material conflicts of interest and potential bias.

These conflicts remain relevant even when particular ESGold content is classified as No Direct Content Compensation. T$R’s and D4’s final editorial control does not eliminate the financial interests, material conflicts of interest or potential bias created by these holdings.

D4 Separate Consulting Relationship

D4 serves ESGold as Corporate Strategic Consultant / Strategic Corporate Business Advisor through D4’s separate sole-proprietor consulting business. The role focuses on strategic corporate and business advisory matters. The services began at the start of January 2026 and remain ongoing unless otherwise stated.

ESGold currently pays D4 C$5,000 per month plus applicable sales tax through the sole proprietorship for advisory services. The compensation is not paid to T$R and is not compensation for creating or publishing T$R content. D4 is the person behind both activities; the shared ownership and paid relationship create a material conflict of interest and potential bias for T$R’s ESGold coverage despite their separation.

Under the current consulting arrangement, D4’s role does not include investor relations, promotional activity, securities marketing, market-awareness activity, finder activity, capital-raising activity or services related to a distribution of securities, unless specifically agreed to in writing and properly disclosed in accordance with applicable requirements.

T$R is operated separately from D4’s consulting role with ESGold. The consulting arrangement does not engage T$R to perform those activities. Any separate engagement for those activities would require a specific written agreement and proper disclosure in accordance with applicable requirements.

D4’s previously disclosed finder’s fees and personal participation in ESGold financings occurred before the consulting relationship began. Those activities were undertaken by D4 personally—not through T$R or D4’s consulting business.

As of the date of this published disclosure, D4 has no non-disclosure agreement or other confidentiality agreement with ESGold and has not received or had access to material non-public information through the consulting or advisory role.

Options, Warrants & Other Instruments

Under an option agreement dated 4 May 2026, ESGold granted D4 125,000 stock options under ESGold’s Omnibus Incentive Plan at an exercise price of C$0.505 per share. D4 personally holds the options. They are a security-based incentive connected with D4’s separate consulting relationship, in addition to the monthly cash consulting fee, and are not compensation for creating or publishing T$R content.

The agreement provides for immediate vesting and exercisability, subject to the Plan and option agreement. Scheduled expiry is 4 May 2029, subject to the agreement’s earlier-expiry provisions, including those applicable when service ends. None have been exercised, and all 125,000 options remain outstanding as of the date of this published disclosure.

D4 personally—not T$R and not D4’s separate consulting business—also holds the following outstanding ESGold warrants:

  • 568,000 warrants at C$0.30 per share, expiring 11 April 2027, received in connection with the April 2025 finder’s fee.
  • 39,720 warrants at C$0.91 per share, expiring 25 December 2026, received in connection with the July 2025 finder’s fee.
  • 300,806 warrants at C$0.30 per share, expiring 11 April 2027, acquired through D4’s personal participation in the April 2025 financing.
  • 50,000 warrants at C$0.91 per share, expiring 25 December 2026, acquired through D4’s personal participation in the November 2025 financing.

All of these warrants were received before D4’s separate consulting relationship with ESGold began in January 2026.

For previously held ESGold warrants:

  • All 195,121 warrants received by D4 in October 2024 in connection with a finder’s fee were exercised on 16 September 2025 and are no longer outstanding warrants.
  • All 150,000 warrants acquired through D4’s personal participation in the July 2022 financing expired without being exercised and are no longer outstanding warrants.

D4’s ESGold options and warrants create direct financial interests, material conflicts of interest and potential bias.

Finder’s Fees

D4 personally performed finder activity and personally received the ESGold finder’s fees and warrants disclosed below. The finder activity was not conducted through T$R or D4’s separate consulting business. The fees and warrants were not compensation to T$R or compensation for T$R content.

All the finder activity described below occurred before D4’s separate consulting relationship with ESGold began in January 2026:

  • October 2024: In connection with a private placement that closed on 30 September 2024, D4 personally received a C$19,000 finder’s fee and 195,121 warrants exercisable at C$0.15 per share and expiring on 27 September 2025. D4 exercised all 195,121 warrants on 16 September 2025. Those warrants are no longer outstanding.
  • April 2025: In connection with a financing that closed on 16 April 2025, D4 personally received finder’s fees of C$99,534.60 plus US$12,600 and 568,000 warrants exercisable at C$0.30 per share and expiring on 11 April 2027. All 568,000 warrants remain outstanding as of the date of this published disclosure.
  • July 2025: In connection with a private placement that closed on 25 June 2025, D4 personally received a C$28,995.37 finder’s fee and 39,720 warrants exercisable at C$0.91 per share and expiring on 25 December 2026. All 39,720 warrants remain outstanding as of the date of this published disclosure.

D4’s historical receipt of finder’s fees, the exercised warrants and the outstanding warrants create financial interests, material conflicts of interest and potential bias.

D4 Personal Financing Participation

D4 personally participated in the ESGold financings disclosed below using personal capital. The financings were not undertaken through T$R or D4’s separate consulting business. The securities were purchased as personal investments and were not compensation to T$R or compensation for T$R content.

All the financing participation described below occurred before D4’s separate consulting relationship with ESGold began in January 2026:

  • July 2022: D4 personally acquired 300,000 ESGold common shares at a purchase price of C$0.05 per share and 150,000 warrants exercisable at C$0.10 per share. All 150,000 warrants expired without being exercised and are no longer outstanding.
  • April 2025: D4 personally acquired 300,806 ESGold common shares at a purchase price of C$0.215 per share and 300,806 warrants exercisable at C$0.30 per share and expiring on 11 April 2027. All 300,806 warrants remain outstanding as of the date of this published disclosure.
  • November 2025: D4 personally acquired 50,000 ESGold common shares at a purchase price of C$0.73 per share and 50,000 warrants exercisable at C$0.91 per share and expiring on 25 December 2026. All 50,000 warrants remain outstanding as of the date of this published disclosure.

D4’s personal financing participation, acquired shares and outstanding warrants create direct financial interests, material conflicts of interest and potential bias.

Editorial Control & Ongoing Conflicts

T$R’s ESGold content should not be treated as independent or unbiased.

T$R’s historical compensation and continuing ESGold shareholding; D4’s and D4’s spouse’s holdings; and D4’s significant personal investment, options, warrants, prior finder’s fees, personal financing participation and ongoing paid consulting relationship create financial interests, material conflicts of interest and potential bias.

D4 receives monthly consulting compensation for advisory services through a business operated separately from T$R. These payments are not for T$R content. D4 is the person behind both activities, so their separation does not remove the material conflict or potential bias.

The No Direct Content Compensation classifications apply only to current direct compensation for the ESGold Company Profile and Company Disclosure Pathways page. They do not remove the historical compensation, securities ownership, consulting relationship or other disclosed financial interests.

T$R and D4 retain final editorial control over T$R research, analysis, opinions, wording, conclusions, publication timing and whether coverage continues. Any ESGold factual review is limited to identifying possible errors; ESGold has no editorial approval and cannot control, edit or veto T$R’s analysis, opinions or conclusions. Editorial control does not eliminate the disclosed conflicts or potential bias.

Unless expressly stated otherwise, T$R, D4 and D4’s spouse may acquire, hold or sell ESGold securities without advance notice, subject to applicable law. D4 may exercise, hold or allow options and warrants to expire. The consulting or advisory relationship may continue, change or end.

Conflicts may continue after compensation or consulting ends if securities or other financial interests remain. The disclosed facts and relationships may change; material changes will be disclosed where reasonably practicable.

Additional Disclosure & Currency

To the best of D4’s knowledge as of the date of this published disclosure, no other current material ESGold holding, payment, compensation, security or instrument, service, benefit, agreement, relationship or conflict involving T$R, D4 personally, D4’s spouse or D4’s separate sole-proprietor consulting business exists beyond the facts disclosed in these categories.

This Full Disclosure should be read together with the ESGold Summary Disclosure, the applicable ESGold Company Profile, the ESGold Company Disclosure Pathways page, any disclosure presented with a specific T$R article, post or other content, and T$R’s central general Disclosures page.

The Summary Disclosure provides a shorter overview and does not replace this Full Disclosure. A content-specific disclosure also does not replace this Full Disclosure.

The facts, holdings, compensation arrangements and relationships described here may change. Material changes will be reflected in the current published disclosure where reasonably practicable. Readers should rely on the current published version rather than an earlier version or an unpublished draft.

View General T$R Disclosures